1.0 Introduction
This subject area provides the procedures for the evaluation of the performance of U.S. Department of Energy (DOE) Office of Science (SC) Headquarters (HQ) Offices and SC Field Offices.
Annually, each SC HQ and Field Office Manager prepares an Annual Performance Plan (APP), which establishes the performance expectations, organizational goals, objectives, measures, and commitments for that office for the upcoming year. Annually, the SC Deputy Director for Field Operations (SC‑3) may choose to issue direction regarding the need to link and align the goals of SC HQ and Field Offices with recent SC, DOE, and/or Federal Government-Wide initiatives. Other SC HQ management may participate in the development of such direction. Application of SC‑3's direction is tailored to the specific SC HQ Office or SC Field Office and linked to Senior Executive Service (SES) and employee performance plans. The APP also addresses SC HQ and Field Offices’ anticipated requests for changes to the approved organizational staffing ceiling and other staffing-related issues.
Annually, each SC HQ and Field Office Manager prepares an Annual Assessment Report (AAR), which documents that organization’s management assessment of its performance against the goals, objectives, and commitments delineated in that year’s APP. In addition to reporting performance in relation to the APP, the AAR identifies noteworthy accomplishments, challenges, and/or major concerns that arose during the year. The annual assessment results should support the end-of-year performance evaluations of the SC HQ and Field Offices' employees. Over time, feedback from SC's management review of APPs and evaluation of AARs will facilitate consistency and drive continuous improvement of SC performance. The SC‑3 evaluates SC oversight performance based on a review and analysis of the APPs, AARs, SC HQ-directed reviews, and applicable external reviews. Key elements of the evaluation are based on the annual guidance and include site-specific and an SC‑crosscutting analysis to determine if the plans meet the objectives of the APP with a focus on the performance goals and objectives.
The SC Integrated Support Center (ISC) is the pilot for implementation of ISO 9001:2008 standards for quality assurance. In accordance with the ISO 9001:2008 standard, to effectively plan and evaluate performance, the SC ISC must ensure that customer requirements are determined and met with the goal of continually enhancing customer satisfaction. Requirements specified by the customer, as well as requirements not stated by the customer but necessary for the specified use and/or to satisfy statutory and regulatory requirements, must be determined and incorporated into annual performance plans. Information relating to customer perception as to whether the SC ISC has met customer requirements must be identified, collected, evaluated and reported in annual assessment reports. Since ISO 9001:2008 implementation is limited to the SC ISC pilot project, these requirements do not apply to the remainder of SC.
2.0 Contents
Procedures |
Procedure Content |
1. Preparing and Reviewing the SC Annual Performance Plan (APP) |
|
2. Preparing and Reviewing the SC Annual Assessment Report (AAR) |
|
3. Focusing on Customers to Enhance Customer Satisfaction (Applicable to SC ISC Only) |
|
3.0 Exhibits/Forms
4.0 Related Information
5.0 Requirements
Document | Title | Requirement Decision Record |
DOE O 226.1B | Implementation Of Department Of Energy Oversight Policy | Completed |
DOE P 226.1B | Department Of Energy Oversight Policy | Completed |
DOE O 414.1D | Quality Assurance | Completed |
6.0 Definitions
This is not the online OFFICIAL SCMS COPY of this file. Before using this printed copy, verify that it is the most current version by checking the Last Major Revision and Last Minor Revision dates (at the bottom of each document) on the SCMS Web site.
This is the online OFFICIAL SCMS COPY of this file. Before using a printed copy, verify that it is the most current version by checking the Last Major Revision and Last Minor Revision dates (at the bottom of each document) on the SCMS Web site.
Send a question or comment to the
SCMS Help Desk.
Disclaimer
Last Major SCMS Revision: 04/30/2010