Project Studies: Bryan District

Before a project is built, a study must be done to determine if it will fill a transportation need, will not negatively impact the surrounding area and fits the department's overall plan. During the study phase, potential projects are analyzed to determine if they are cost-effective while also efficiently improving mobility. Some of these projects have moved beyond the study phase and are under construction.

Location Project/Study Description
Brazos, Grimes and Washington counties SH 105 Bridge Project
Replace the existing SH 105 bridges across the Navasota and Brazos Rivers and Coles Creek
Brenham US 290 Freeway Conversion Project
Improvements from the BNSF railroad to Woodward Creek
College Station FM 2347 Project
Improvements to the intersection of George Bush Drive, Wellborn Road and the Union Pacific Railroad
Grimes County SH 249 Project
Identify potential route or routes between Todd Mission and Navasota