Active Renewable Energy Projects
The Bureau of Land Management continues its work on environmentally responsible development of utility-scale renewable energy projects on public lands as part of the Administration's efforts to diversify the Nation's energy portfolio.
The BLM is currently processing 23 renewable energy projects (14 solar, 6 wind, and 3 geothermal) representing about 5,300 MW. The BLM identified these projects for processing through collaboration that emphasizes early consultation with the Bureau of Indian Affairs, the U.S. Fish and Wildlife Service, the National Park Service, and, in the case of geothermal projects on forest lands, with the U.S. Forest Service. The projects were selected based on the screening criteria outlined in BLM policy memoranda issued in February 2011. In addition, the BLM considered the progress of each project in terms of the necessary public participation and environmental analysis under NEPA and applicable state environmental laws. Based on this consideration of progress, and best information from project proponents, the BLM and the BIA anticipate that the projects on the list may reach a decision point within the next 24 months. The BLM and the BIA intend to update the Active Renewable Energy Projects list as new projects that meet the standards above are proposed.
The table below indicates the locations and other details regarding the BLM's active renewable energy projects. It also shows project status relative to landscape-level plans, like the Solar Energy Programmatic Environmental Impact Statement (Solar PEIS). Links are given to related BLM and state web pages, as well as Federal Register notices. Rows shaded in light blue denote projects on private and/or Tribal land -- "connected-action projects" -- that will require BLM authorizations for transmission, access, and other off-site facilities.
Related link:
EA = Environmental Assessment | NOI = Notice of Intent |
EIS = Environmental Impact Statement | ROD = Record of Decision |
FONSI = Finding of No Significant Impact | SEZ = Solar Energy Zone (Solar Programmatic EIS) |
Solar Energy Projects
State | Project Name [Applicant] (County) | Technology | Potential Output (MW) a | BLM Acreage | Status b |
AZ | Hyder Valley Solar (map) [Pacific Solar Investments] (Maricopa) | CSP - Parabolic Trough | 350 | 4,500 | NOI published 5/20/10 Draft EIS pending |
AZ | | CSP - Power Tower | 100 | 1,675 | NOI published 1/14/10 Draft EIS released 11/10/11 Final EIS released 12/21/12 Decision pending Land Use Plan Amendment |
CA | | PV | 300 | 2,143 | NOI published 8/4/11 Draft EIS released 11/23/11 Final EIS pending Land Use Plan Amendment |
CA | | PV | 750 | 7,700 | NOI published 8/29/11 Draft EIS released 5/25/12 Final EIS released 12/21/2012 Decision pending (Riverside East SEZ) Land Use Plan Amendment |
CA | Desert Harvest Solar (map) [EDF-Renewable (EnXco)] (Riverside) | PV | 150 | 1,208 | NOI published 9/15/11 Draft EIS released 4/13/12 Final EIS released 11/2/12 Decision pending (Riverside East SEZ) Land Use Plan Amendment |
CA | Ocotillo Sol (map) [San Diego Gas & Electric] (Imperial) | PV | 14 | 115 | NOI published 7/17/11 Draft EIS released 4/20/12 Final EIS pending Land Use Plan Amendment |
CA | Ft Mojave Solar (BIA) (map) [First Solar] (San Bernardino) | PV | 310 | -- c | NOI pending |
CA | Silverleaf Solar (map) [Tenaska (Silverleaf Solar)] (Imperial) | PV | 160 | -- c | EA pending |
CA | Blythe Mesa Solar (map) [Renewable Resources Group] (Riverside) | PV | 485 | -- c | EA pending |
CA/NV | Hidden Hills Solar (map) [BrightSource] (Inyo, CA / Clark, NV) | CSP - Power Tower | 500 | -- c | NOI published 10/11/11 Draft EIS pending |
NV | Silver State South Solar (map) [First Solar] (Clark) | PV | 350 | 2,290 | NOI published 9/1/11 Draft EIS pending Land Use Plan Amendment |
NV | Boulder City Solar (map) [Techren] (Clark) | PV | 300 | -- c | EA completed Decision pending |
NV | Mountain View Solar (map) [NextEra] (Clark) | PV | 20 | -- c | EA pending |
NV | Moapa Solar (BIA) (map) [RES America] (Clark) | PV/CSP | 200 | | NOI published 8/6/12 Draft EIS pending |
a Rated total output capacity. Potential output may change depending on the analysis and review of each project.
b All listed active solar projects, including those located within a Solar Energy Zone (SEZ), predate the Solar EIS.
c Projects on private/Tribal land: denotes "connected action" projects that will require BLM authorizations for transmission, access, and other off-site facilities.
Wind Energy Projects
State | Project Name [Applicant] (County / Counties) | Potential Output (MW) a | BLM Acreage | Status |
AZ | Mohave County Wind Farm (map) [BP Wind Energy] (Mohave) | 500 | 38,099 | NOI published 7/26/10 Draft EIS released 4/27/12 Final EIS pending |
CA | Granite Mountain Wind (map) [Granite Wind (RES America)] (San Bernardino) | 84 | 2,086 | NOI published 8/13/10 Draft EIS pending Land Use Plan Amendment |
CA | Walker Ridge Wind (map) [AltaGas Renewable Energy] (Lake and Colusa) | 70 | 7,882 | NOI published 8/13/2010 Draft EIS pending |
CA | Alta East Wind (map) [Alta WindPower] (Kern) | 300 | 2,024 | NOI published 7/15/11 Draft EIS released 6/29/12 Final EIS released 2/15/13 Land Use Plan Amendment |
CA | Tule Wind (BIA) (map) [Iberdrola (Pacific Wind)] (San Diego) | 51 | -- b | NOI published 12/29/09 Draft EIS released 12/23/10 Final EIS released 12/23/11 Decision pending |
NV | | 200 | 24,382 | NOI published 12/16/08 Draft EIS released 1/20/12 Final EIS released 12/14/12 Decision pending |
a Rated total output capacity. Potential output may change depending on the analysis and review of each project.
b Projects on private/Tribal land: denotes "connected action" projects that will require BLM authorizations for transmission, access, and other off-site facilities.
Geothermal Energy Projects
State | Project Name [Applicant] (County) | Potential Output (MW) a | BLM Acreage | Status |
CA | Casa Diablo (map) [Mammoth Pacific (Ormat)] (Mono) | 33 | 100 | NOI published 3/25/11 Draft EIS released 11/16/12 Final EIS pending |
NV | Silver Peak (map) [Rockwood] (Esmeralda) | 5 | 5 | EA pending |
NV | New York Canyon (map) [Terragen] (Pershing) | 62 | 15,135 | EA pending |
a Rated total output capacity. Potential output may change depending on the analysis and review of each project.