Home
Mail
News
Sports
Finance
Weather
Games
Groups
Answers
Screen
Flickr
Mobile
More
Celebrity
Movies
Music
TV
Health
Style
Beauty
Food
Tech
Shopping
Travel
Autos
Homes
Flickr logo. If you click it, you'll go home
Sign Up
Explore
Recent Photos
The Commons
20under20
Galleries
World Map
App Garden
Camera Finder
The Weekly Flickr
FlickrBlog
Upload
Sign In
Washington State Dept of Transportation
WSDOT
21,536
Photos
April 2007
Member Since
Photostream
Albums
Favorites
Map
Galleries
Collections
Archives
Tags
Photos of
Profile
Construction crews pour concrete on I-5 in Olympia
WSDOT
1
0
Saturday Sept. 13, I-5 Closures Olympia
WSDOT
7
0
First WSDOT Walk the Walk event
WSDOT
2
0
Rendering of a new Montlake lid
WSDOT
5
2
Portage Bay Bridge with cable stay design
WSDOT
3
0
Portage Bay Bridge with box girder design
WSDOT
1
0
Shared-use land bridge across SR 520
WSDOT
1
0
Bill Dawson Trail rendering
WSDOT
3
0
New HOV lanes open on Eastside
WSDOT
7
0
Paving work continues
WSDOT
3
0
Final striping on its way
WSDOT
3
0
The 92nd Ave NE roundabout
WSDOT
2
0
Construction continues westward
WSDOT
5
0
Evergreen Point Road transit facility
WSDOT
5
0
Evergreen Point Road lidded overpass
WSDOT
1
0
I-5 old bridge joint at Deschutes on-ramp in Olympia
WSDOT
3
0
Crews working on the I-5 bridge joint replacement in Olympia
WSDOT
5
0
This used to be Broad Street
WSDOT
6
0
Building the lanes that will connect to the SR 99 tunnel
WSDOT
2
0
Progress on the M/V Samish
WSDOT
40
3
Construction on the M/V Samish is underway
WSDOT
2
0
Sept. 9, 2014 - First section of low-rise roadway installed!
WSDOT
6
0
The last of culverts to be installed on SR 530
WSDOT
2
0
New SR 530 concrete box culvert
WSDOT
7
0
Building West Tie-In
WSDOT
3
0
Reconstruction of SR 530 at the knoll
WSDOT
2
0
8/29/2014 Progress on SR 530
WSDOT
6
0
SR 99/Aurora Avenue crossing at Broad Street
WSDOT
7
0
Installing new sewer pipe under SR 99
WSDOT
8
0
I-5 US 101 Bridge Expansion Joint Repair in Olympia
WSDOT
4
0
I-5 US 101 Bridge Expansion Joint Repair damage2
WSDOT
1
0
I-5 US 101 Bridge Expansion Joint Repair damage1
WSDOT
2
0
I-5 SR16 EBNV Sprague onramps
WSDOT
9
0
Redirecting electric and sewer lines away from SR 99
WSDOT
6
0
Hauling another load of fill for work near Broad Street and SR 99
WSDOT
8
0
Rebuilding sections of SR 99 in Seattle is a team effort
WSDOT
8
0
Building a smoother SR 99
WSDOT
6
0
Moving day for utilities under SR 99
WSDOT
4
0
Broad Street Bridge disappearing act
WSDOT
3
0
Demolishing the SR 99 crossing over Broad Street
WSDOT
1
0
Another view of Aurora Avenue North
WSDOT
4
0
Breaking the SR 99 bridge over Broad Street
WSDOT
1
0
SR 20 Washout
WSDOT
3
0
SR 20 Washout
WSDOT
3
0
SR 20 Washout
WSDOT
2
0
SR 20 Washout
WSDOT
2
0
SR 153 Washout - vicinity of MP 27, about 3 mi. south of the SR 20/SR 153 Junction east of Twisp.
WSDOT
3
0
SR 153 Washout - vicinity of MP 27, about 3 mi. south of the SR 20/SR 153 Junction east of Twisp
WSDOT
0
SR 153 Washout - vicinity of MP 27, about 3 mi. south of the SR 20/SR 153 Junction east of Twisp.
WSDOT
0
SR 153 Washout - vicinity of MP 27, about 3 mi. south of the SR 20/SR 153 Junction east of Twisp.
WSDOT
0
New east end of SR 530
WSDOT
4
0
WSDOT Boulder Creek rock pit
WSDOT
2
0
New SR 530 fish culvert
WSDOT
2
0
SR 530 hill excavation
WSDOT
3
0
New SR 530 elevated roadway slope
WSDOT
3
0
1_Fishing
WSDOT
4
0
2_Completed_dam
WSDOT
2
0
3_Start_Installing
WSDOT
4
0
4_Backfilling
WSDOT
4
0
5_Constructing
WSDOT
3
0
6_Closeup_partially_complete
WSDOT
1
0
Aug. 9, 2014 – Superstructure coming together
WSDOT
0
July 25, 2014 – North span balanced cantilever construction underway
WSDOT
0
July 25, 2014 – East highrise begins to take shape
WSDOT
0
July 11, 2014 – All hands on deck
WSDOT
0
June 30, 2014 – SR 520 floating bridge construction in full swing
WSDOT
0
June 26, 2014 – New SR 520 floating bridge takes shape
WSDOT
0
June 26, 2014 – Committed to getting the job done
WSDOT
0
June 30, 2014 – Roadway deck section construction continues
WSDOT
0
July 11, 2014 – Guiding rebar into place
WSDOT
0
June 10, 2014 – In-basin construction begins on the sixth (and final!) cycle of pontoons
WSDOT
0
June 30, 2014 – Pontoons begin to take shape
WSDOT
0
Aug. 16, 2014 – Pontoon E travels to Lake Washington
WSDOT
3
0
Aug. 16, 2014 – Waiting for tugboats
WSDOT
3
0
SR 99 tunneling machine bearing in boxes
WSDOT
3
0
SR 99 tunnel lid at Harrison Street
WSDOT
6
0
New floor for SR 99 tunnel
WSDOT
15
0
Demolishing SR 99 over Broad Street
WSDOT
5
0
Highway 12 Slide
WSDOT
9
0
Highway 12 Slide
WSDOT
5
0
July 11, 2014 - Skeleton of a column
WSDOT
8
0
July 13, 2014 - Head west, new bridge
WSDOT
8
0
July 17, 2014 - Girders aplenty
WSDOT
4
0
Aug. 11, 2014 – Picture perfect arrival in Seattle
WSDOT
6
0
Aug. 11, 2014 – Pontoon B enters the Hiram M. Chittenden Locks in Ballard
WSDOT
4
0
Aug. 11, 2014 – Pontoon C arrives at the Hiram M. Chittenden Locks in Ballard
WSDOT
2
0
Aug. 11, 2014 – Twilight arrival onto Lake Washington
WSDOT
1
0
Concrete panel repair on SR 99
WSDOT
1
0
Concrete panel repair on SR 99
WSDOT
0
Adding the finishing touches
WSDOT
3
0
Aug. 9, 2014 - Installing new signs
WSDOT
4
0
Aug. 9, 2014 - Moving earth
WSDOT
3
0
Aug. 9, 2014 - Preparing for pouring
WSDOT
2
0
Aug. 9, 2014 - Smoothing out the rough edges
WSDOT
4
0
Aug. 9, 2014 - A smooth finish
WSDOT
3
0
Aug. 9, 2014 - West Connection Bridge makes progress towards completion
WSDOT
2
0
A view of the SR 520 project on a sunny day with Seattle in the background
WSDOT
11
0
The Evergreen Point Road lidded overpass
WSDOT
1
0
A look at the SR 520 corridor east of Medina
WSDOT
3
0
Bellevue Way Northeast
WSDOT
1
0
Square
Small
Medium
Large
Justified
◣
← prev
1
2
3
4
5
6
7
...
215
216
next →
(21,536 items)
Share this via...
Email
Facebook
Twitter
Tumblr
Pinterest
Grab the link
Here's a link to this photostream. Just copy and paste!
show short URL