Untitled

    Newer Older

    The ARRA Design-Build Bridge #9 (Project UPC 92756) will replace the Old Rte 698 Henrys Mill Road Bridge over Sandy Creek with a new prefabricated steel truss bridge with concrete deck (Project UPC 92756) West end of bridge looking east. (Photo by D. Allen Covey, VDOT)

    keyboard shortcuts: previous photo next photo L view in light box F favorite < scroll film strip left > scroll film strip right ? show all shortcuts