Review PHS&T requirements for adequacy to meet objective peacetime readiness and wartime employment. Validation is typically performed as a part of the Logistics Demonstration <NOTE: Hyperlink LogDemo article.>
DoDI 5000.2 requires analysis and review of system requirements to confirm the adequacy of proposed support resources. In the production phase, ensuring the PHS&T requirements adequately meet the objective readiness needs reduces life-cycle cost by lowering the probability of damaging the system during shipment. The Logistics Demonstration shows the System Support Package adequately meets the defined requirements.
“Validation testing is conducted using personnel from the target operator/user community. Testing is performed in the intended operational environment. Both of these are intended to produce performance results similar to what one would expect from a fielded system. In the early stages of the system life cycle, validation may involve prototypes, simulations, or mock-ups of the system and a model or simulation of the system's intended operational environment.” (LOG 101)
Army Regulation 700-15DoD 5000.2MIL-STD-2073-1E
powerLOG provides LSA-025 (Packaging Requirements Summary), LSA-026 (Packaging Developmental Data), and LSA-085 (Transportability Summary) to support this activity. PowerLOG is a logistics data management system developed to support the development, integration, and review of logistic product information throughout the acquisition life cycle. PowerLOG implements the Logistics Support Analysis Record (LSAR) requirements defined in MIL-STD-1388-2B as well as Logistics Product Data (LPD) standards defined by GEIA-STD-0007. PowerLOG also supports legacy data standards such as MIL-STD-1552 (PMR). PowerLOG is available free to all Government agencies and their contractors and can be obtained by visiting: https://www.logsa.army.mil/lec/powerlog/.
Sign In
Insert your CAC now, and click this button.
User Name:
Password:
Forgot your password?
Benefits of ACC Membership