The scope of this study is business 288B from Henderson Road to Wilkins Street.
Current Conditions
Currently, the roadway contains four 12-foot lanes, 10-foot outside shoulders, and a continuous 16-foot wide center turn lane. The corridor also has an open drainage ditch system.
Proposed Improvements
The proposed project includes:
No additional right-of-way is needed.
Partners
This study is a partnership between TxDOT and the Federal Highway Administration.
Public Involvement
Contact Us
Texas Department of Transportation
Ms. Terri Leeson
P.O. Box 1386
Houston, TX 77251-1386
Phone: (713) 802-5247
Email