Washington State DOTಪರಿಶೀಲಿಸಿದ ಖಾತೆ

@wsdot

Official Washington State Department of Transportation Twitter account.

State of Washington
ಮಾರ್ಚ್ 2008 ಸಮಯದಲ್ಲಿ ಸೇರಲಾಗಿದೆ

@wsdot ತಡೆಹಿಡಿಯಲಾಗಿದೆ

ನೀವು ಖಚಿತವಾಗಿಯೂ ಈ ಟ್ವೀಟ್‌ಗಳನ್ನು ನೋಡಲು ಬಯಸುವಿರಾ? ಟ್ವೀಟ್‌ಗಳನ್ನು ನೋಡುವುದು @wsdot ಅವರನ್ನು ತಡೆತೆರವುಗೊಳಿಸುವುದಿಲ್ಲ.

  1. We've updated our fire closure map with the latest info to help you plan a trip around the closures

  2. ಮರುಟ್ವೀಟಿಸಿದ್ದಾರೆ

    Everett Alert: SR 526 closed near Paine Field 7-9 pm tonight while Boeing transports very large equipment. Detour to Airport Rd.

  3. Good news is about to travel fast. I-405 express toll lanes arrive Sept 27.

  4. ಮರುಟ್ವೀಟಿಸಿದ್ದಾರೆ

    The rock blasting closures planned for the week have been cancelled due to heightened fire danger in the area.

  5. ಮರುಟ್ವೀಟಿಸಿದ್ದಾರೆ

    Seattle Tunnel Partners successfully lowers tunneling machine's front end into the access pit:

  6. We have just updated our wildfire road closure zoomable map. Plan your trip:

  7. ಮರುಟ್ವೀಟಿಸಿದ್ದಾರೆ

    Faunt/Va/SW: Power outage at Fauntleroy

  8. Heads up!

  9. ಮರುಟ್ವೀಟಿಸಿದ್ದಾರೆ

    Snoqualmie: Rock blasting is scheduled Wednesday August 26 through Thursday August 27 beginning at 7 p.m. & lasting a

  10. SR 20 closure moved west to MP 111.8 near Bacon Creek Road. Check our travel alerts website for updates:

  11. . Sorry you ran into that. It takes a lot of energy to travel, especially with a baby. Sadly, its a result of vandalism.

  12. ಮರುಟ್ವೀಟಿಸಿದ್ದಾರೆ

    This sign also wants you to know about a major weekend closure coming up.

  13. . Lets loop in for that answer.

  14. ಮರುಟ್ವೀಟಿಸಿದ್ದಾರೆ

    The machine’s front end has been lowered partway into the pit. A fresh crew will lower it the rest of the way on Tuesday.

  15. ಮರುಟ್ವೀಟಿಸಿದ್ದಾರೆ

    The view from the top of the crane that’s performing today’s lift.

  16. ಮರುಟ್ವೀಟಿಸಿದ್ದಾರೆ

    Crews continuing to rotate/lower the piece into the access pit.

  17. ಮರುಟ್ವೀಟಿಸಿದ್ದಾರೆ

    Unexpected challenges delay reopening of SR 203 in Duvall, now scheduled for 5 a.m. Thursday, Aug. 27.

  18. Our fire closure map has been updated with the latest info to help plan your trip around the closures.

  19. ಮರುಟ್ವೀಟಿಸಿದ್ದಾರೆ

    Crews have begun rotating the piece vertically.

  20. ಮರುಟ್ವೀಟಿಸಿದ್ದಾರೆ

    Front end is off the ground. The crane is now moving toward the access pit. Time-lapse view:

ಲೋಡಿಂಗ್ ಸಮಯ ಸ್ವಲ್ಪ ತೆಗೆದುಕೊಳ್ಳುತ್ತಿರುವಂತೆನಿಸುತ್ತದೆ.

ಟ್ವಿಟರ್ ಸಾಮರ್ಥ್ಯ ಅಧಿಕವಾಗಿರಬಹುದು ಅಥವಾ ಈ ಕ್ಷಣದ ತೊಂದರೆಯನ್ನು ಅನುಭವಿಸುತ್ತಿರಬಹುದು. ಮತ್ತೆ ಪ್ರಯತ್ನಿಸಿ ಅಥವಾ ಇನ್ನಷ್ಟು ಮಾಹಿತಿಗೆ ಟ್ವಿಟರ್ ಸ್ಥಿತಿ ಗೆ ಭೇಟಿ ನೀಡಿ.

    ಇದನ್ನೂ ಸಹ ನೀವು ಇಷ್ಟಪಡಬಹುದು

    ·