  • Allatoona Lake was authorized by the Flood control Acts of 1941 and 1946.
  • The general contractor for construction of Allatoona Dam was National Constructor Inc.

  • The total cost of  Allatoona Dam for construction, land, clearing and relocation was $31,500,000 in 1950.

  • Allatoona Lake serves seven authorized purposes:

    • 1.      Flood Control

      2.      Hydropower generation

      3.      Water supply

      4.      Recreation

      5.      Fish and wildlife management

      6.   Water quality

      7.   Navigation

    • The power plant began operation January 31, 1950.

    • Since 1957 the summer pool elevation has been 840 msl.

    • Since 1957 the winter draw down has been 823 msl.

    • Two municipalities that withdraw water from the lake.

      • 1.      The City of Cartersville uses 12 million gallons per day.

        2.      Cobb County-Marietta Water Authority uses 43 million gallons per day.

      • In 2011 Allatoona Lake recorded more than six million visitors. Allatoona Lake ranks in the top five most visited Corps projects in the United States.

      • Hydroelectric power generation at Allatoona  Dam returns, on average, more than  $3.5 million to the Federal Treasury annually.

      • The Corps collected more than $1.3 million in camping and day use fees in 2011.

      • Visitors to Allatoona Lake spent more than $14 million for consumable goods in 2006.

      • The presence of Allatoona Dam has prevented nearly $80 million in flood damages since 1950.

      • The record high water on Allatoona of 861.19 occurred on April 9, 1964.

      • From 1950 through 2011,  307 drownings have occurred in Allatoona.

      • The Corps of Engineers has 587 campsites on Allatoona Lake.