Before a project is built, a study must be done to determine if it will fill a transportation need, will not negatively impact the surrounding area and fits the department's overall plan. During the study phase, potential projects are analyzed to determine if they are cost-effective while also efficiently improving mobility. Some of these projects have moved beyond the study phase and are under construction.

Location Project Description
Alvin FM 528 Expansion of FM 528 from SH 35B (Gordon Street) to SH 6
Dickinson FM 646 Widening FM 646 from I-45 to Bayshore Boulevard
Fort Bend County Crabb River Road (FM 2759/FM 762) Widening of 3.8 miles of Crabb River Road
Fort Bend County FM 359 Improvements to FM 350 at US 90A and the Union Pacific Railraod
Fort Bend County FM 1093 from SH 99 to FM 1463 Expansion of FM 1093 from SH 99 to FM 1463 to a four-lane divided tollway with non-tolled, two-lane continuous frontage roads
Fort Bend County FM 2234 Widening FM 2234 (McHard Road) from FM 3345 to FM 521
Fort Bend County SH 36 and Spur 10 Constructing additional lanes on SH 36 from FM 2218 to FM 1495 and extending Spur 10 south of US 59
Fort Bend County Trammel Fresno Road Widening Trammel Fresno Road from Fort Bend Parkway to FM 521
Fort Bend County US 90A Expanding US 90A from SH 6 to Loop 762
Galveston County I-45 (FM 518/FM 1764) Widening IH-45 South from FM 518 to FM 1764
Galveston County LP 197 and I-45 Construct direct connection between Loop 197 and I-45
Harris County FM 1960 Constructing a grade separation at the BNSF rail crossing
Harris County FM 521 Improvements to FM 521 from BW 8 to FM 2234
Harris County SH 6 / FM 529 Intersection Construction of additional turn lanes in all directions
Harris County SH 288 The expansion of SH 288 from US 59 to CR 60
Harris County SH 288 Toll Lanes Project in Harris County From US 59 to the Harris County line at Clear Creek
Harris and Fort Bend Counties
FM 521
Widening and improving FM 521 from Beltway 8 to FM 2234
Harris and Galveston Counties SH 146 Improvements from Red Bluff to south of the Galveston/Harris county line
Houston Almeda Road
The proposed widening of Almeda Road between Old Spanish Trail to South MacGregor Way
Houston Business 90U The proposed widening of Business Highway 90U from I-610 to east of Mesa Road
Houston Business 288B Proposed installation of raised medians
Houston CR 48
Roadway widening CR 48 from two to four lanes from SH 6 to FM 518
Houston CR 220 Improvements to CR 220 from SH 288 to FM 523
Houston FM 529 Improvements to FM 529 from Greenhouse Road to the proposed Grand Parkway
Houston FM 529 Improvements to FM 529 from US 290 to Greenhouse Road
Houston FM 865 Enhancements to FM 865 from Almeda-Genoa Road to FM 518
Houston FM 1960 Proposed improvements to FM 1960 from BF 1960A to FM 2100
Houston FM 2100 Added lanes to FM 210 from Diamondhead Drive to Hufffman-New Caney Road
Houston FM 2978 Additional lanes on FM 2978 from Dobbin-Hufsmith Road to FM 1488
Houston FM 2978 at FM 2920 Additional lanes on FM 2978 from FM 2920 to Dobbin-Hufsmith Road
Houston FM 3083
Roadway widening to a four-lane divided facility with 10-foot shoulders and an above-grade over pass at Union Pacific Railroad
Houston FM 3083 Construction of median, shoulders and grade separation over UPRR
Houston I-10 Exploring the possibility of a holding pond at White Oak Bayou
Houston I-10 Managed Lanes Exploring extending the use of managed lanes on I-10 from SH 6 to FM 359
Houston I-45 and I-610 Proposed improvements to the I-45 and I-610 interchange
Houston Greens Road Widening Greens Road from Aldine-Westfield Road to John F. Kennedy Boulevard 
Houston Louetta Boulevard Improvements to Louetta Boulevard from Whitewood Drive to the southbound frontage road of I-45
Houston North Houston Corridor Spans 16-miles and includes portions of I-10, US 59 and SH 288, Hardy Toll Road and I-610
Houston Pearland Parkway Widen existing roadway to four 12-foot divided travel lanes
Houston SH 99/Grand Parkway A proposed 180-mile circumferential highway traversing seven counties in the Greater Houston Area
Houston SH 288 Construct a direct connector from SH 288 to Medical Center
Houston SH 6/FM 1960 Improvements to SH 6/FM 1960 from I-10 to SH 249
Houston US 59 South/IH 610 West Interchange Reconstruction The proposed project includes three phases of reconstruction on the interchange
Houston Woodlands Parkway Widen existing roadway to six 12-foot divided travel lanes
Houston Yale Street Bridge Replacement of the Yale Street Bridge at White Oak Bayou
Humble BF 1960A The widening of BF 1960A from Lee Road to FM 1960
Humble BF 1960A Roadway resurfacing and access management on BF 1960A between FM 1960 west of Lee Road and FM 1960 east of Humble
Montgomery County Loop 494 Widening Loop 494 from Kingwood Drive to Sorter's McClellan Road
Montgomery County SH 249 Construction of a toll road from FM 1774/FM 149 in Pinehurst to FM 1774 at Todd Mission
Pearland Bailey Road
Widening Bailey Road from FM 1128 to Veterans Drive in Pearland, Harris County
Pearland CR 403 Improvements to CR 403 from CR 94 to FM 865
Rosenberg SH 36 Expanding SH 36 from US 59 to FM 2218
Rosenberg SH 36/US 90A
Reconstruction and reconfiguration of SH 36/US 90A
Waller County FM 1488 The proposed widening of FM 1488 from Joseph Road to FM 2978
Waller County FM 1774 Improvements to FM 1774 from Mill Creek Drive to FM 149
Waller County I-10 Studying the future needs of I-10 from FM 359 to FM 3538
The Woodlands IH 45 Extension of IH 45 High Occupancy Vehicle (HOV) lane(s) from FM 1960 to Loop 336