This page lists, in chronological order, the notices, slides and summaries
documenting the public meetings held concerning Reactor Vessel Head Degradation
for 2002. To learn about future meetings, see our public
meeting schedule page.
Date |
Description |
12/23/02 |
Category 1 meeting: Discuss
the license's expansion of their System Health Assurance Plan
Contact: Christine Lipa, 630-829-9619
|
12/10/02 |
Category 3 meeting: Present
to the local public the status of the NRC's Oversight Panel activities
for the Davis-Besse Nuclear Power Station
Contact: Christine Lipa, 630-829-9619
|
12/10/02 |
Category 1 meeting: Discuss
License performance and progress on the Return to Service Plan as
part of the IMC 0350 Process
Contact: Christine Lipa, 630-829-9619
|
11/26/02 |
Category 1 meeting: To
Discuss the Davis-Besse Reactor Vessel Incore Monitoring Instrumentation
Nozzles, Inspection, and Potential for Leakage
Contact: Jon Hopkins, 301-415-3027
|
11/26/02 |
Category 1 meeting: To
Discuss the New Davis-Besse Containment Building Emergency Sump
Design
Contact: Jon Hopkins, 301-415-3027
|
11/20/02 |
Lessons Learned Task Force Public Meeting
Contact: Joseph E. Donoghue, 301-415-2176/1131
|
11/13/02 |
Category 3 meeting: Present
to the local public the status of the NRC's Oversight Panel activities
for the Davis-Besse Nuclear Power Station.
Contact: Christine Lipa, 630-829-9619
|
11/13/02 |
Category 1 meeting: Discuss
License performance and progress on the Return to Service Plan as
part of the IMC 0350 Process
Contact: Christine Lipa, 630-829-9619
|
10/16/02 |
Category 1 meeting: Discuss
preliminary findings and observations from the two NRC special inspections
conducted to review radiolocial work planning, dose to workers during
the outage, and offsite contamination events
Contact: Kenneth Riemer 630-829-9757
|
10/16/02 |
Category 1 meeting: Discuss
licensee performance and progress on the Return to Service Plan
as of the IMC 0350 Process.
Contact: Christine Lipa, 630-829-9619
|
10/16/02 |
Category 3 meeting: Present
to the local public the status of the NRC's Oversight Panel activities
for the Davis-Besse Nuclear Power Station
Contact: Christine Lipa, 630-829-9619
|
9/18/02 |
Category 1 meeting: Discuss
the licensee's planned corrective actions to address the Davis-Besse
organizational and human performance problems presented to the NRC
during the August 15, 2002, public meeting.
Contact: Christine Lipa, 630-829-9619
|
9/17/02 |
Category 3 meeting: Present
to the local public the status of the NRC's oversight panel activities
for the Davis-Besse Nuclear Power Station
Contact: Christine Lipa, 630-829-9619
|
9/17/02 |
Category 1 meeting: Discuss
licensee performance and progress on the Return to Service Plan
as part of the IMC 0350 Process
Contact: Christine Lipa, 630-829-9619
|
08/23/02 |
Category 2 meeting: This
meeting is to discuss the NEI and PWR licensees Bulletin 2002-02,
"Reactor Pressure Vessel Head and Vessel Head Penetration Nozzles
Inspections Programs."
|
8/20/02 |
Category 3 meeting: Present
to the local public the status of the NRC's oversight panel activities
for the Davis-Besse Nuclear Power Station.
Contact: Christine Lipa, 630-829-9619
|
8/20/02 |
Category 1 meeting: Discuss
licensee performance and plans for restart as part of the IMC 0350
process.
Contact: Christine Lipa, 630-829-9619
|
8/15/02 |
Category 1 meeting: Discuss
the licensee's root cause analysis of the non-technical issues that
led to the reactor pressure vessel head degradation.
Contact: Christine Lipa, 630-829-9619
|
07/24/02 |
Category 2 meeting: Opportunity
for industry to present to the NRC a revised generic inspection
program for detection and control of leakage and corrosion in the
reactor vessel head and penetration areas of pressurized water reactors.
Contact: Joseph Birmingham, 301-415-2829
|
7/16/02 |
Category 1 meeting: Discuss
licensee performance and plans for restart as part of the IMC 0350
Process
Contact: Christine Lipa, 630-829-9619
|
7/16/02 |
Category 3 Meeting: Present
to the local public the status of NRC's oversight panel activities
for the Davis-Besse Nuclear Power Station
Contact: Christine Lipa, 630-829-9619
|
6/19/02 |
Public Meeting: To discuss
the NRC's Davis-Besse Reactor Vessel Head Degradation Lessons-Learned
Task Force Charter, including objectives, scope, team composition,
schedule, and review activities. This meeting is considered category
3 in accordance with NRC guidance on public meetings.
Contact: Edwin Hackett, 301-415-1200
|
6/12/02 |
Public Meeting: To discuss
the NRC's Davis-Besse Reactor Vessel Head Degradation Lessons-Learned
Task Force Charter, including objectives, scope, team composition,
schedule, review activities, and activities to be conducted onsite
at Davis-Besse.
Contact: Arthur Howell, 301-415-1784
|
6/12/02 |
Public Meeting: To discuss
plant performance and plans for restart of the Davis-Bese Nuclear
Power Station, as part of the implementation of NRC's Inspection
Manual Chapter (IMC) 0350.
Contact: Christine Lipa, 630-829-9619
|
6/12/02 |
Public Meeting: Status of
the NRC's activities related to the plant performance and plans
for restart of the Davis-Besse Nuclear Power Station.
Contact: Christine Lipa, 630-829-9619
|
6/12/02 |
American Nuclear Society
2002 Annual Meeting - Reactor Pressure Vessel Head Degradation
|
6/04/02 |
Public Meeting: To discuss
replacing the Davis-Besse reactor pressure vessel head
Contact: Stephen Sands, 301-415-3154; Douglas Pickett, 301-415-1364
|
5/22/02 |
NRC RES-MRP Alloy 600 Meeting
Slides
|
5/20/02 |
Public Meeting: To discuss
the option of replacing the Davis-Besse reactor pressure vessel
head.
Meeting has been postponed, date to be determined.
Contact: Stephen Sands, 301-415-3154; Douglas Pickett, 301-415-1364
|
5/09/02 |
Public Meeting: Implementation
of NRC Oversight Panel (IMC 350)
Contact: Christine Lipa, 630-829-9619
|
5/07/02 |
Public Meeting: Root Cause
Analysis of the Degradation of the Davis-Besse Reactor Pressure
Vessel Head
Contact: Stephen Sands, 301-415-3154; Douglas Pickett, 301-415-1364
|
4/10/02 |
Public Meeting: FirstEnergy
Nuclear Operating Company updating Davis Besse Reactor Vessel Head
Degradation condition and follow up actions
Contact: Stephen Sands, 301-415-3154; Douglas Pickett, 301-415-1364
|
4/05/02 |
NRC Public Meeting: To present,
to the licensee, FirstEnergy Nuclear Operating Company, the results
of NRC End-of-Cycle assessment
Contact: Christine Lipa 630-829-9619
|
4/05/02 |
NRC Public Meeting: to present,
to the licensee, the NRC Augmented Inspection Team's preliminary
findings regarding the loss of pressure boundary material from the
Davis Besse reactor vessel head.
Contact: Kenneth O'Brien 630-829-9821
|
3/20/02 |
Public Meeting: NRC updated
to Stakeholders on Reactor Vessel Head Degradation program.
Contact: Stephen Sands 301-415-3154; Douglas Pickett, 301-415-1364
|
3/19/02 |
Public Meeting: NEI/EPRI-MRP
presentation to NRC staff updating Davis Besse Reactor Vessel Head
Degradation condition and follow up actions
Contact: Steven Bloom, 301-415-1313 |