Before and after paving on OR22

    Newer Older

    Though the striping is not complete, this is a shot facing east from Perrydale road on OR 22, before and after a stimulus funded pavement preservation project.

    Work will begin in late August on the second half of OR22 paving, from OR51 (Independence Hwy) to the Salem bridges. That work also includes resurfacing of a bridge in front of Capitol Manor.

    1. Recoverydotgov 53 months ago | reply

      Hi, I'm an admin for a group called www.flickr.com/groups/1380829@N25/, and we'd love to have this added to the group!

    keyboard shortcuts: previous photo next photo L view in light box F favorite < scroll film strip left > scroll film strip right ? show all shortcuts