2013
- February 13, 2013, Department letter transmitting deliverable 2a-1 (Transient Combustible Control Program Description for Building 235-F) of the Department of Energy's Implementation Plan for Recommendation 2012-1, Savannah River Site Building 235-F Safety. [PDF]
- February 11, 2013, Department letter transmitting the report "Independent Oversight Assessment of Nuclear Safety Culture at the Salt Waste Processing Facility Project", in completing Action 2-6 in the Department of Energy's Implementation Plan for Recommendation 2011-1, Safety Culture at the Waste Treatment and Immobilization Plant. [PDF]
|
- January 31, 2013, Department letter transmitting deliverable 3-1 (Emergency Preparedness drill schedule for Calendar Year 2013) of the Implementation Plan for Recommendation 2012-1, Savannah River Site Building 235-F Safety. [PDF]
- January 31, 2013, Department letter in response to the Board letter of August 30, 2012, concerning the adequacy of the development, review, and approval of safety control strategies for nuclear operations at Lawrence Livermore National Laboratory. [PDF]
- January 16, 2013, Department letter responding to the Board letter of November 19, 2012, concerning the nuclear facility safety basis for Area G at Los Alamos National Laboratory. [PDF]
- January 16, 2013, Department letter requesting a 30-day extension to transmit the Department’s Annual Report on Nuclear Criticality Safety for Fiscal Year 2012.
[PDF]
- January 7, 2013, Department letter accepting Board Recommendation 2012-2, Hanford Tank Farms Flammable Gas Safety Strategy. [PDF]
- January 3, 2013, Board letter forwarding Technical Report DNFSB/TECH-38, Storage Conditions of Reactive Metal Fuel in L-Basin at the Savannah River Site. [PDF]
- January 3, 2013, Department letter transmitting the Technical Work Plan and Project Plan of DOE’s project to develop verification and validation test problems and solutions for the System for Analysis of Soil-Structure Interaction (SASSI) computer code. [PDF]
- January 3, 2013, Board letter establishing a 60-day reporting requirement for DOE senior leadership’s assessment of the current state of public and worker protection for seismic accident scenarios, and the risk reduction measures to be applied to mitigate near term seismic risks of the Plutonium Facility (PF-4) at Los Alamos National Laboratory.
[PDF]
|
|
|