The FM 457 swing bridge in Sargent is in need of replacement because of its age and the high maintenance costs associated with its upkeep. TxDOT is proposing to replace the swing bridge with a concrete bridge that would span the Gulf Intracoastal Waterway to provide access for residents on the south side of the waterway.
Why the Need for a New Bridge
A new swing bridge is not being considered because of several factors, including:
The project is just beginning preliminary environmental and design processes, which usually take a few years to complete. TxDOT held a citizen workshop in the fall of 2013 to get feedback from the community on preliminary design options and will continue to involve citizens during the environmental study process.
Video: Take a Driving Tour of the Proposed Replacement Bridge
Contact
TxDOT Yoakum District
(361) 293-4347
Email