Production and Deployment Phase

Topic
Long Description

Definition General Info Policies Guides Communities Training Related


DEFINITION

The purpose of the Production and Deployment Phase is to achieve an operational capability that satisfies mission needs.


GENERAL INFORMATION/NARRATIVE

The tables in Enclosure 4 identify the statutory and regulatory requirements that shall be met at Milestone C.

b. Entrance Criteria. Entrance into this phase depends on the following criteria: acceptable performance in developmental test and evaluation and operational assessment (OSD OT&E oversight programs); mature software capability; no significant manufacturing risks; manufacturing processes under control (if Milestone C is full-rate production); an approved ICD (if Milestone C is program initiation); an approved Capability Production Document (CPD); a refined integrated architecture; acceptable interoperability; acceptable operational supportability; and demonstration that the system is affordable throughout the life cycle, fully funded, and properly phased for rapid acquisition. The CPD reflects the operational requirements, informed by EMD results, and details the performance expected of the production system. If Milestone Capproves LRIP, a subsequent review and decision shall authorize full-rate production.

c. Phase Description. For MDAPs and other programs on the OSD T&E Oversight List, Production and Deployment has two major efforts, LRIP and Full-Rate Production and Deployment, and includes a Full-Rate Production Decision Review. For MAIS programs or software intensive systems with no production components, the Full-Rate Production Decision Review is referred to as the Full Deployment Decision Review.

(1) LRIP (a) This effort is intended to result in completion of manufacturing development inorder to ensure adequate and efficient manufacturing capability and to produce the minimum quantity necessary to provide production or production-representative articles for IOT&E, establish an initial production base for the system; and permit an orderly increase in the production rate for the system, sufficient to lead to full-rate production upon successful completion of operational (and live-fire, where applicable) testing. Evaluations shall be conducted in the mission context expected at time of fielding, as described in the user’s capability document. The MDA shall consider any new validated threat environments that will alter operational effectiveness. If the program has not demonstrated readiness to proceed to full rate production, the MDA shall assess the cost and benefits of a break in production versus continuing buys before approving an increase in the LRIP quantity.(b) LRIP is not applicable to AISs or software-intensive systems with nodevelopmental hardware; however, a limited deployment phase may be applicable. (c) LRIP for ships and satellites is production of items at the minimum quantity andrate that is feasible and that preserves the mobilization production base for that system.(d) Except as specifically approved by the MDA, deficiencies identified in testingshall be resolved prior to proceeding beyond LRIP, and any fixes shall be verified in FOT&E.

(2) Full-Rate Production Criteria. An MDAP may not proceed beyond LRIP withoutMDA approval. The knowledge required to support this approval shall include demonstrated control of the manufacturing process and acceptable reliability, the collection of statistical process control data, and the demonstrated control and capability of other critical processes.(a) For programs on the OSD T&E Oversight List, the decision to continue beyondlow-rate to full-rate production, or beyond limited deployment of AISs or software-intensive systems with no developmental hardware, shall require completion of IOT&E and receipt of the “Beyond LRIP Report” (or equivalent report for MDAPs that are also AISs) by, and submission (where applicable) of the LFT&E Report to, the congressional defense committees, the Secretary of Defense, and the USD(AT&L).(b) If a decision is made to proceed to operational use or to make procurement fundsavailable for the program prior to a final decision to proceed beyond low-rate initial production (or limited deployment for MDAPs that are AISs), the DOT&E shall submit to the Secretary of Defense, the USD(AT&L), and the congressional defense committees the report required by paragraph (b)(2) of section 2399 of Reference (k) with respect to the program as soon as practicable after the decision. The DOT&E may decide to submit an interim or partial report if the operational testing completed to date is inadequate to determine operational effectiveness andsuitability and survivability. If an interim or partial report is submitted, the DOT&E will prepare and submit the required final report as soon as possible after completing adequate operational testing to determine operational effectiveness and suitability and survivability.

(3) Full-Rate Production and Deployment. Continuation into full-rate production resultsfrom a successful Full-Rate Production (or Full Deployment) Decision Review by the MDA. The decision to proceed into Full-Rate Production will be documented in an ADM. This effort delivers the fully funded quantity of systems and supporting materiel and services for the program or increment to the users. During this effort, units will typically attain Initial Operational Capability (IOC). As technology, software, and threats change, FOT&E shall be considered to assess current mission performance and inform operational users during the development of new capability requirements. The tables at Enclosure 4 identify the statutory and regulatory requirements associated with this decision.

(4) Military Equipment Valuation. For Milestone C, the PM shall prepare a programdescription as part of the Acquisition Strategy. Throughout Production and Deployment, the PM or the life-cycle manager shall ensure that all deliverable equipment requiring capitalization is serially identified and valued at full cost; the full cost of each item of equipment is entered in the Item Unique Identification (IUID) registry; all solicitations, proposals, contracts, and/or orders for deliverable equipment are structured for proper segregation of each type of equipment on its respective financial treatment; procedures are established to track all equipment items throughout their life cycle; and the status of items added, retired from operational use, or transferred from one DoD Component to another DoD Component are updated quarterly throughout their life. Definitions and references for these terms are included in Reference (f).


POLICIES, DIRECTIVES, REGULATIONS, LAWS


BEST PRACTICES, LESSONS LEARNED, STORIES, GUIDES, HANDBOOKS, TEMPLATES, EXAMPLES, TOOLS


COMMUNITIES OF PRACTICE


TRAINING RESOURCES


RELATED ARTICLES


Definition General Info Policies Guides Communities Training Related

List of All Contributions at This Location

No items found.

Popular Tags

Page Information

At this page:
40877 Page Views 0 Pages Emailed
0 Meta-card Views 0 Documents and Videos
0 Questions 0 Attachments Downloaded
0 Answers 0 Videos downloaded
0 Relationships and Highlights
ID247089
Date CreatedTuesday, November 18, 2008 11:24 AM
Date ModifiedFriday, April 24, 2009 9:54 AM
Version Comment:

Sign In

Login with your CAC

Insert your CAC now, and click this button.


Login with your Password

User Name:

Password:

Forgot your password?

  

Benefits of ACC Membership


Browse

https://acc.dau.mil/UI/img/bo/minus.gifIntegrated Logistic Support and Logistic...
https://acc.dau.mil/UI/img/bo/plus.gif Materiel Development Decision ...
https://acc.dau.mil/UI/img/bo/plus.gifAcquisition Decision Memorandum
https://acc.dau.mil/UI/img/bo/plus.gifAcquisition Decision Memorandum - Phase...
https://acc.dau.mil/UI/img/bo/plus.gifAcquisition Program Baseline
https://acc.dau.mil/UI/img/bo/plus.gifAcquisition Strategy
https://acc.dau.mil/UI/img/bo/plus.gifAffordability Assessment
https://acc.dau.mil/UI/img/bo/plus.gifAffordability Assessment - Phase 3
https://acc.dau.mil/UI/img/bo/plus.gifAllocated Baseline
https://acc.dau.mil/UI/img/bo/plus.gifAnalysis of Alternatives (AoA) - Phase 1
https://acc.dau.mil/UI/img/bo/plus.gifAnalysis of Alternatives (AoA) - Phase 3
https://acc.dau.mil/UI/img/bo/plus.gifApprove & Develop Test Equipment and...
https://acc.dau.mil/UI/img/bo/plus.gifAssess Support Needs
https://acc.dau.mil/UI/img/bo/plus.gifAssign ILS Manager
https://acc.dau.mil/UI/img/bo/plus.gifAssign Product Support Integrator
https://acc.dau.mil/UI/img/bo/plus.gifAssign TRADOC Capabilities Manager (TSM)
https://acc.dau.mil/UI/img/bo/plus.gifBasis of Issue Plan
https://acc.dau.mil/UI/img/bo/plus.gifBasis of Issue Plan Feeder Data
https://acc.dau.mil/UI/img/bo/plus.gifCapability Development Document
https://acc.dau.mil/UI/img/bo/plus.gifCapability Production Document
https://acc.dau.mil/UI/img/bo/plus.gifComparative Analysis 1
https://acc.dau.mil/UI/img/bo/plus.gifComparative Analysis 2
https://acc.dau.mil/UI/img/bo/plus.gifComputer Resources Concept
https://acc.dau.mil/UI/img/bo/plus.gifComputer Resources Life Cycle Management...
https://acc.dau.mil/UI/img/bo/plus.gifComputer Resources Support
https://acc.dau.mil/UI/img/bo/plus.gifContinuous Technology
https://acc.dau.mil/UI/img/bo/plus.gifCore Depot Assessment
https://acc.dau.mil/UI/img/bo/plus.gifCore Logistics Analysis
https://acc.dau.mil/UI/img/bo/plus.gifCost Analysis
https://acc.dau.mil/UI/img/bo/plus.gifCost As Independent Variable - Phase 2
https://acc.dau.mil/UI/img/bo/plus.gifCost As Independent Variable - Phase 3
https://acc.dau.mil/UI/img/bo/plus.gifCritical Design Review
https://acc.dau.mil/UI/img/bo/plus.gifDA Authenticated Equipment Publications
https://acc.dau.mil/UI/img/bo/plus.gifDemilitarization Disposal Operations...
https://acc.dau.mil/UI/img/bo/plus.gifDemilitarization/Disposal
https://acc.dau.mil/UI/img/bo/plus.gifDepot Maintenance Weapon System Support...
https://acc.dau.mil/UI/img/bo/plus.gifDepot Maintenance Capability
https://acc.dau.mil/UI/img/bo/plus.gifDepot Maintenance Support Plan
https://acc.dau.mil/UI/img/bo/plus.gifDepot Test Equipment
https://acc.dau.mil/UI/img/bo/plus.gifDesign Influence
https://acc.dau.mil/UI/img/bo/plus.gifDesign Product Support Package
https://acc.dau.mil/UI/img/bo/plus.gifDesign Tradeoffs / ILS Tradeoffs ...
https://acc.dau.mil/UI/img/bo/plus.gifDevelop and Test Product Support Package
https://acc.dau.mil/UI/img/bo/plus.gifDevelop Modified Table of Organization &...
https://acc.dau.mil/UI/img/bo/plus.gifDiagnostics and Prognostics...
https://acc.dau.mil/UI/img/bo/plus.gifDisposal Implementation
https://acc.dau.mil/UI/img/bo/plus.gifDisposal Plan
https://acc.dau.mil/UI/img/bo/plus.gifDMSMS Plan
https://acc.dau.mil/UI/img/bo/plus.gifDraft Depot Maintenance Work...
https://acc.dau.mil/UI/img/bo/plus.gifDraft Maintenance Allocation Chart (MAC)...
https://acc.dau.mil/UI/img/bo/plus.gifEarly Fielding Analysis
https://acc.dau.mil/UI/img/bo/plus.gifEngineering and Manufacturing...
https://acc.dau.mil/UI/img/bo/plus.gifEngineering Change Proposals
https://acc.dau.mil/UI/img/bo/plus.gifEngineering for Transportability
https://acc.dau.mil/UI/img/bo/plus.gifEquipment Distribution Plan
https://acc.dau.mil/UI/img/bo/plus.gifEquipment Publications Concept
https://acc.dau.mil/UI/img/bo/plus.gifEquipment Publications Input to...
https://acc.dau.mil/UI/img/bo/plus.gifEstablish ILS Management Program
https://acc.dau.mil/UI/img/bo/plus.gifEstablish Integrated Concept Team
https://acc.dau.mil/UI/img/bo/plus.gifEstablish Maintenance Concept
https://acc.dau.mil/UI/img/bo/plus.gifEstablish Sustainment Requirements and...
https://acc.dau.mil/UI/img/bo/plus.gifExit Documents and Products
https://acc.dau.mil/UI/img/bo/plus.gifFacilities
https://acc.dau.mil/UI/img/bo/plus.gifFailure Modes Effects and Criticality...
https://acc.dau.mil/UI/img/bo/plus.gifFailure Modes Effects and Criticality...
https://acc.dau.mil/UI/img/bo/plus.gifFault Tree Analysis
https://acc.dau.mil/UI/img/bo/plus.gifField Data Through STAMIS
https://acc.dau.mil/UI/img/bo/plus.gifFinal MAC
https://acc.dau.mil/UI/img/bo/plus.gifFinal Reproducible Copy
https://acc.dau.mil/UI/img/bo/plus.gifFull Rate Production
https://acc.dau.mil/UI/img/bo/plus.gifFunctional Configuration Audit
https://acc.dau.mil/UI/img/bo/plus.gifFunctional Requirements - Phase 2
https://acc.dau.mil/UI/img/bo/plus.gifFunctional Requirements - Phase 3
https://acc.dau.mil/UI/img/bo/plus.gifGovernment-Furnished Equipment (GFE) ...
https://acc.dau.mil/UI/img/bo/plus.gifHandling and Storage Capability
https://acc.dau.mil/UI/img/bo/plus.gifHandling Equipment Considerations
https://acc.dau.mil/UI/img/bo/plus.gifHazardous Material Handling Requirements...
https://acc.dau.mil/UI/img/bo/plus.gifILS Program Metrics
https://acc.dau.mil/UI/img/bo/plus.gifImplement and Deploy Sustainment...
https://acc.dau.mil/UI/img/bo/plus.gifIndependent Logistics Assessment
https://acc.dau.mil/UI/img/bo/plus.gifInitial Business Case Analysis
https://acc.dau.mil/UI/img/bo/plus.gifInitial Capabilities Document
https://acc.dau.mil/UI/img/bo/plus.gifInitial Configuration Management Plan
https://acc.dau.mil/UI/img/bo/plus.gifInitial Functional Requirements Analysis...
https://acc.dau.mil/UI/img/bo/plus.gifInitial Maintenance Plan
https://acc.dau.mil/UI/img/bo/plus.gifInitial Operational Capability (IOC)
https://acc.dau.mil/UI/img/bo/plus.gifInitial Supportability Strategy
https://acc.dau.mil/UI/img/bo/plus.gifInitial System Engineering Plan
https://acc.dau.mil/UI/img/bo/plus.gifInitial Technical Review
https://acc.dau.mil/UI/img/bo/plus.gifInitiate Logistics Management...
https://acc.dau.mil/UI/img/bo/plus.gifInitiate PBL Activities
https://acc.dau.mil/UI/img/bo/plus.gifInitiate Supportability Analysis
https://acc.dau.mil/UI/img/bo/plus.gifIntegrated Baseline Review
https://acc.dau.mil/UI/img/bo/plus.gifIntegrated Logistics Support (ILS) ...
https://acc.dau.mil/UI/img/bo/plus.gifIntegrated Logistics Support Manager
https://acc.dau.mil/UI/img/bo/plus.gifItem Unique Identification Plan
https://acc.dau.mil/UI/img/bo/plus.gifLevel of Repair Analysis - Phase 2
https://acc.dau.mil/UI/img/bo/plus.gifLevel of Repair Analysis - Phase 3
https://acc.dau.mil/UI/img/bo/plus.gifLife Cycle Cost Analysis
https://acc.dau.mil/UI/img/bo/plus.gifLogistics Demonstration -
https://acc.dau.mil/UI/img/bo/plus.gifLogistics Demonstration Report
https://acc.dau.mil/UI/img/bo/plus.gifLogistics Inputs to Capabilities...
https://acc.dau.mil/UI/img/bo/plus.gifLogistics Inputs to TEMP
https://acc.dau.mil/UI/img/bo/plus.gifLogistics Support Considerations
https://acc.dau.mil/UI/img/bo/plus.gifLow Rate Initial Production (LRIP)
https://acc.dau.mil/UI/img/bo/plus.gifMaintain Equipment Publications/Update...
https://acc.dau.mil/UI/img/bo/plus.gifMaintenance Labor Requirements
https://acc.dau.mil/UI/img/bo/plus.gifMaintenance Operations
https://acc.dau.mil/UI/img/bo/plus.gifMaintenance Planning
https://acc.dau.mil/UI/img/bo/plus.gifManpower and Personnel Integration
https://acc.dau.mil/UI/img/bo/plus.gifManpower Requirements Criteria
https://acc.dau.mil/UI/img/bo/plus.gifMANPRINT Validation
https://acc.dau.mil/UI/img/bo/plus.gifMarket Research & Investigation - Phase...
https://acc.dau.mil/UI/img/bo/plus.gifMarket Research & Investigation - Phase...
https://acc.dau.mil/UI/img/bo/plus.gifMaterial Fielding Team Report
https://acc.dau.mil/UI/img/bo/plus.gifMaterial Solution Analysis Phase
https://acc.dau.mil/UI/img/bo/plus.gifMaterial Transfer Plan
https://acc.dau.mil/UI/img/bo/plus.gifMateriel Condition Status Report
https://acc.dau.mil/UI/img/bo/plus.gifMateriel Fielding Plan -
https://acc.dau.mil/UI/img/bo/plus.gifMateriel Release -
https://acc.dau.mil/UI/img/bo/plus.gifMateriel Release Approval
https://acc.dau.mil/UI/img/bo/plus.gifMateriel Solution Analysis Phase
https://acc.dau.mil/UI/img/bo/plus.gifMilestone A
https://acc.dau.mil/UI/img/bo/plus.gifMilestone B
https://acc.dau.mil/UI/img/bo/plus.gifMilestone C
https://acc.dau.mil/UI/img/bo/plus.gifMission Support Plan
https://acc.dau.mil/UI/img/bo/plus.gifModernization Through Spares
https://acc.dau.mil/UI/img/bo/plus.gifModernization Through Spares
https://acc.dau.mil/UI/img/bo/plus.gifModification Work Orders
https://acc.dau.mil/UI/img/bo/plus.gifModification Work Orders
https://acc.dau.mil/UI/img/bo/plus.gifMonitor PBL Metrics
https://acc.dau.mil/UI/img/bo/plus.gifNew Equipment Training
https://acc.dau.mil/UI/img/bo/plus.gifNew Equipment Training Plan
https://acc.dau.mil/UI/img/bo/plus.gifNew/Revised Equipment Publications
https://acc.dau.mil/UI/img/bo/plus.gifOperational Test Readiness Review
https://acc.dau.mil/UI/img/bo/plus.gifOperations and Support Phase
https://acc.dau.mil/UI/img/bo/plus.gifPackaging Handling Storage and...
https://acc.dau.mil/UI/img/bo/plus.gifPackaging Handling Storage and...
https://acc.dau.mil/UI/img/bo/plus.gifPackaging, Handling, Storage, and...
https://acc.dau.mil/UI/img/bo/plus.gifPackaging, Handling, Storage, and...
https://acc.dau.mil/UI/img/bo/plus.gifPackaging,Handling, Storage &...
https://acc.dau.mil/UI/img/bo/plus.gifPerformance Based Logistics Support
https://acc.dau.mil/UI/img/bo/plus.gifPerformance Metrics
https://acc.dau.mil/UI/img/bo/plus.gifPerformance-Based Agreements
https://acc.dau.mil/UI/img/bo/plus.gifPerformance-Based Support
https://acc.dau.mil/UI/img/bo/plus.gifPhysical Configuration Audit
https://acc.dau.mil/UI/img/bo/plus.gifPlan Equipment Publications
https://acc.dau.mil/UI/img/bo/plus.gifPlan for Personnel
https://acc.dau.mil/UI/img/bo/plus.gifPlan Repair Parts
https://acc.dau.mil/UI/img/bo/plus.gifPlan Technical Data
https://acc.dau.mil/UI/img/bo/plus.gifPlan Training Systems
https://acc.dau.mil/UI/img/bo/plus.gifPost Deployment Software Support
https://acc.dau.mil/UI/img/bo/plus.gifPost Fielding Reviews
https://acc.dau.mil/UI/img/bo/plus.gifPost Production Support Analysis - Phase...
https://acc.dau.mil/UI/img/bo/plus.gifPost Production Support Analysis - Phase...
https://acc.dau.mil/UI/img/bo/plus.gifPost-Production Support Plan
https://acc.dau.mil/UI/img/bo/plus.gifPreferred System Concept
https://acc.dau.mil/UI/img/bo/plus.gifPreliminary Design Review
https://acc.dau.mil/UI/img/bo/plus.gifPreliminary System Specification
https://acc.dau.mil/UI/img/bo/plus.gifPre-Planned Product Improvement
https://acc.dau.mil/UI/img/bo/plus.gifProduce Preliminary Technical Manuals
https://acc.dau.mil/UI/img/bo/plus.gifProducibility Engineering Plan
https://acc.dau.mil/UI/img/bo/plus.gifProduct Baseline
https://acc.dau.mil/UI/img/bo/minus.gifProduction and Deployment Phase
https://acc.dau.mil/UI/img/bo/plus.gifProduction Readiness Review
https://acc.dau.mil/UI/img/bo/plus.gifProgram Facility Funds
https://acc.dau.mil/UI/img/bo/plus.gifProgram Management Activities
https://acc.dau.mil/UI/img/bo/plus.gifProvisioning Data
https://acc.dau.mil/UI/img/bo/plus.gifProvisioning Plan
https://acc.dau.mil/UI/img/bo/plus.gifProvisioning Screening
https://acc.dau.mil/UI/img/bo/plus.gifProvisioning Technical Documentation...
https://acc.dau.mil/UI/img/bo/plus.gifPublish DMWR / NMWR
https://acc.dau.mil/UI/img/bo/plus.gifPublish Modification Work Orders
https://acc.dau.mil/UI/img/bo/plus.gifRefine Task Analysis
https://acc.dau.mil/UI/img/bo/plus.gifReliability Centered Maintenance (RCM)...
https://acc.dau.mil/UI/img/bo/plus.gifReliability Centered Maintenance...
https://acc.dau.mil/UI/img/bo/plus.gifReliability Enhancement
https://acc.dau.mil/UI/img/bo/plus.gifReliability-Centered Maintenance...
https://acc.dau.mil/UI/img/bo/plus.gifRemove Obsolete NSNs
https://acc.dau.mil/UI/img/bo/plus.gifRepair Parts and Special Tools List
https://acc.dau.mil/UI/img/bo/plus.gifRepair Parts Concept
https://acc.dau.mil/UI/img/bo/plus.gifRescind Equipment Publications
https://acc.dau.mil/UI/img/bo/plus.gifResident/OJT Training Requirements
https://acc.dau.mil/UI/img/bo/plus.gifRevise PHS&T Guidance
https://acc.dau.mil/UI/img/bo/plus.gifRevise Training Program
https://acc.dau.mil/UI/img/bo/plus.gifSample Data Collection
https://acc.dau.mil/UI/img/bo/plus.gifSchedule Equipment Publications
https://acc.dau.mil/UI/img/bo/plus.gifSecurity Requirements
https://acc.dau.mil/UI/img/bo/plus.gifSelection and Allocation of Repair Parts
https://acc.dau.mil/UI/img/bo/plus.gifSensitivity Analysis
https://acc.dau.mil/UI/img/bo/plus.gifSet System Readiness Objectives (SRO)...
https://acc.dau.mil/UI/img/bo/plus.gifShelf Life
https://acc.dau.mil/UI/img/bo/plus.gifSkills
https://acc.dau.mil/UI/img/bo/plus.gifSoftware Support
https://acc.dau.mil/UI/img/bo/plus.gifSolicitation Documents
https://acc.dau.mil/UI/img/bo/plus.gifSupply Support
https://acc.dau.mil/UI/img/bo/plus.gifSupport Equipment
https://acc.dau.mil/UI/img/bo/plus.gifSupport Facilities 1
https://acc.dau.mil/UI/img/bo/plus.gifSupport Facilities 2
https://acc.dau.mil/UI/img/bo/plus.gifSupport Facilities Annex
https://acc.dau.mil/UI/img/bo/plus.gifSupport Facilities Concept
https://acc.dau.mil/UI/img/bo/plus.gifSupport for Test Equipment and Tools
https://acc.dau.mil/UI/img/bo/plus.gifSupport System Standardization...
https://acc.dau.mil/UI/img/bo/plus.gifSupport System Standardization...
https://acc.dau.mil/UI/img/bo/plus.gifSupport System Tradeoff Analysis
https://acc.dau.mil/UI/img/bo/plus.gifSupportability Analysis
https://acc.dau.mil/UI/img/bo/plus.gifSupportability Assessment - Phase 2
https://acc.dau.mil/UI/img/bo/plus.gifSupportability Assessment - Phase 3
https://acc.dau.mil/UI/img/bo/plus.gifSupportability Integrated Product Team
https://acc.dau.mil/UI/img/bo/plus.gifSupportability Strategy -
https://acc.dau.mil/UI/img/bo/plus.gifSupportability Test, Evaluation, and...
https://acc.dau.mil/UI/img/bo/plus.gifSustain the System to Achieve Materiel...
https://acc.dau.mil/UI/img/bo/plus.gifSustainment Metrics
https://acc.dau.mil/UI/img/bo/plus.gifSustainment Readiness Review
https://acc.dau.mil/UI/img/bo/plus.gifSystem Concept Review
https://acc.dau.mil/UI/img/bo/plus.gifSystem Engineering Activities
https://acc.dau.mil/UI/img/bo/plus.gifSystem Functional Baseline
https://acc.dau.mil/UI/img/bo/plus.gifSystem Functional Review
https://acc.dau.mil/UI/img/bo/plus.gifSystem MANPRINT Management Plan
https://acc.dau.mil/UI/img/bo/plus.gifSystem Performance Specification
https://acc.dau.mil/UI/img/bo/plus.gifSystem Requirements Review
https://acc.dau.mil/UI/img/bo/plus.gifSystem Specification
https://acc.dau.mil/UI/img/bo/plus.gifSystem Support Package
https://acc.dau.mil/UI/img/bo/plus.gifSystem Training Plan
https://acc.dau.mil/UI/img/bo/plus.gifSystem Verification Review
https://acc.dau.mil/UI/img/bo/plus.gifTarget Audience Description
https://acc.dau.mil/UI/img/bo/plus.gifTask Analysis -
https://acc.dau.mil/UI/img/bo/plus.gifTechnical Baseline
https://acc.dau.mil/UI/img/bo/plus.gifTechnical Data
https://acc.dau.mil/UI/img/bo/plus.gifTechnical Manual Verification Plan
https://acc.dau.mil/UI/img/bo/plus.gifTechnical Reviews
https://acc.dau.mil/UI/img/bo/plus.gifTechnology Development Phase
https://acc.dau.mil/UI/img/bo/plus.gifTechnology Development Strategy
https://acc.dau.mil/UI/img/bo/plus.gifTechnology Refreshment Program
https://acc.dau.mil/UI/img/bo/plus.gifTechnology Risk Reduction Assessment
https://acc.dau.mil/UI/img/bo/plus.gifTest and Evaluation Master Plan -
https://acc.dau.mil/UI/img/bo/plus.gifTest Equipment and Tool Concept
https://acc.dau.mil/UI/img/bo/plus.gifTest Equipment and Tools
https://acc.dau.mil/UI/img/bo/plus.gifTest Program Sets
https://acc.dau.mil/UI/img/bo/plus.gifTest Readiness Review
https://acc.dau.mil/UI/img/bo/plus.gifTotal Package Fielding
https://acc.dau.mil/UI/img/bo/plus.gifTrained Personnel
https://acc.dau.mil/UI/img/bo/plus.gifTraining — Program of Instruction
https://acc.dau.mil/UI/img/bo/plus.gifTraining and Training Support
https://acc.dau.mil/UI/img/bo/plus.gifTraining Concept
https://acc.dau.mil/UI/img/bo/plus.gifTraining for Test
https://acc.dau.mil/UI/img/bo/plus.gifTraining Materials Determination
https://acc.dau.mil/UI/img/bo/plus.gifTransportability Report
https://acc.dau.mil/UI/img/bo/plus.gifType Classification
https://acc.dau.mil/UI/img/bo/plus.gifType II Business Case Analysis
https://acc.dau.mil/UI/img/bo/plus.gifUpdate Analysis of Alternatives
https://acc.dau.mil/UI/img/bo/plus.gifUpdate Computer Resource Management Plan
https://acc.dau.mil/UI/img/bo/plus.gifUpdate Disposal Plan
https://acc.dau.mil/UI/img/bo/plus.gifUpdate Item Unique Identification (IUID)...
https://acc.dau.mil/UI/img/bo/plus.gifUpdate Life Cycle Sustainment Plan (...
https://acc.dau.mil/UI/img/bo/plus.gifUpdate Market Research
https://acc.dau.mil/UI/img/bo/plus.gifUpdate Materiel Fielding Plan
https://acc.dau.mil/UI/img/bo/plus.gifUpdate Modification Table of...
https://acc.dau.mil/UI/img/bo/plus.gifUpdate National Stock Numbers (NSN)
https://acc.dau.mil/UI/img/bo/plus.gifUpdate Provisioning Data
https://acc.dau.mil/UI/img/bo/plus.gifUpdate System Training Plan (STRAP)
https://acc.dau.mil/UI/img/bo/plus.gifUpdate Systems Engineering Plan -...
https://acc.dau.mil/UI/img/bo/plus.gifUpdate Systems Engineering Plan -...
https://acc.dau.mil/UI/img/bo/plus.gifUpdate TEMP
https://acc.dau.mil/UI/img/bo/plus.gifUpdate TO&E
https://acc.dau.mil/UI/img/bo/plus.gifUpdate Transportability Report
https://acc.dau.mil/UI/img/bo/plus.gifUse Study
https://acc.dau.mil/UI/img/bo/plus.gifValidate Computer Support
https://acc.dau.mil/UI/img/bo/plus.gifValidate Facility Requirements
https://acc.dau.mil/UI/img/bo/plus.gifValidate MAC
https://acc.dau.mil/UI/img/bo/plus.gifValidate MANPRINT
https://acc.dau.mil/UI/img/bo/plus.gifValidate Packaging Handling Storage &...
https://acc.dau.mil/UI/img/bo/plus.gifValidate Preliminary Technical Manuals
https://acc.dau.mil/UI/img/bo/plus.gifValidate RCM
https://acc.dau.mil/UI/img/bo/plus.gifValidate Repair Parts
https://acc.dau.mil/UI/img/bo/plus.gifValidate Training Systems
https://acc.dau.mil/UI/img/bo/plus.gifVerify DMWR/NMWR
https://acc.dau.mil/UI/img/bo/plus.gifVerify Equipment Publications
https://acc.dau.mil/UI/img/bo/plus.gifWarranties Program
ACC Practice Center Version 3.2
  • Application Build 3.2.8
  • Database Version 3.2.8