DEFINITION

Training systems and devices (or trainers) are acquired to satisfy training deficiencies, reduce training costs, enhance training effectiveness or as an approved strategy in the Army's Combined Arms Training Strategy. They are broadly categorized as either system or nonsystem trainers.


GENERAL INFORMATION/NARRATIVE

They may be standalone, embedded, component level, or appended training devices. System trainers may be either acquired by a system PEO/PM or the Program Executive Office for Simulation, Training and Instrumentation (PEO STRI) for the PEO/PM. The requirement for system trainers must be documented in the system CD and prioritized and funded with the system.

The PEO STRI has the responsibility to conduct concept formulation for all training devices (system and nonsystem). The system PEO/PM normally provides funding for concept formulation for system training devices.

Concept formulation or AoA consists of a series of analytical or tradeoff studies performed by the PEO STRI in coordination with the SIPT, MATDEV, and TNGDEV to determine the best technical approach for developing and procuring the most cost-effective, proficiency-enhancing and operationally effective trainer.

System trainer requirements are analyzed as a part of new equipment acquisitions. The training system/device capabilities document is prepared by the CBTDEV and provided to the PEO STRI.

Training system/device acquisitions must comply with DODD 5000.1, DODI 5000.2, AR 70-1, and AR 71-9. 

PEO STRI has the mission for life-cycle management of all training systems/devices that are LCCS and must ensure that funding requirements are included in the POM. OMA funds are used for LCCS.

(see DA Pam 700-56)

GEIA-STD-0007 Interface: E, Entities, Support Equipment Requirements.  Data Entities identified by an "E" in the first position of the entity name are structured to consolidate the pertinent information related to existing or new support/test equipment or training equipment.  Much of this information serves as administrative type data for the Support Equipment Recommendation Data (SERD) data exchange set.  This information also serves as identification of hardware and software elements required to conduct off-line tests. 

G Entities, Skill and Training Requirements.  Data Entities beginning with "G" in the first position of the entity name are structured to describe and justify any new or modified personnel skills required to support the system/equipment.  The information contained in the E and G Entities can be used to document the need for training devices and the specifications for the training devices.

DODI 5000.2 requires that analysis, T&E results, or independent reviews confirm the adequacy of the proposed maintenance plan and programmed support resources to meet objectives for peacetime readiness and wartime employment. It also requires that the ability to support any system be demonstrated before the system is placed in the hands of the user. The LD is conducted to confirm that support resources and tasks developed to sustain the system will function as intended. The LD data is supplemented by supportability related data obtained during developmental test and

evaluation (DT&E) and OT&E to confirm the correct resources and tasks have been developed. AR 700–127 identifies the LD as a means for satisfying DOD requirements for all acquisition programs.

The LD is a validation process managed by the MATDEV. Maximum use should be made of existing qualitative and quantitative data such as when the item is us ed by another service, industry, or country. In order to minimize cost and schedule risk, existing qualitative and quantitative demonstrations, evaluations, analyses, simulations and testsshould be used to meet LD requirements.The information in the E Entities are used to justify the requirement for new test equipment/tools.  


POLICIES, DIRECTIVES, REGULATIONS, LAWS

DODD 5000.1, DODI 5000.2, AR 70-1, and AR 71-9. 


BEST PRACTICES, LESSONS LEARNED, STORIES, GUIDES, HANDBOOKS, TEMPLATES, EXAMPLES, TOOLS


COMMUNITIES OF PRACTICE


TRAINING RESOURCES


RELATED ARTICLES


Definition General Info Policies Guides Communities Training Related

List of All Contributions at This Location

No items found.

Popular Tags

Page Information

At this page:
5717 Page Views 0 Pages Emailed
0 Meta-card Views 0 Documents and Videos
0 Questions 0 Attachments Downloaded
0 Answers 0 Videos downloaded
0 Relationships and Highlights
ID247151
Date CreatedTuesday, November 18, 2008 11:24 AM
Date ModifiedFriday, August 28, 2009 12:55 PM
Version Comment:

Sign In

Login with your CAC

Insert your CAC now, and click this button.


Login with your Password

User Name:

Password:

Forgot your password?

  

Benefits of ACC Membership


Browse

https://acc.dau.mil/UI/img/bo/minus.gifIntegrated Logistic Support and Logistic...
https://acc.dau.mil/UI/img/bo/plus.gif Materiel Development Decision ...
https://acc.dau.mil/UI/img/bo/plus.gifAcquisition Decision Memorandum
https://acc.dau.mil/UI/img/bo/plus.gifAcquisition Decision Memorandum - Phase...
https://acc.dau.mil/UI/img/bo/plus.gifAcquisition Program Baseline
https://acc.dau.mil/UI/img/bo/plus.gifAcquisition Strategy
https://acc.dau.mil/UI/img/bo/plus.gifAffordability Assessment
https://acc.dau.mil/UI/img/bo/plus.gifAffordability Assessment - Phase 3
https://acc.dau.mil/UI/img/bo/plus.gifAllocated Baseline
https://acc.dau.mil/UI/img/bo/plus.gifAnalysis of Alternatives (AoA) - Phase 1
https://acc.dau.mil/UI/img/bo/plus.gifAnalysis of Alternatives (AoA) - Phase 3
https://acc.dau.mil/UI/img/bo/plus.gifApprove & Develop Test Equipment and...
https://acc.dau.mil/UI/img/bo/plus.gifAssess Support Needs
https://acc.dau.mil/UI/img/bo/plus.gifAssign ILS Manager
https://acc.dau.mil/UI/img/bo/plus.gifAssign Product Support Integrator
https://acc.dau.mil/UI/img/bo/plus.gifAssign TRADOC Capabilities Manager (TSM)
https://acc.dau.mil/UI/img/bo/plus.gifBasis of Issue Plan
https://acc.dau.mil/UI/img/bo/plus.gifBasis of Issue Plan Feeder Data
https://acc.dau.mil/UI/img/bo/plus.gifCapability Development Document
https://acc.dau.mil/UI/img/bo/plus.gifCapability Production Document
https://acc.dau.mil/UI/img/bo/plus.gifComparative Analysis 1
https://acc.dau.mil/UI/img/bo/plus.gifComparative Analysis 2
https://acc.dau.mil/UI/img/bo/plus.gifComputer Resources Concept
https://acc.dau.mil/UI/img/bo/plus.gifComputer Resources Life Cycle Management...
https://acc.dau.mil/UI/img/bo/plus.gifComputer Resources Support
https://acc.dau.mil/UI/img/bo/plus.gifContinuous Technology
https://acc.dau.mil/UI/img/bo/plus.gifCore Depot Assessment
https://acc.dau.mil/UI/img/bo/plus.gifCore Logistics Analysis
https://acc.dau.mil/UI/img/bo/plus.gifCost Analysis
https://acc.dau.mil/UI/img/bo/plus.gifCost As Independent Variable - Phase 2
https://acc.dau.mil/UI/img/bo/plus.gifCost As Independent Variable - Phase 3
https://acc.dau.mil/UI/img/bo/plus.gifCritical Design Review
https://acc.dau.mil/UI/img/bo/plus.gifDA Authenticated Equipment Publications
https://acc.dau.mil/UI/img/bo/plus.gifDemilitarization Disposal Operations...
https://acc.dau.mil/UI/img/bo/plus.gifDemilitarization/Disposal
https://acc.dau.mil/UI/img/bo/plus.gifDepot Maintenance Weapon System Support...
https://acc.dau.mil/UI/img/bo/plus.gifDepot Maintenance Capability
https://acc.dau.mil/UI/img/bo/plus.gifDepot Maintenance Support Plan
https://acc.dau.mil/UI/img/bo/plus.gifDepot Test Equipment
https://acc.dau.mil/UI/img/bo/plus.gifDesign Influence
https://acc.dau.mil/UI/img/bo/plus.gifDesign Product Support Package
https://acc.dau.mil/UI/img/bo/plus.gifDesign Tradeoffs / ILS Tradeoffs ...
https://acc.dau.mil/UI/img/bo/plus.gifDevelop and Test Product Support Package
https://acc.dau.mil/UI/img/bo/plus.gifDevelop Modified Table of Organization &...
https://acc.dau.mil/UI/img/bo/plus.gifDiagnostics and Prognostics...
https://acc.dau.mil/UI/img/bo/plus.gifDisposal Implementation
https://acc.dau.mil/UI/img/bo/plus.gifDisposal Plan
https://acc.dau.mil/UI/img/bo/plus.gifDMSMS Plan
https://acc.dau.mil/UI/img/bo/plus.gifDraft Depot Maintenance Work...
https://acc.dau.mil/UI/img/bo/plus.gifDraft Maintenance Allocation Chart (MAC)...
https://acc.dau.mil/UI/img/bo/plus.gifEarly Fielding Analysis
https://acc.dau.mil/UI/img/bo/plus.gifEngineering and Manufacturing...
https://acc.dau.mil/UI/img/bo/plus.gifEngineering Change Proposals
https://acc.dau.mil/UI/img/bo/plus.gifEngineering for Transportability
https://acc.dau.mil/UI/img/bo/plus.gifEquipment Distribution Plan
https://acc.dau.mil/UI/img/bo/plus.gifEquipment Publications Concept
https://acc.dau.mil/UI/img/bo/plus.gifEquipment Publications Input to...
https://acc.dau.mil/UI/img/bo/plus.gifEstablish ILS Management Program
https://acc.dau.mil/UI/img/bo/plus.gifEstablish Integrated Concept Team
https://acc.dau.mil/UI/img/bo/plus.gifEstablish Maintenance Concept
https://acc.dau.mil/UI/img/bo/plus.gifEstablish Sustainment Requirements and...
https://acc.dau.mil/UI/img/bo/plus.gifExit Documents and Products
https://acc.dau.mil/UI/img/bo/plus.gifFacilities
https://acc.dau.mil/UI/img/bo/plus.gifFailure Modes Effects and Criticality...
https://acc.dau.mil/UI/img/bo/plus.gifFailure Modes Effects and Criticality...
https://acc.dau.mil/UI/img/bo/plus.gifFault Tree Analysis
https://acc.dau.mil/UI/img/bo/plus.gifField Data Through STAMIS
https://acc.dau.mil/UI/img/bo/plus.gifFinal MAC
https://acc.dau.mil/UI/img/bo/plus.gifFinal Reproducible Copy
https://acc.dau.mil/UI/img/bo/plus.gifFull Rate Production
https://acc.dau.mil/UI/img/bo/plus.gifFunctional Configuration Audit
https://acc.dau.mil/UI/img/bo/plus.gifFunctional Requirements - Phase 2
https://acc.dau.mil/UI/img/bo/plus.gifFunctional Requirements - Phase 3
https://acc.dau.mil/UI/img/bo/plus.gifGovernment-Furnished Equipment (GFE) ...
https://acc.dau.mil/UI/img/bo/plus.gifHandling and Storage Capability
https://acc.dau.mil/UI/img/bo/plus.gifHandling Equipment Considerations
https://acc.dau.mil/UI/img/bo/plus.gifHazardous Material Handling Requirements...
https://acc.dau.mil/UI/img/bo/plus.gifILS Program Metrics
https://acc.dau.mil/UI/img/bo/plus.gifImplement and Deploy Sustainment...
https://acc.dau.mil/UI/img/bo/plus.gifIndependent Logistics Assessment
https://acc.dau.mil/UI/img/bo/plus.gifInitial Business Case Analysis
https://acc.dau.mil/UI/img/bo/plus.gifInitial Capabilities Document
https://acc.dau.mil/UI/img/bo/plus.gifInitial Configuration Management Plan
https://acc.dau.mil/UI/img/bo/plus.gifInitial Functional Requirements Analysis...
https://acc.dau.mil/UI/img/bo/plus.gifInitial Maintenance Plan
https://acc.dau.mil/UI/img/bo/plus.gifInitial Operational Capability (IOC)
https://acc.dau.mil/UI/img/bo/plus.gifInitial Supportability Strategy
https://acc.dau.mil/UI/img/bo/plus.gifInitial System Engineering Plan
https://acc.dau.mil/UI/img/bo/plus.gifInitial Technical Review
https://acc.dau.mil/UI/img/bo/plus.gifInitiate Logistics Management...
https://acc.dau.mil/UI/img/bo/plus.gifInitiate PBL Activities
https://acc.dau.mil/UI/img/bo/plus.gifInitiate Supportability Analysis
https://acc.dau.mil/UI/img/bo/plus.gifIntegrated Baseline Review
https://acc.dau.mil/UI/img/bo/plus.gifIntegrated Logistics Support (ILS) ...
https://acc.dau.mil/UI/img/bo/plus.gifIntegrated Logistics Support Manager
https://acc.dau.mil/UI/img/bo/plus.gifItem Unique Identification Plan
https://acc.dau.mil/UI/img/bo/plus.gifLevel of Repair Analysis - Phase 2
https://acc.dau.mil/UI/img/bo/plus.gifLevel of Repair Analysis - Phase 3
https://acc.dau.mil/UI/img/bo/plus.gifLife Cycle Cost Analysis
https://acc.dau.mil/UI/img/bo/plus.gifLogistics Demonstration -
https://acc.dau.mil/UI/img/bo/plus.gifLogistics Demonstration Report
https://acc.dau.mil/UI/img/bo/plus.gifLogistics Inputs to Capabilities...
https://acc.dau.mil/UI/img/bo/plus.gifLogistics Inputs to TEMP
https://acc.dau.mil/UI/img/bo/plus.gifLogistics Support Considerations
https://acc.dau.mil/UI/img/bo/plus.gifLow Rate Initial Production (LRIP)
https://acc.dau.mil/UI/img/bo/plus.gifMaintain Equipment Publications/Update...
https://acc.dau.mil/UI/img/bo/plus.gifMaintenance Labor Requirements
https://acc.dau.mil/UI/img/bo/plus.gifMaintenance Operations
https://acc.dau.mil/UI/img/bo/plus.gifMaintenance Planning
https://acc.dau.mil/UI/img/bo/plus.gifManpower and Personnel Integration
https://acc.dau.mil/UI/img/bo/plus.gifManpower Requirements Criteria
https://acc.dau.mil/UI/img/bo/plus.gifMANPRINT Validation
https://acc.dau.mil/UI/img/bo/plus.gifMarket Research & Investigation - Phase...
https://acc.dau.mil/UI/img/bo/plus.gifMarket Research & Investigation - Phase...
https://acc.dau.mil/UI/img/bo/plus.gifMaterial Fielding Team Report
https://acc.dau.mil/UI/img/bo/plus.gifMaterial Solution Analysis Phase
https://acc.dau.mil/UI/img/bo/plus.gifMaterial Transfer Plan
https://acc.dau.mil/UI/img/bo/plus.gifMateriel Condition Status Report
https://acc.dau.mil/UI/img/bo/plus.gifMateriel Fielding Plan -
https://acc.dau.mil/UI/img/bo/plus.gifMateriel Release -
https://acc.dau.mil/UI/img/bo/plus.gifMateriel Release Approval
https://acc.dau.mil/UI/img/bo/plus.gifMateriel Solution Analysis Phase
https://acc.dau.mil/UI/img/bo/plus.gifMilestone A
https://acc.dau.mil/UI/img/bo/plus.gifMilestone B
https://acc.dau.mil/UI/img/bo/plus.gifMilestone C
https://acc.dau.mil/UI/img/bo/plus.gifMission Support Plan
https://acc.dau.mil/UI/img/bo/plus.gifModernization Through Spares
https://acc.dau.mil/UI/img/bo/plus.gifModernization Through Spares
https://acc.dau.mil/UI/img/bo/plus.gifModification Work Orders
https://acc.dau.mil/UI/img/bo/plus.gifModification Work Orders
https://acc.dau.mil/UI/img/bo/plus.gifMonitor PBL Metrics
https://acc.dau.mil/UI/img/bo/plus.gifNew Equipment Training
https://acc.dau.mil/UI/img/bo/plus.gifNew Equipment Training Plan
https://acc.dau.mil/UI/img/bo/plus.gifNew/Revised Equipment Publications
https://acc.dau.mil/UI/img/bo/plus.gifOperational Test Readiness Review
https://acc.dau.mil/UI/img/bo/plus.gifOperations and Support Phase
https://acc.dau.mil/UI/img/bo/plus.gifPackaging Handling Storage and...
https://acc.dau.mil/UI/img/bo/plus.gifPackaging Handling Storage and...
https://acc.dau.mil/UI/img/bo/plus.gifPackaging, Handling, Storage, and...
https://acc.dau.mil/UI/img/bo/plus.gifPackaging, Handling, Storage, and...
https://acc.dau.mil/UI/img/bo/plus.gifPackaging,Handling, Storage &...
https://acc.dau.mil/UI/img/bo/plus.gifPerformance Based Logistics Support
https://acc.dau.mil/UI/img/bo/plus.gifPerformance Metrics
https://acc.dau.mil/UI/img/bo/plus.gifPerformance-Based Agreements
https://acc.dau.mil/UI/img/bo/plus.gifPerformance-Based Support
https://acc.dau.mil/UI/img/bo/plus.gifPhysical Configuration Audit
https://acc.dau.mil/UI/img/bo/plus.gifPlan Equipment Publications
https://acc.dau.mil/UI/img/bo/plus.gifPlan for Personnel
https://acc.dau.mil/UI/img/bo/plus.gifPlan Repair Parts
https://acc.dau.mil/UI/img/bo/plus.gifPlan Technical Data
https://acc.dau.mil/UI/img/bo/minus.gifPlan Training Systems
https://acc.dau.mil/UI/img/bo/plus.gifPost Deployment Software Support
https://acc.dau.mil/UI/img/bo/plus.gifPost Fielding Reviews
https://acc.dau.mil/UI/img/bo/plus.gifPost Production Support Analysis - Phase...
https://acc.dau.mil/UI/img/bo/plus.gifPost Production Support Analysis - Phase...
https://acc.dau.mil/UI/img/bo/plus.gifPost-Production Support Plan
https://acc.dau.mil/UI/img/bo/plus.gifPreferred System Concept
https://acc.dau.mil/UI/img/bo/plus.gifPreliminary Design Review
https://acc.dau.mil/UI/img/bo/plus.gifPreliminary System Specification
https://acc.dau.mil/UI/img/bo/plus.gifPre-Planned Product Improvement
https://acc.dau.mil/UI/img/bo/plus.gifProduce Preliminary Technical Manuals
https://acc.dau.mil/UI/img/bo/plus.gifProducibility Engineering Plan
https://acc.dau.mil/UI/img/bo/plus.gifProduct Baseline
https://acc.dau.mil/UI/img/bo/plus.gifProduction and Deployment Phase
https://acc.dau.mil/UI/img/bo/plus.gifProduction Readiness Review
https://acc.dau.mil/UI/img/bo/plus.gifProgram Facility Funds
https://acc.dau.mil/UI/img/bo/plus.gifProgram Management Activities
https://acc.dau.mil/UI/img/bo/plus.gifProvisioning Data
https://acc.dau.mil/UI/img/bo/plus.gifProvisioning Plan
https://acc.dau.mil/UI/img/bo/plus.gifProvisioning Screening
https://acc.dau.mil/UI/img/bo/plus.gifProvisioning Technical Documentation...
https://acc.dau.mil/UI/img/bo/plus.gifPublish DMWR / NMWR
https://acc.dau.mil/UI/img/bo/plus.gifPublish Modification Work Orders
https://acc.dau.mil/UI/img/bo/plus.gifRefine Task Analysis
https://acc.dau.mil/UI/img/bo/plus.gifReliability Centered Maintenance (RCM)...
https://acc.dau.mil/UI/img/bo/plus.gifReliability Centered Maintenance...
https://acc.dau.mil/UI/img/bo/plus.gifReliability Enhancement
https://acc.dau.mil/UI/img/bo/plus.gifReliability-Centered Maintenance...
https://acc.dau.mil/UI/img/bo/plus.gifRemove Obsolete NSNs
https://acc.dau.mil/UI/img/bo/plus.gifRepair Parts and Special Tools List
https://acc.dau.mil/UI/img/bo/plus.gifRepair Parts Concept
https://acc.dau.mil/UI/img/bo/plus.gifRescind Equipment Publications
https://acc.dau.mil/UI/img/bo/plus.gifResident/OJT Training Requirements
https://acc.dau.mil/UI/img/bo/plus.gifRevise PHS&T Guidance
https://acc.dau.mil/UI/img/bo/plus.gifRevise Training Program
https://acc.dau.mil/UI/img/bo/plus.gifSample Data Collection
https://acc.dau.mil/UI/img/bo/plus.gifSchedule Equipment Publications
https://acc.dau.mil/UI/img/bo/plus.gifSecurity Requirements
https://acc.dau.mil/UI/img/bo/plus.gifSelection and Allocation of Repair Parts
https://acc.dau.mil/UI/img/bo/plus.gifSensitivity Analysis
https://acc.dau.mil/UI/img/bo/plus.gifSet System Readiness Objectives (SRO)...
https://acc.dau.mil/UI/img/bo/plus.gifShelf Life
https://acc.dau.mil/UI/img/bo/plus.gifSkills
https://acc.dau.mil/UI/img/bo/plus.gifSoftware Support
https://acc.dau.mil/UI/img/bo/plus.gifSolicitation Documents
https://acc.dau.mil/UI/img/bo/plus.gifSupply Support
https://acc.dau.mil/UI/img/bo/plus.gifSupport Equipment
https://acc.dau.mil/UI/img/bo/plus.gifSupport Facilities 1
https://acc.dau.mil/UI/img/bo/plus.gifSupport Facilities 2
https://acc.dau.mil/UI/img/bo/plus.gifSupport Facilities Annex
https://acc.dau.mil/UI/img/bo/plus.gifSupport Facilities Concept
https://acc.dau.mil/UI/img/bo/plus.gifSupport for Test Equipment and Tools
https://acc.dau.mil/UI/img/bo/plus.gifSupport System Standardization...
https://acc.dau.mil/UI/img/bo/plus.gifSupport System Standardization...
https://acc.dau.mil/UI/img/bo/plus.gifSupport System Tradeoff Analysis
https://acc.dau.mil/UI/img/bo/plus.gifSupportability Analysis
https://acc.dau.mil/UI/img/bo/plus.gifSupportability Assessment - Phase 2
https://acc.dau.mil/UI/img/bo/plus.gifSupportability Assessment - Phase 3
https://acc.dau.mil/UI/img/bo/plus.gifSupportability Integrated Product Team
https://acc.dau.mil/UI/img/bo/plus.gifSupportability Strategy -
https://acc.dau.mil/UI/img/bo/plus.gifSupportability Test, Evaluation, and...
https://acc.dau.mil/UI/img/bo/plus.gifSustain the System to Achieve Materiel...
https://acc.dau.mil/UI/img/bo/plus.gifSustainment Metrics
https://acc.dau.mil/UI/img/bo/plus.gifSustainment Readiness Review
https://acc.dau.mil/UI/img/bo/plus.gifSystem Concept Review
https://acc.dau.mil/UI/img/bo/plus.gifSystem Engineering Activities
https://acc.dau.mil/UI/img/bo/plus.gifSystem Functional Baseline
https://acc.dau.mil/UI/img/bo/plus.gifSystem Functional Review
https://acc.dau.mil/UI/img/bo/plus.gifSystem MANPRINT Management Plan
https://acc.dau.mil/UI/img/bo/plus.gifSystem Performance Specification
https://acc.dau.mil/UI/img/bo/plus.gifSystem Requirements Review
https://acc.dau.mil/UI/img/bo/plus.gifSystem Specification
https://acc.dau.mil/UI/img/bo/plus.gifSystem Support Package
https://acc.dau.mil/UI/img/bo/plus.gifSystem Training Plan
https://acc.dau.mil/UI/img/bo/plus.gifSystem Verification Review
https://acc.dau.mil/UI/img/bo/plus.gifTarget Audience Description
https://acc.dau.mil/UI/img/bo/plus.gifTask Analysis -
https://acc.dau.mil/UI/img/bo/plus.gifTechnical Baseline
https://acc.dau.mil/UI/img/bo/plus.gifTechnical Data
https://acc.dau.mil/UI/img/bo/plus.gifTechnical Manual Verification Plan
https://acc.dau.mil/UI/img/bo/plus.gifTechnical Reviews
https://acc.dau.mil/UI/img/bo/plus.gifTechnology Development Phase
https://acc.dau.mil/UI/img/bo/plus.gifTechnology Development Strategy
https://acc.dau.mil/UI/img/bo/plus.gifTechnology Refreshment Program
https://acc.dau.mil/UI/img/bo/plus.gifTechnology Risk Reduction Assessment
https://acc.dau.mil/UI/img/bo/plus.gifTest and Evaluation Master Plan -
https://acc.dau.mil/UI/img/bo/plus.gifTest Equipment and Tool Concept
https://acc.dau.mil/UI/img/bo/plus.gifTest Equipment and Tools
https://acc.dau.mil/UI/img/bo/plus.gifTest Program Sets
https://acc.dau.mil/UI/img/bo/plus.gifTest Readiness Review
https://acc.dau.mil/UI/img/bo/plus.gifTotal Package Fielding
https://acc.dau.mil/UI/img/bo/plus.gifTrained Personnel
https://acc.dau.mil/UI/img/bo/plus.gifTraining — Program of Instruction
https://acc.dau.mil/UI/img/bo/plus.gifTraining and Training Support
https://acc.dau.mil/UI/img/bo/plus.gifTraining Concept
https://acc.dau.mil/UI/img/bo/plus.gifTraining for Test
https://acc.dau.mil/UI/img/bo/plus.gifTraining Materials Determination
https://acc.dau.mil/UI/img/bo/plus.gifTransportability Report
https://acc.dau.mil/UI/img/bo/plus.gifType Classification
https://acc.dau.mil/UI/img/bo/plus.gifType II Business Case Analysis
https://acc.dau.mil/UI/img/bo/plus.gifUpdate Analysis of Alternatives
https://acc.dau.mil/UI/img/bo/plus.gifUpdate Computer Resource Management Plan
https://acc.dau.mil/UI/img/bo/plus.gifUpdate Disposal Plan
https://acc.dau.mil/UI/img/bo/plus.gifUpdate Item Unique Identification (IUID)...
https://acc.dau.mil/UI/img/bo/plus.gifUpdate Life Cycle Sustainment Plan (...
https://acc.dau.mil/UI/img/bo/plus.gifUpdate Market Research
https://acc.dau.mil/UI/img/bo/plus.gifUpdate Materiel Fielding Plan
https://acc.dau.mil/UI/img/bo/plus.gifUpdate Modification Table of...
https://acc.dau.mil/UI/img/bo/plus.gifUpdate National Stock Numbers (NSN)
https://acc.dau.mil/UI/img/bo/plus.gifUpdate Provisioning Data
https://acc.dau.mil/UI/img/bo/plus.gifUpdate System Training Plan (STRAP)
https://acc.dau.mil/UI/img/bo/plus.gifUpdate Systems Engineering Plan -...
https://acc.dau.mil/UI/img/bo/plus.gifUpdate Systems Engineering Plan -...
https://acc.dau.mil/UI/img/bo/plus.gifUpdate TEMP
https://acc.dau.mil/UI/img/bo/plus.gifUpdate TO&E
https://acc.dau.mil/UI/img/bo/plus.gifUpdate Transportability Report
https://acc.dau.mil/UI/img/bo/plus.gifUse Study
https://acc.dau.mil/UI/img/bo/plus.gifValidate Computer Support
https://acc.dau.mil/UI/img/bo/plus.gifValidate Facility Requirements
https://acc.dau.mil/UI/img/bo/plus.gifValidate MAC
https://acc.dau.mil/UI/img/bo/plus.gifValidate MANPRINT
https://acc.dau.mil/UI/img/bo/plus.gifValidate Packaging Handling Storage &...
https://acc.dau.mil/UI/img/bo/plus.gifValidate Preliminary Technical Manuals
https://acc.dau.mil/UI/img/bo/plus.gifValidate RCM
https://acc.dau.mil/UI/img/bo/plus.gifValidate Repair Parts
https://acc.dau.mil/UI/img/bo/plus.gifValidate Training Systems
https://acc.dau.mil/UI/img/bo/plus.gifVerify DMWR/NMWR
https://acc.dau.mil/UI/img/bo/plus.gifVerify Equipment Publications
https://acc.dau.mil/UI/img/bo/plus.gifWarranties Program
ACC Practice Center Version 3.2
  • Application Build 3.2.8
  • Database Version 3.2.8