Item No |
Description |
Units |
October 31, 2007 |
Twelve Month Moving |
Usage |
Quantity |
Avg Bid |
Quantity |
Avg Bid |
104 2021 |
REMOVING CONC (CURB) |
LF |
|
|
150.000 |
10.00000 |
1 |
104 2022 |
REMOVING CONC (CURB AND GUTTER) |
LF |
|
|
450.000 |
10.00000 |
1 |
132 2019 |
EMBANKMENT (VEHICLE) (ORD COMP) (TY B) |
CY |
|
|
3,438.000 |
14.98749 |
2 |
158 2003 |
SPEC EXCAV WORK (HYD EXCAVATOR) |
HR |
|
|
1,300.000 |
310.57692 |
2 |
160 2003 |
FURNISHING AND PLACING TOPSOIL (4") |
SY |
|
|
4,225.000 |
1.40866 |
2 |
162 2002 |
BLOCK SODDING |
SY |
|
|
50.000 |
8.00000 |
1 |
164 2009 |
BROADCAST SEED (TEMP) (WARM) |
SY |
|
|
2,900.000 |
0.50000 |
1 |
164 2021 |
CELL FBR MLCH SEED (PERM) (RURAL) (SANDY) |
SY |
|
|
5,345.000 |
1.34892 |
2 |
168 2001 |
VEGETATIVE WATERING |
MG |
|
|
30.000 |
36.00000 |
2 |
169 2004 |
SOIL RETENTION BLANKETS (CL 1) (TY D) |
SY |
|
|
1,780.000 |
3.75000 |
1 |