Page Options
Up Arrow
Project Studies: Austin District

Before a project is built, a study must be done to determine if it will fill a transportation need, will not negatively impact the surrounding area and fits the department's overall plan. During the study phase, potential projects are analyzed to determine if they are cost-effective while also efficiently improving mobility. Some of these projects have moved beyond the study phase and are under construction.

Location Project Description
Austin Austin-San Antonio Commuter Rail A study of the feasibility of a passenger rail system between Austin and San Antonio
Austin MoPac Improvement Project The expansion and enhancement of MoPac in Austin
Austin Oak Hill Parkway Long-term mobility improvements to US 290 and SH 71 through Oak Hill
Austin SH 71 East
Proposed improvements to State Highway (SH) 71 between Riverside Drive and SH 130
Austin SH 71 Express Proposed improvements to SH 71 between Presidential Blvd. and SH 130
Austin US 183 South (Bergstrom Expressway) Proposed improvements to US 183 from Springdale Road to SH 71
Austin US 290 East The proposed reconstruction of US 290 from US 183 to SH 130
Austin US 290 Intersection Improvements Proposed improvements to five intersections along US 290
Kyle Modern Roundabouts Information explaining what modern roundabouts are and how they work
Marble Falls US 281 Bridge Replacement Replacement of a steel bridge and construction of two concrete structures
Round Rock RM 1431 Diverging Diamond Intersection Proposed improvements to RM 1431 at I-35