2/11/2013 |
DOE Final Report to Complete Action 2-6 in the Implementation Plan for Board Recommendation 2011-1, Safety Culture at the Waste Treatment and Immobilization Plant (WTP) |
Glenn S. Podonsky |
Letter |
PDF |
2/1/2013 |
February 1, 2013 |
|
Technical Document Log |
PDF |
1/31/2013 |
DOE Response to Board August 30, 2012, Letter which Issued a Reporting Requirement Regarding Safety Control Strategies for Nuclear Operations at Lawrence Livermore National Laboratory |
Neile L. Miller |
Letter |
PDF |
1/31/2013 |
DOE Transmittal of Implementation Plan (IP) Deliverable 3-1 for Board Recommendation 2012-1, Savannah River Site Building 235-F Safety |
David C. Moody |
Letter |
PDF |
1/22/2013 |
Safety Culture, Emergency Preparedness, and Nuclear Explosive Operations at Pantex |
|
Public Hearing |
Notice of Public Meeting |
1/22/2013 |
Federal Register Volume 78 Number 14 |
|
Recommendation Federal Register Notice |
PDF |
1/16/2013 |
DOE Requires an Extension beyond the January 31, 2013, Due Date to Meet the Annual Reporting Requirement for Closure of Recommendation 97-2 |
James J. McConnell |
Letter |
PDF |
1/16/2013 |
DOE Response to Board November 19, 2012, Letter Concerning the Upgrade to the Nuclear Facility Safety Basis for Area G at Los Alamos National Laboratory |
James J. McConnell |
Letter |
PDF |
1/16/2013 |
January 15, 2013 |
|
Technical Document Log |
PDF |
1/8/2013 |
Federal Register Publication of the “Second Extension of Hearing Record Closure Date” for the Board’s Public Hearing and Meeting on October 2, 2012 |
|
Public Hearing Federal Register Notice |
PDF |