SH 21 West Madison County Widening

The proposed SH 21/US 190 West Madison County Widening Project would increase capacity from a two-lane undivided roadway to a four-lane divided roadway. The project area extends from 0.8 miles east of the Navasota River for approximately 20 miles to North Wilson Street in Madisonville. The project would be constructed in segments.

This project is part of an overall SH 21 / US 190 corridor study from SH 6 in Bryan to Madisonville. To date, corridor improvements have been completed from SH 6 in Bryan to just east of the Navasota River. An interim passing lane project is being developed and will be constructed through Madison County.

The proposed widening project would require additional right of way and displacements.

Project Background and Improvements

SH 21, within the western half of Madison County, is a portion of the US 190 transportation corridor. US 190 is part of the National Highway System and serves as a freight and military route. Proposed improvements include:

  • Straightening sharp curves in the roadway
  • Adding two lanes (for a total of two lanes in each direction)
  • Adding 10-foot outside and four-foot inside shoulders
  • Separating opposing traffic with a divided grass median
  • Providing crossover access

The project is expected to improve safety and mobility by accommodating increasing traffic flow with additional travel lanes and by separating opposing directions of traffic with a median.

Get Involved

A detailed design schematic and environmental study will be developed. Further details and timing of right-of-way acquisition and construction will be determined once funding is identified.

The public is encouraged to subscribe for project email updates.

Downloads

Contact Us

TxDOT Bryan District
Director of Transportation Planning and Development
2591 N. Earl Rudder Freeway
Bryan, TX 77803-5190

(979) 778-2165
Email

Subscribe to Updates