Before a project is built, a study must be done to determine if it will fill a transportation need, will not negatively impact the surrounding area and fits the department's overall plan. During the study phase, potential projects are analyzed to determine if they are cost-effective while also efficiently improving mobility. Some of these projects have moved beyond the study phase and are under construction.

Location Project/Study Description
Brazos County SH 6 Ramp Improvement Proposal to reverse the ramps between Boonville Road (FM 158) and SH 21
Brazos, Grimes and Washington counties SH 105 Bridge Project Replace the existing SH 105 bridges across the Navasota and Brazos Rivers and Coles Creek
College Station FM 2347 Project Improvements to the intersection of George Bush Drive, Wellborn Road and the Union Pacific Railroad
Grimes County SH 249 Project Identify potential route or routes between Todd Mission and Navasota
Madisonville SH 21 Relief Route Feasibility Study A relief route is being studied to increase mobility