Post Fielding Reviews

Definition

Post Fielding Reviews are reviews of fielded systems that are performed to verify that cost, performance, and support goals are being met after the system is fielded.

General/Information/Narrative

Program Assessments evaluate supportability, logistics, readiness, and sustainment planning. They are conducted by each service to help ensure a solid and executable life cycle product support strategy. The purpose of an assessment is to determine the sufficiency of a program’s overall product support and sustainment planning, and implementation prior to acquisition milestones and major decisions. Particularly in the early acquisition phases, assessments independent of the program manager and program office are management practices that have proved to be particularly useful in managing product support risks by providing an impartial evaluation of a program’s product support and sustainment planning, and implementation. The Services have independently established formal assessment processes in service-specific policies and instructions. The process names vary among the services, but all are intended to assist the Program Manager in the successful execution of Total Life Cycle Systems Management (TLCSM) responsibilities. Links to key Service assessment documents are provided in section 5.5.13, Web References.

Post-deployment or Post Fielding Reviews of a system are used by program managers. Typically, these begin at Initial Operational Capability (IOC) and are used to verify whether the fielded system continues to meet or exceed thresholds and objectives for the cost, performance, and support parameters approved at full-rate production. These reviews occur nominally every three to five years after IOC or when precipitated by changes in requirements/design or performance problems. The reviews should include, at minimum:

                Product Support Integrator/Provider performance

                Product improvements incorporated

                Configuration control

Post-deployment or Post Fielding Reviews continue as operational support plans are executed (including transition from organic to contract support and vice versa, if applicable), and should be regularly updated depending on the pace of technology. The program manager should use existing reporting systems and operational feedback to evaluate the fielded system whenever possible.

Policies, Directives, Regulations, Laws

DoD Directive 5000.01, The Defense Acquisition System, defines the management process by which the Department of Defense provides effective, affordable, and supportable systems to the users in a timely manner. Its policy includes implementation of a Total Systems Approach as discussed in E1.1.29. Total Systems Approach for accomplishing program objectives for total life-cycle systems management, including sustainment, and implementing performance-based strategies throughout the product life cycle, as discussed in E1.1.17, Performance-Based Logistics.

DoD Instruction 5000.02, Operation of the Defense Acquisition System, establishes the management framework for translating capability needs and technology opportunities, based on approved capability needs, into stable, affordable, and well-managed acquisition programs. DoD Instruction 5000.02, Table E3.T1, refers to The Government Performance and Results Act (GPRA) that requires Federal Agencies acquiring Information Technology and National Security Systems to compare actual program results with established performance objectives, and the Clinger-Cohen Act (CCA) which requires that Federal Agencies ensure that performance measurements are prescribed for the information technology (IT) to be acquired, and that these performance measurements measure how well the IT supports the programs of the Agency. As a result, a Post Deployment Performance Review (PDPR) is required for MAIS and MDAP acquisition programs at the Full-Rate Production Decision Review. An appropriately conducted PDPR can satisfy both GPRA and CCA requirements for a post deployment evaluation. This information is also discussed in Defense Acquisition Guidebook Chapter 7 – Acquiring Information Technology and National Security Systems

USD(AT&L) Memorandum, Implementing a Life Cycle Management Framework [ACC], DTD 31 Jul 08, identified Implementing a Life Cycle Management Framework as a top priority for the Department of Defense. To achieve that objective, DoD must seamlessly integrate its acquisition and life cycle sustainment policies. To that end, this memo establishes a strategy and provides direction to achieve the following: (1) reinforce the implementation of mandatory life cycle sustainment metrics; (2) align resources to achieve readiness levels; (3) track performance throughout the life cycle; and (4) implement performance-based life cycle product support strategies.

DUSD (L&MR) Policy Memo "Life Cycle Sustainment Outcome Metrics", DTD 10 Mar 07 establishes four sustainment outcome metrics for all ACAT (Acquisition Category) 1 Acquisition Programs, as well as all major legacy programs currently included in the Defense Readiness Reporting System (DRRS). The four metrics are Materiel Availability, Materiel Readiness, Ownership Cost, and Mean Down Time. In addition, Materiel Availability is also a JROC-established Key Performance Parameter (KPP) requirement and Materiel Readiness and Ownership Cost are JROC-established Key System Attribute (KSA) requirements for new acquisitions. Specific definitions of each of these four metrics are contained in the memorandum, as well as fourteen "Life Cycle Sustainment Enablers”.

Life Cycle Sustainment Plan (DoDI 5000.02) is new requirement within the Acquisition Strategy to document sustainment requirements throughout the life cycle and to ensure their consideration “up-front” in the acquisition process. The LCSP is required at Milestone B and Milestone C, as well as at the Full-Rate Production Design Review. This replaced the System Sustainment Plan, also a new DoDI 5000.02 requirement, and supports Milestone B.

Defense Acquisition Guidebook Chapter 5, Life Cycle Logistics, provides an overview of key LCL activities and outputs in the context of the Defense Acquisition Management Framework, to help program managers effectively implement LCL, Total Life Cycle Systems Management (TLCSM), and Performance-Based Logistics (PBL).

Defense Acquisition Guidebook Chapter 5.1.3.7, Life Cycle Assessment, discusses the continuance of operational support plans and the use of existing reporting systems to evaluate fielded sustainment related performance.

Best Practices, Lessons Learned, Stories, Guides, Handbooks, Templates, Example Tools, Communities of Practice, LEC Tools

PowerLOG provides the baseline system configuration and expected logistical data information.  The Maintenance Summary (LSA-003), Provisioning Technical Documentation Report (LSA-036), and the Preventive Maintenance Checks and Services report (LSA-033) can all support this task by providing the as-designed data.  PowerLOG is a logistics data management system developed to support the development, integration, and review of logistic product information throughout the acquisition life cycle.  PowerLOG implements the Logistics Support Analysis Record (LSAR) requirements defined in MIL-STD-1388-2B as well as Logistics Product Data defined by GEIA-STD-0007.  PowerLOG is available free to all Government agencies and their contractors and can be obtained by visiting:  https://www.logsa.army.mil/lec/powerlog/.

The Computerized Optimization Model for Predicting and Analyzing Support Structures (COMPASS) is a system Level of Repair Analysis (LORA) modeling tool.  LORA is the analytical methodology used to determine the maintenance repair levels where items should be removed and replaced; and ultimately repaired or discarded.  COMPASS estimates the cost to repair or discard items at various maintenance levels, with contractor facilities included as a separate level.   COMPASS optimizes both the maintenance and support to achieve your target operational availability (Ao).  COMPASS can consider up to four levels of organic maintenance (supports Two-Level Maintenance studies), supply support, and contractor support.  You can also use COMPASS output data as a source for developing the MAC and SMR codes.  COMPASS is a free tool available to both DoD and contractors at: https://www.logsa.army.mil/lec/compass/

Post Fielding Support Analysis (PFSA) can be useful in accomplishing the tasks discussed in this article.  PFSA uses data captured in field performance databases such as the Logistics Information Warehouse, acquisition databases, and other user-owned data sources.  PFSA assists users by using statistical methods for tracking logistics throughout the life cycle.  This data is used to create an analysis capability for Army PEO/PMs, LCMCs and field organizations to better manage and solve logistics based readiness problems.  PFSA is a free tool offered to the Army and can be obtained by visiting: https://www.logsa.army.mil/lec/pfsa

DAU Continuous Learning Module CLL 020, Independent Logistics Assessment, presents an introduction to Independent Logistics Assessments (ILA), which is a formal review of the state of a program's logistics planning and documentation – a review that occurs before Milestone B, before Milestone C, and before full rate production (FRP). ILA checklists, handbooks, and references can also be used to assist in early logistics, support, and sustainment planning, including Milestone A. The module is intended for members of the logistics workforce who:       • Will support the conduct of an ILA as a member of an assessment team, or

                • Serve as the logistician primarily responsible for preparing the acquisition team and developing                                     necessary documents in advance of an ILA.

The DLA Life Cycle Logistics Independent Logistics Assessment (ILA) Guidebook guides DLA Weapon System Support Managers (WSSMs), Weapons System Program Managers (WSPMs) and other DLA lead Program Manager (PM) Program Executive Office (PEO)/customer representative engagement with the Services' Life Cycle Logistics management process.

The Air Force Independent Logistics Assessment (ILA) Handbook Version 1.0, outlines the step-by-step process and offers extensive program evaluation criteria that can be used to conduct formal assessments of a program's product support planning and implementation. It includes information to help assessors focus on metrics and documentation most relevant to logistics planning and performance-based logistics (PBL) arrangements.

Army Independent Logistics Assessment (ILA) Checklist provides a comprehensive Army checklist for conducting Independent Logistics (Logistician's) Assessment (ILA).

Navy NAVSO P-3692 Independent Logistics Assessment Handbook, DTD Sep 06 is the Navy’s standard for continuing assessment of logistics.

COMMUNITIES OF PRACTICE

The Life Cycle Logistics Community of Practice contains a comprehensive discussion of the Integrated Logistics Assessment (ILA) Independent Logistics Assessments (ILA) [ACC] as a part of the Sustainment process.

Training Resources

Rapid Deployment Training describes statutory and regulatory updates to DoDI 5000.02

Defense Acquisition University (DAU) Catalog of Courses (iCatalog)

DAU Resident Courses

LOG 201B, Intermediate Acquisition Logistics

LOG 236, Performance Based Logistics

LOG 350 Enterprise Life Cycle Logistics Management

DAU Distance Learning Courses

LOG 101, Acquisition Logistics Fundamentals

LOG 102, Systems Sustainment Management Fundamentals

LOG 200, Intermediate Acquisition Logistics

LOG 203, Reliability and Maintainability

LOG 204, Configuration Management

LOG 235, Performance Based Logistics

SYS 202, Intermediate Systems Planning, Research, Development and Engineering

DAU Continuous Learning Modules

CLL015 Business Case Analysis

CLL029 Condition Based Maintenance Plus (CBM+)

CLL002 Defense Logistics Agency Support To The PM

CLL026 Depot Maintenance Capacity Measurement

CLL025 Depot Maintenance Interservice Support Agreement

CLL006 Depot Maintenance Partnering

CLL008 Designing for Supportability in DoD Systems

CLL204 Diminishing Manufacturing Sources and Material Shortages Case Studies

CLL203 Diminishing Manufacturing Sources and Material Shortages Essentials

CLL202 Diminishing Manufacturing Sources and Material Shortages Executive Overview

CLL201 Diminishing Manufacturing Sources and Material Shortages Fundamentals

CLL205 Diminishing Manufacturing Sources and Material Shortages for Technical Professionals

CLL013 DoD Packaging

CLL020 Independent Logistics Assessments

CLL017 Introduction to Defense Distribution

CLL016 Joint Logistics

CLL014 Joint Systems Integrated Support Strategies (JSISS)

CLL004 Life Cycle Logistics For The Rest Of Us

CLL206 Parts Management Executive Overview

CLL011 Performance Based Logistics (PBL)

CLL030 Reliability Centered Maintenance (RCM)

CLL034 SLAMIS

CLL119 Technical Refreshment Implementation Module

CLL019 Technology Refreshment Planning

CLL022 Title 10 Depot Maintenance Statute Overview (Statutory Framework)

CLL024 Title 10 Limitations on the Performance of Depot-level Maintenance (50/50)

CLL023 Title 10 U.S.C. 2464 Core Statute Implementation

Related Articles

Required for:

Responsible Activity:

List of All Contributions at This Location

No items found.

Popular Tags

Page Information

At this page:
5906 Page Views 0 Pages Emailed
0 Meta-card Views 0 Documents and Videos
0 Questions 0 Attachments Downloaded
0 Answers 0 Videos downloaded
0 Relationships and Highlights
ID280398
Date CreatedFriday, April 24, 2009 3:17 PM
Date ModifiedMonday, May 21, 2012 4:33 PM
Version Comment:

Sign In

Login with your CAC

Insert your CAC now, and click this button.


Login with your Password

User Name:

Password:

Forgot your password?

  

Benefits of ACC Membership


Browse

https://acc.dau.mil/UI/img/bo/minus.gifIntegrated Logistic Support and Logistic...
https://acc.dau.mil/UI/img/bo/plus.gif Materiel Development Decision ...
https://acc.dau.mil/UI/img/bo/plus.gifAcquisition Decision Memorandum
https://acc.dau.mil/UI/img/bo/plus.gifAcquisition Decision Memorandum - Phase...
https://acc.dau.mil/UI/img/bo/plus.gifAcquisition Program Baseline
https://acc.dau.mil/UI/img/bo/plus.gifAcquisition Strategy
https://acc.dau.mil/UI/img/bo/plus.gifAffordability Assessment
https://acc.dau.mil/UI/img/bo/plus.gifAffordability Assessment - Phase 3
https://acc.dau.mil/UI/img/bo/plus.gifAllocated Baseline
https://acc.dau.mil/UI/img/bo/plus.gifAnalysis of Alternatives (AoA) - Phase 1
https://acc.dau.mil/UI/img/bo/plus.gifAnalysis of Alternatives (AoA) - Phase 3
https://acc.dau.mil/UI/img/bo/plus.gifApprove & Develop Test Equipment and...
https://acc.dau.mil/UI/img/bo/plus.gifAssess Support Needs
https://acc.dau.mil/UI/img/bo/plus.gifAssign ILS Manager
https://acc.dau.mil/UI/img/bo/plus.gifAssign Product Support Integrator
https://acc.dau.mil/UI/img/bo/plus.gifAssign TRADOC Capabilities Manager (TSM)
https://acc.dau.mil/UI/img/bo/plus.gifBasis of Issue Plan
https://acc.dau.mil/UI/img/bo/plus.gifBasis of Issue Plan Feeder Data
https://acc.dau.mil/UI/img/bo/plus.gifCapability Development Document
https://acc.dau.mil/UI/img/bo/plus.gifCapability Production Document
https://acc.dau.mil/UI/img/bo/plus.gifComparative Analysis 1
https://acc.dau.mil/UI/img/bo/plus.gifComparative Analysis 2
https://acc.dau.mil/UI/img/bo/plus.gifComputer Resources Concept
https://acc.dau.mil/UI/img/bo/plus.gifComputer Resources Life Cycle Management...
https://acc.dau.mil/UI/img/bo/plus.gifComputer Resources Support
https://acc.dau.mil/UI/img/bo/plus.gifContinuous Technology
https://acc.dau.mil/UI/img/bo/plus.gifCore Depot Assessment
https://acc.dau.mil/UI/img/bo/plus.gifCore Logistics Analysis
https://acc.dau.mil/UI/img/bo/plus.gifCost Analysis
https://acc.dau.mil/UI/img/bo/plus.gifCost As Independent Variable - Phase 2
https://acc.dau.mil/UI/img/bo/plus.gifCost As Independent Variable - Phase 3
https://acc.dau.mil/UI/img/bo/plus.gifCritical Design Review
https://acc.dau.mil/UI/img/bo/plus.gifDA Authenticated Equipment Publications
https://acc.dau.mil/UI/img/bo/plus.gifDemilitarization Disposal Operations...
https://acc.dau.mil/UI/img/bo/plus.gifDemilitarization/Disposal
https://acc.dau.mil/UI/img/bo/plus.gifDepot Maintenance Weapon System Support...
https://acc.dau.mil/UI/img/bo/plus.gifDepot Maintenance Capability
https://acc.dau.mil/UI/img/bo/plus.gifDepot Maintenance Support Plan
https://acc.dau.mil/UI/img/bo/plus.gifDepot Test Equipment
https://acc.dau.mil/UI/img/bo/plus.gifDesign Influence
https://acc.dau.mil/UI/img/bo/plus.gifDesign Product Support Package
https://acc.dau.mil/UI/img/bo/plus.gifDesign Tradeoffs / ILS Tradeoffs ...
https://acc.dau.mil/UI/img/bo/plus.gifDevelop and Test Product Support Package
https://acc.dau.mil/UI/img/bo/plus.gifDevelop Modified Table of Organization &...
https://acc.dau.mil/UI/img/bo/plus.gifDiagnostics and Prognostics...
https://acc.dau.mil/UI/img/bo/plus.gifDisposal Implementation
https://acc.dau.mil/UI/img/bo/plus.gifDisposal Plan
https://acc.dau.mil/UI/img/bo/plus.gifDMSMS Plan
https://acc.dau.mil/UI/img/bo/plus.gifDraft Depot Maintenance Work...
https://acc.dau.mil/UI/img/bo/plus.gifDraft Maintenance Allocation Chart (MAC)...
https://acc.dau.mil/UI/img/bo/plus.gifEarly Fielding Analysis
https://acc.dau.mil/UI/img/bo/plus.gifEngineering and Manufacturing...
https://acc.dau.mil/UI/img/bo/plus.gifEngineering Change Proposals
https://acc.dau.mil/UI/img/bo/plus.gifEngineering for Transportability
https://acc.dau.mil/UI/img/bo/plus.gifEquipment Distribution Plan
https://acc.dau.mil/UI/img/bo/plus.gifEquipment Publications Concept
https://acc.dau.mil/UI/img/bo/plus.gifEquipment Publications Input to...
https://acc.dau.mil/UI/img/bo/plus.gifEstablish ILS Management Program
https://acc.dau.mil/UI/img/bo/plus.gifEstablish Integrated Concept Team
https://acc.dau.mil/UI/img/bo/plus.gifEstablish Maintenance Concept
https://acc.dau.mil/UI/img/bo/plus.gifEstablish Sustainment Requirements and...
https://acc.dau.mil/UI/img/bo/plus.gifExit Documents and Products
https://acc.dau.mil/UI/img/bo/plus.gifFacilities
https://acc.dau.mil/UI/img/bo/plus.gifFailure Modes Effects and Criticality...
https://acc.dau.mil/UI/img/bo/plus.gifFailure Modes Effects and Criticality...
https://acc.dau.mil/UI/img/bo/plus.gifFault Tree Analysis
https://acc.dau.mil/UI/img/bo/plus.gifField Data Through STAMIS
https://acc.dau.mil/UI/img/bo/plus.gifFinal MAC
https://acc.dau.mil/UI/img/bo/plus.gifFinal Reproducible Copy
https://acc.dau.mil/UI/img/bo/plus.gifFull Rate Production
https://acc.dau.mil/UI/img/bo/plus.gifFunctional Configuration Audit
https://acc.dau.mil/UI/img/bo/plus.gifFunctional Requirements - Phase 2
https://acc.dau.mil/UI/img/bo/plus.gifFunctional Requirements - Phase 3
https://acc.dau.mil/UI/img/bo/plus.gifGovernment-Furnished Equipment (GFE) ...
https://acc.dau.mil/UI/img/bo/plus.gifHandling and Storage Capability
https://acc.dau.mil/UI/img/bo/plus.gifHandling Equipment Considerations
https://acc.dau.mil/UI/img/bo/plus.gifHazardous Material Handling Requirements...
https://acc.dau.mil/UI/img/bo/plus.gifILS Program Metrics
https://acc.dau.mil/UI/img/bo/plus.gifImplement and Deploy Sustainment...
https://acc.dau.mil/UI/img/bo/plus.gifIndependent Logistics Assessment
https://acc.dau.mil/UI/img/bo/plus.gifInitial Business Case Analysis
https://acc.dau.mil/UI/img/bo/plus.gifInitial Capabilities Document
https://acc.dau.mil/UI/img/bo/plus.gifInitial Configuration Management Plan
https://acc.dau.mil/UI/img/bo/plus.gifInitial Functional Requirements Analysis...
https://acc.dau.mil/UI/img/bo/plus.gifInitial Maintenance Plan
https://acc.dau.mil/UI/img/bo/plus.gifInitial Operational Capability (IOC)
https://acc.dau.mil/UI/img/bo/plus.gifInitial Supportability Strategy
https://acc.dau.mil/UI/img/bo/plus.gifInitial System Engineering Plan
https://acc.dau.mil/UI/img/bo/plus.gifInitial Technical Review
https://acc.dau.mil/UI/img/bo/plus.gifInitiate Logistics Management...
https://acc.dau.mil/UI/img/bo/plus.gifInitiate PBL Activities
https://acc.dau.mil/UI/img/bo/plus.gifInitiate Supportability Analysis
https://acc.dau.mil/UI/img/bo/plus.gifIntegrated Baseline Review
https://acc.dau.mil/UI/img/bo/plus.gifIntegrated Logistics Support (ILS) ...
https://acc.dau.mil/UI/img/bo/plus.gifIntegrated Logistics Support Manager
https://acc.dau.mil/UI/img/bo/plus.gifItem Unique Identification Plan
https://acc.dau.mil/UI/img/bo/plus.gifLevel of Repair Analysis - Phase 2
https://acc.dau.mil/UI/img/bo/plus.gifLevel of Repair Analysis - Phase 3
https://acc.dau.mil/UI/img/bo/plus.gifLife Cycle Cost Analysis
https://acc.dau.mil/UI/img/bo/plus.gifLogistics Demonstration -
https://acc.dau.mil/UI/img/bo/plus.gifLogistics Demonstration Report
https://acc.dau.mil/UI/img/bo/plus.gifLogistics Inputs to Capabilities...
https://acc.dau.mil/UI/img/bo/plus.gifLogistics Inputs to TEMP
https://acc.dau.mil/UI/img/bo/plus.gifLogistics Support Considerations
https://acc.dau.mil/UI/img/bo/plus.gifLow Rate Initial Production (LRIP)
https://acc.dau.mil/UI/img/bo/plus.gifMaintain Equipment Publications/Update...
https://acc.dau.mil/UI/img/bo/plus.gifMaintenance Labor Requirements
https://acc.dau.mil/UI/img/bo/plus.gifMaintenance Operations
https://acc.dau.mil/UI/img/bo/plus.gifMaintenance Planning
https://acc.dau.mil/UI/img/bo/plus.gifManpower and Personnel Integration
https://acc.dau.mil/UI/img/bo/plus.gifManpower Requirements Criteria
https://acc.dau.mil/UI/img/bo/plus.gifMANPRINT Validation
https://acc.dau.mil/UI/img/bo/plus.gifMarket Research & Investigation - Phase...
https://acc.dau.mil/UI/img/bo/plus.gifMarket Research & Investigation - Phase...
https://acc.dau.mil/UI/img/bo/plus.gifMaterial Fielding Team Report
https://acc.dau.mil/UI/img/bo/plus.gifMaterial Solution Analysis Phase
https://acc.dau.mil/UI/img/bo/plus.gifMaterial Transfer Plan
https://acc.dau.mil/UI/img/bo/plus.gifMateriel Condition Status Report
https://acc.dau.mil/UI/img/bo/plus.gifMateriel Fielding Plan -
https://acc.dau.mil/UI/img/bo/plus.gifMateriel Release -
https://acc.dau.mil/UI/img/bo/plus.gifMateriel Release Approval
https://acc.dau.mil/UI/img/bo/plus.gifMateriel Solution Analysis Phase
https://acc.dau.mil/UI/img/bo/plus.gifMilestone A
https://acc.dau.mil/UI/img/bo/plus.gifMilestone B
https://acc.dau.mil/UI/img/bo/plus.gifMilestone C
https://acc.dau.mil/UI/img/bo/plus.gifMission Support Plan
https://acc.dau.mil/UI/img/bo/plus.gifModernization Through Spares
https://acc.dau.mil/UI/img/bo/plus.gifModernization Through Spares
https://acc.dau.mil/UI/img/bo/plus.gifModification Work Orders
https://acc.dau.mil/UI/img/bo/plus.gifModification Work Orders
https://acc.dau.mil/UI/img/bo/plus.gifMonitor PBL Metrics
https://acc.dau.mil/UI/img/bo/plus.gifNew Equipment Training
https://acc.dau.mil/UI/img/bo/plus.gifNew Equipment Training Plan
https://acc.dau.mil/UI/img/bo/plus.gifNew/Revised Equipment Publications
https://acc.dau.mil/UI/img/bo/plus.gifOperational Test Readiness Review
https://acc.dau.mil/UI/img/bo/plus.gifOperations and Support Phase
https://acc.dau.mil/UI/img/bo/plus.gifPackaging Handling Storage and...
https://acc.dau.mil/UI/img/bo/plus.gifPackaging Handling Storage and...
https://acc.dau.mil/UI/img/bo/plus.gifPackaging, Handling, Storage, and...
https://acc.dau.mil/UI/img/bo/plus.gifPackaging, Handling, Storage, and...
https://acc.dau.mil/UI/img/bo/plus.gifPackaging,Handling, Storage &...
https://acc.dau.mil/UI/img/bo/plus.gifPerformance Based Logistics Support
https://acc.dau.mil/UI/img/bo/plus.gifPerformance Metrics
https://acc.dau.mil/UI/img/bo/plus.gifPerformance-Based Agreements
https://acc.dau.mil/UI/img/bo/plus.gifPerformance-Based Support
https://acc.dau.mil/UI/img/bo/plus.gifPhysical Configuration Audit
https://acc.dau.mil/UI/img/bo/plus.gifPlan Equipment Publications
https://acc.dau.mil/UI/img/bo/plus.gifPlan for Personnel
https://acc.dau.mil/UI/img/bo/plus.gifPlan Repair Parts
https://acc.dau.mil/UI/img/bo/plus.gifPlan Technical Data
https://acc.dau.mil/UI/img/bo/plus.gifPlan Training Systems
https://acc.dau.mil/UI/img/bo/plus.gifPost Deployment Software Support
https://acc.dau.mil/UI/img/bo/minus.gifPost Fielding Reviews
https://acc.dau.mil/UI/img/bo/plus.gifPost Production Support Analysis - Phase...
https://acc.dau.mil/UI/img/bo/plus.gifPost Production Support Analysis - Phase...
https://acc.dau.mil/UI/img/bo/plus.gifPost-Production Support Plan
https://acc.dau.mil/UI/img/bo/plus.gifPreferred System Concept
https://acc.dau.mil/UI/img/bo/plus.gifPreliminary Design Review
https://acc.dau.mil/UI/img/bo/plus.gifPreliminary System Specification
https://acc.dau.mil/UI/img/bo/plus.gifPre-Planned Product Improvement
https://acc.dau.mil/UI/img/bo/plus.gifProduce Preliminary Technical Manuals
https://acc.dau.mil/UI/img/bo/plus.gifProducibility Engineering Plan
https://acc.dau.mil/UI/img/bo/plus.gifProduct Baseline
https://acc.dau.mil/UI/img/bo/plus.gifProduction and Deployment Phase
https://acc.dau.mil/UI/img/bo/plus.gifProduction Readiness Review
https://acc.dau.mil/UI/img/bo/plus.gifProgram Facility Funds
https://acc.dau.mil/UI/img/bo/plus.gifProgram Management Activities
https://acc.dau.mil/UI/img/bo/plus.gifProvisioning Data
https://acc.dau.mil/UI/img/bo/plus.gifProvisioning Plan
https://acc.dau.mil/UI/img/bo/plus.gifProvisioning Screening
https://acc.dau.mil/UI/img/bo/plus.gifProvisioning Technical Documentation...
https://acc.dau.mil/UI/img/bo/plus.gifPublish DMWR / NMWR
https://acc.dau.mil/UI/img/bo/plus.gifPublish Modification Work Orders
https://acc.dau.mil/UI/img/bo/plus.gifRefine Task Analysis
https://acc.dau.mil/UI/img/bo/plus.gifReliability Centered Maintenance (RCM)...
https://acc.dau.mil/UI/img/bo/plus.gifReliability Centered Maintenance...
https://acc.dau.mil/UI/img/bo/plus.gifReliability Enhancement
https://acc.dau.mil/UI/img/bo/plus.gifReliability-Centered Maintenance...
https://acc.dau.mil/UI/img/bo/plus.gifRemove Obsolete NSNs
https://acc.dau.mil/UI/img/bo/plus.gifRepair Parts and Special Tools List
https://acc.dau.mil/UI/img/bo/plus.gifRepair Parts Concept
https://acc.dau.mil/UI/img/bo/plus.gifRescind Equipment Publications
https://acc.dau.mil/UI/img/bo/plus.gifResident/OJT Training Requirements
https://acc.dau.mil/UI/img/bo/plus.gifRevise PHS&T Guidance
https://acc.dau.mil/UI/img/bo/plus.gifRevise Training Program
https://acc.dau.mil/UI/img/bo/plus.gifSample Data Collection
https://acc.dau.mil/UI/img/bo/plus.gifSchedule Equipment Publications
https://acc.dau.mil/UI/img/bo/plus.gifSecurity Requirements
https://acc.dau.mil/UI/img/bo/plus.gifSelection and Allocation of Repair Parts
https://acc.dau.mil/UI/img/bo/plus.gifSensitivity Analysis
https://acc.dau.mil/UI/img/bo/plus.gifSet System Readiness Objectives (SRO)...
https://acc.dau.mil/UI/img/bo/plus.gifShelf Life
https://acc.dau.mil/UI/img/bo/plus.gifSkills
https://acc.dau.mil/UI/img/bo/plus.gifSoftware Support
https://acc.dau.mil/UI/img/bo/plus.gifSolicitation Documents
https://acc.dau.mil/UI/img/bo/plus.gifSupply Support
https://acc.dau.mil/UI/img/bo/plus.gifSupport Equipment
https://acc.dau.mil/UI/img/bo/plus.gifSupport Facilities 1
https://acc.dau.mil/UI/img/bo/plus.gifSupport Facilities 2
https://acc.dau.mil/UI/img/bo/plus.gifSupport Facilities Annex
https://acc.dau.mil/UI/img/bo/plus.gifSupport Facilities Concept
https://acc.dau.mil/UI/img/bo/plus.gifSupport for Test Equipment and Tools
https://acc.dau.mil/UI/img/bo/plus.gifSupport System Standardization...
https://acc.dau.mil/UI/img/bo/plus.gifSupport System Standardization...
https://acc.dau.mil/UI/img/bo/plus.gifSupport System Tradeoff Analysis
https://acc.dau.mil/UI/img/bo/plus.gifSupportability Analysis
https://acc.dau.mil/UI/img/bo/plus.gifSupportability Assessment - Phase 2
https://acc.dau.mil/UI/img/bo/plus.gifSupportability Assessment - Phase 3
https://acc.dau.mil/UI/img/bo/plus.gifSupportability Integrated Product Team
https://acc.dau.mil/UI/img/bo/plus.gifSupportability Strategy -
https://acc.dau.mil/UI/img/bo/plus.gifSupportability Test, Evaluation, and...
https://acc.dau.mil/UI/img/bo/plus.gifSustain the System to Achieve Materiel...
https://acc.dau.mil/UI/img/bo/plus.gifSustainment Metrics
https://acc.dau.mil/UI/img/bo/plus.gifSustainment Readiness Review
https://acc.dau.mil/UI/img/bo/plus.gifSystem Concept Review
https://acc.dau.mil/UI/img/bo/plus.gifSystem Engineering Activities
https://acc.dau.mil/UI/img/bo/plus.gifSystem Functional Baseline
https://acc.dau.mil/UI/img/bo/plus.gifSystem Functional Review
https://acc.dau.mil/UI/img/bo/plus.gifSystem MANPRINT Management Plan
https://acc.dau.mil/UI/img/bo/plus.gifSystem Performance Specification
https://acc.dau.mil/UI/img/bo/plus.gifSystem Requirements Review
https://acc.dau.mil/UI/img/bo/plus.gifSystem Specification
https://acc.dau.mil/UI/img/bo/plus.gifSystem Support Package
https://acc.dau.mil/UI/img/bo/plus.gifSystem Training Plan
https://acc.dau.mil/UI/img/bo/plus.gifSystem Verification Review
https://acc.dau.mil/UI/img/bo/plus.gifTarget Audience Description
https://acc.dau.mil/UI/img/bo/plus.gifTask Analysis -
https://acc.dau.mil/UI/img/bo/plus.gifTechnical Baseline
https://acc.dau.mil/UI/img/bo/plus.gifTechnical Data
https://acc.dau.mil/UI/img/bo/plus.gifTechnical Manual Verification Plan
https://acc.dau.mil/UI/img/bo/plus.gifTechnical Reviews
https://acc.dau.mil/UI/img/bo/plus.gifTechnology Development Phase
https://acc.dau.mil/UI/img/bo/plus.gifTechnology Development Strategy
https://acc.dau.mil/UI/img/bo/plus.gifTechnology Refreshment Program
https://acc.dau.mil/UI/img/bo/plus.gifTechnology Risk Reduction Assessment
https://acc.dau.mil/UI/img/bo/plus.gifTest and Evaluation Master Plan -
https://acc.dau.mil/UI/img/bo/plus.gifTest Equipment and Tool Concept
https://acc.dau.mil/UI/img/bo/plus.gifTest Equipment and Tools
https://acc.dau.mil/UI/img/bo/plus.gifTest Program Sets
https://acc.dau.mil/UI/img/bo/plus.gifTest Readiness Review
https://acc.dau.mil/UI/img/bo/plus.gifTotal Package Fielding
https://acc.dau.mil/UI/img/bo/plus.gifTrained Personnel
https://acc.dau.mil/UI/img/bo/plus.gifTraining — Program of Instruction
https://acc.dau.mil/UI/img/bo/plus.gifTraining and Training Support
https://acc.dau.mil/UI/img/bo/plus.gifTraining Concept
https://acc.dau.mil/UI/img/bo/plus.gifTraining for Test
https://acc.dau.mil/UI/img/bo/plus.gifTraining Materials Determination
https://acc.dau.mil/UI/img/bo/plus.gifTransportability Report
https://acc.dau.mil/UI/img/bo/plus.gifType Classification
https://acc.dau.mil/UI/img/bo/plus.gifType II Business Case Analysis
https://acc.dau.mil/UI/img/bo/plus.gifUpdate Analysis of Alternatives
https://acc.dau.mil/UI/img/bo/plus.gifUpdate Computer Resource Management Plan
https://acc.dau.mil/UI/img/bo/plus.gifUpdate Disposal Plan
https://acc.dau.mil/UI/img/bo/plus.gifUpdate Item Unique Identification (IUID)...
https://acc.dau.mil/UI/img/bo/plus.gifUpdate Life Cycle Sustainment Plan (...
https://acc.dau.mil/UI/img/bo/plus.gifUpdate Market Research
https://acc.dau.mil/UI/img/bo/plus.gifUpdate Materiel Fielding Plan
https://acc.dau.mil/UI/img/bo/plus.gifUpdate Modification Table of...
https://acc.dau.mil/UI/img/bo/plus.gifUpdate National Stock Numbers (NSN)
https://acc.dau.mil/UI/img/bo/plus.gifUpdate Provisioning Data
https://acc.dau.mil/UI/img/bo/plus.gifUpdate System Training Plan (STRAP)
https://acc.dau.mil/UI/img/bo/plus.gifUpdate Systems Engineering Plan -...
https://acc.dau.mil/UI/img/bo/plus.gifUpdate Systems Engineering Plan -...
https://acc.dau.mil/UI/img/bo/plus.gifUpdate TEMP
https://acc.dau.mil/UI/img/bo/plus.gifUpdate TO&E
https://acc.dau.mil/UI/img/bo/plus.gifUpdate Transportability Report
https://acc.dau.mil/UI/img/bo/plus.gifUse Study
https://acc.dau.mil/UI/img/bo/plus.gifValidate Computer Support
https://acc.dau.mil/UI/img/bo/plus.gifValidate Facility Requirements
https://acc.dau.mil/UI/img/bo/plus.gifValidate MAC
https://acc.dau.mil/UI/img/bo/plus.gifValidate MANPRINT
https://acc.dau.mil/UI/img/bo/plus.gifValidate Packaging Handling Storage &...
https://acc.dau.mil/UI/img/bo/plus.gifValidate Preliminary Technical Manuals
https://acc.dau.mil/UI/img/bo/plus.gifValidate RCM
https://acc.dau.mil/UI/img/bo/plus.gifValidate Repair Parts
https://acc.dau.mil/UI/img/bo/plus.gifValidate Training Systems
https://acc.dau.mil/UI/img/bo/plus.gifVerify DMWR/NMWR
https://acc.dau.mil/UI/img/bo/plus.gifVerify Equipment Publications
https://acc.dau.mil/UI/img/bo/plus.gifWarranties Program
ACC Practice Center Version 3.2
  • Application Build 3.2.8
  • Database Version 3.2.8