Docket
No. |
Date |
Title |
Order No. 773
(RM12-6-000 & RM12-7-000) |
December 20, 2012
(effective March 5, 2013) |
Revisions to Electric Reliability Organization Definition of Bulk Electric System and Rules of Procedure (Final Rule) |
RM12-6-000 and RM12-7-000 |
June 22, 2012 |
Revisions to Electric Reliability Organization Definition of Bulk Electric System and Rules of Procedure (Notice of Proposed Rulemaking) |
Order No. 1000-A
(RM10-23-001) |
May 17, 2012 |
Transmission Planning and Cost Allocation by Transmission Owning and Operating Public Utilities (Order on Rehearing & Clarification)
» Visit our Order No. 1000 Section |
Order No. 745-A
(RM10-17-001) |
December 15, 2011 |
Demand Response Compensation in Organized Wholesale Energy Markets (Order on Rehearing and Clarification) |
Order No. 1000
(RM10-23-000) |
July 21, 2011 (effective October 11, 2011) |
Transmission Planning and Cost Allocation by Transmission Owning and Operating Public Utilities (Final Rule) » Visit our Order No. 1000 section |
Order No. 717-D (RM07-1-003) |
April 8, 2011
(effective May 16, 2011) |
Standards of Conduct for Transmission Providers (Order on Rehearing and Clarification) |
Order No. 743-A (RM09-18-001) |
March 17, 2011
(effective March 23, 2011) |
Revision to Electric Reliability Organization Definition of Bulk Electric System (Order on Rehearing) |
Order No. 745 (RM10-17-000) |
March 15, 2011 (effective April 25, 2011) |
Demand Response Compensation in Organized Wholesale Energy Markets (Final Rule) |
Order No. 743
(RM09-18-000) |
November 18, 2010 (effective January 25, 2011) |
Revision to Electric Reliability Organization Definition of Bulk Electric System (Final Rule) |
Order No. 741
(RM10-13-000) |
October 21, 2010
(effective November 26, 2010) |
Credit Reforms in Organized Wholesale Electric Markets
(Final Rule) |
Order No. 717-C (RM07-1-002) |
April 16, 2010 |
Standards of Conduct for Transmission Providers (Order on Rehearing and Clarification) |
Order No. 719-B
(RM07-19-002) |
December 17, 2009 |
Wholesale Competition in Regions with Organized Electric Markets (Order Denying Rehearing And Providing Clarification) |
Order No. 717-B (RM07-1-002) |
November 16, 2009 |
Standards of Conduct for Transmission Providers (Order on Rehearing and Clarification) |
Order No. 717-A
(RM07-1-001) |
October 15, 2009 |
Standards of Conduct for Transmission Providers (Order on Rehearing and Clarification) |
Order No. 719-A
(RM09-17-001) |
July 16, 2009 |
Wholesale Competition in Regions with Organized Electric Markets (Order on Rehearing) |
Order No. 697-B
(RM04-7-006) |
December 19, 2008 |
Market-Based Rates for Wholesale Sales of Electric Energy, Services by Public Utilities (Order on Rehearing and Clarification) |
Order No. 719
(RM07-19-000) |
October 17, 2008 |
Wholesale Competition in Regions with Organized Electric Markets (Final Rule) |
Order No. 718
(RM08-8-000) |
October 16, 2008 |
Ex Parte Contacts and Separation of Functions Advisory (Final Rule) |
Order No. 717
(RM07-1-000) |
October 16, 2008 |
Standards of Conduct for Transmission Providers (Final Rule) |
RM04-7-005
|
July 17, 2008 |
Market-Based Rates for Wholesale Sales of Electric Energy, Services by Public Utilities (Order on Rehearing and Clarification) |
Order No. 890-B
(RM05-17-000 & RM05-25-000) |
June 23, 2008 |
Preventing Undue Discrimination and Preference in Transmission Service |
Order No. 711
(RM08-10-000) |
May 15, 2008 |
Submissions to the Commission upon Staff Intention to Seek an Order to Show Cause (Final Rule) |
RM08-8-000 |
May 15, 2008 |
Ex Parte Contacts and Separation of Functions (Notice of Proposed Rulemaking) |
PL08-2-000 |
May 15, 2008 |
Obtaining Guidance on Regulatory Requirements |
Order No. 697-A
(RM04-7-001) |
April 21, 2008 |
Market-Based Rates for Wholesale Sales of Electric Energy,
Services by Public Utilities (Order on Rehearing and Clarification) |
RM07-1-000 |
March 21, 2008 |
Standards of Conduct for Transmission Providers (Notice of Proposed Rulemaking) |
Order
No. 890-A |
December 28, 2007 |
Preventing Undue Discrimination and Preference in Transmission Service (Order on Rehearing and Clarification) |
Order
No. 704 (RM07-10-000) |
December 26, 2007 |
Transparency Provisions of Section 23 of the Natural Gas Act (Final Rule) |
Order No. 697
(RM04-7-000) |
June 21, 2007 |
Market-Based Rates for Wholesale Sales of Electric Energy, Capacity and Ancillary Services by Public Utilities (Final Rule) |
Order
No. 890
(RM05-17-000 & RM05-25-000) |
February 16, 2007 |
Preventing Undue Discrimination and Preference in Transmission Service
(Final Rule) |
Order No. 690
(RM07-6-000) |
January 9, 2007 |
Interim Rule on Standards of Conduct for Transmission Providers (see Standards of Conduct for Transmission Providers section for more detail) |
Order
No. 2006-B
(RM02-12-002) |
July 20, 2006 |
Standardization of Small Generator Interconnection
Agreements and Procedures (Order on Clarification) |
Order
No. 2006-A
(RM02-12-001) |
November 22, 2005 |
Standardization of Small Generator Interconnection
Agreements and Procedures (Order on Rehearing) |
Order
No. 2003-C |
June 16, 2005 |
Standardization of Generator Interconnection
Agreements and Procedures, Order on Rehearing
(Final Rule) |
Order
No. 2006 |
May 12, 2005 |
Standardization of Small Generator
Interconnection Agreements and Procedures (Final
Rule) |
Order
No. 2004-C |
December 21, 2004 |
Standards of Conduct for Transmission Providers (see Standards of Conduct for Transmission Providers section for more detail)
(Final Rule) |
Order
No. 2003-B |
December 20, 2004 |
Standardization of Generator Interconnection
Agreements and Procedures, Order on Rehearing
and
Directing Compliance (Final Rule) |
Order
No. 2004-B |
August 2, 2004 |
Standards of Conduct for Transmission
Providers (see Standards of Conduct for Transmission Providers section for more detail) |
Order
No. 2004-A |
April 16, 2004 |
Standards of Conduct for Transmission
Providers (Order on Rehearing) (Final Rule) (see Standards of Conduct for Transmission Providers section for more detail) |
Order
No. 2003-A |
March 5, 2004 |
Standardization of Generator Interconnection
Agreements and Procedures (Order on Rehearing)
(Final
Rule) |
Order
No. 2004 |
November 25, 2003 |
Standards of Conduct (Final Rule) (see Standards of Conduct for Transmission Providers section for more detail) |
Order
No. 2003 |
July 24, 2003 |
Standardization of Generator Interconnection
Agreements and Procedures (Final Rule) |
Order
No. 637-B
|
July 26, 2000 |
Order Denying Rehearing Concerning
Regulation of Short-Term Natural Gas Transportation
Services (Final Rule) |
Order
No. 637-A |
May 19, 2000 |
Order on Rehearing, Rehearing of
Short-term Natural Gas Transportation Services,
and Regulation of Interstate Natural Gas Transportation
Services (Final Rule) |
Order No. 2000-A
Bookmarked version |
February 25, 2000 |
Regional Transmission Organization (RTO) (Order on Rehearing) (Final Rule; Order on Rehearing) |
Order No. 2000 (Complete Version)
» Part 1 of 4
» Part 2 of 4
» Part 3 of 4
» Part 4 of 4 |
December 20, 1999 |
Establishment of Regional Transmission Organizations proposals (Final Rule) |
Order
No. 637 |
February 9, 1999 |
Regulation of Short-term Natural
Gas Transportation Services, and Regulation of
Interstate
Natural Gas Transportation Services (Final Rule) |
Order
No. 888-C |
January 20, 1998 |
Order on Rehearing, Denying Otter
Power Co. Rehearing Request |
Order
No. 889-B |
November 25, 1997 |
Final Order: Order Denying Rehearing
of Order 889-A in Regards to Open Access Same-Time
Information System & Standards of Conduct (OASIS) |
Order
No. 888-B |
November 25, 1997 |
Order Affirming, With Certain Clarifications,
The Fundamental Calls Made in Order 888-A in Regard
To Promoting Wholesale Competition Through Open
Access Non-discriminatory Services etc |
Order
No. 888-A |
March 4, 1997 |
Reaffirming & clarifying terms
of Order 888 in regards to Open Access Transmission
Services & Recovery of Stranded Costs |
Order
No. 889-A |
March 4, 1997 |
Order Revising Rules Governing Transmission
Information Networks, Standards of Conduct and
Policy
on Posting Discounts consistant with changes under
Order 888-A |
Order No. 889 |
April 24, 1996 |
OASIS: Open Access Same-Time Information
System (formerly Real- Time Information Networks)
and Standards of Conduct (Final Rule) |
Order
No. 888 |
April 24, 1996 |
Transmission Open Access. Promoting
Wholesale Competition Through Open Access Non-discriminatory
Transmission Services by Public Utilities; Recovery
of Stranded Costs by Public Utilities and Transmitting
Utilities (Final Rule) |
Order
No. 636-C |
November 27, 1992 |
Order Denying Rehearing and Clarifying
Orders 636 and 636-A (Final Rule)
|
Order
No. 636-B |
November 27, 1992 |
Order Denying Rehearing and Clarifying
Orders 636 and 636-A (Final Rule)
|
Order
No. 636-A |
August 3, 1992 |
Denying Rehearing in Part, Granting
Rehearing in Part and Clarifying Order 636 (Final
Rule) |
Order
No. 636 |
April 9, 1992 |
Restructuring of Interstate Natural
Gas Pipeline Services (Final Rule) |
Docket
No. |
Date |
Title |
Order No. 769
(RM12-2-000) |
October 18, 2012 (effective December 28, 2012)
|
Filing of Privileged Materials and Answers to Motions
(Final Rule)
|
Order No. 765
(RM12-13-000) |
July 19, 2012
(effective July 25, 2012)
|
Continuity of Operations Plan (Final Rule) |
Order No. 756
(RM11-30-000) |
January 19, 2012 (effective February 1, 2012) |
Technical Corrections to Commission Regulations (Final Rule) |
RM12-2-000
|
December 16, 2011 |
Filing of Privileged Materials and Answers to Motions (Notice of Proposed Rulemaking) |
Order No. 734
(RM10-21-000) |
April 15, 2010 (effective May 1, 2010) |
Transferring Certain Enforcement Hotline Matters to the Dispute Resolution Service (Instant Final Rule) |
RM01-5-000 |
January 21, 2010 |
Order Establishing Procedures Relating To Tariffs Filed Electronically |
Order No. 731 (RM09-21-000) |
December 17, 2009 |
Revised Filing Requirements for Centralized Service Companies Under the Public Utility Holding Company Act of 2005, the Federal Power Act, and the Natural Gas Act (Final Rule) |
Order No. 727 (RM09-24-0000) |
October 15, 2009 |
Interest Rates for Refunds (Final Rule) |
RM05-5-017 |
September 17, 2009 |
Standards for Business Practices and
Communication Protocols for Public Utilities (Notice of Proposed Rulemaking) |
RM09-21-000
|
September 17, 2009 |
Revised Filing Requirements for Centralized Service Companies Under the Public Utility Holding Company Act of 2005, the Federal Power Act, and the Natural Gas Act (Notice of Proposed Rulemaking) |
RM05-35-000
|
December 18, 2008 |
Standard of Review for Modifications to Jurisdictional Agreements (Termination of Notice of Proposed Rulemaking) |
Order No. 714 (RM01-5-000)
|
September 19, 2008 |
Electronic Tariff Filings (Final Rule) |
RM01-5-000 |
April 17, 2008 |
Electronic Tariff Filings (Notice of Proposed Rulemaking) |
Order No. 703
(RM07-16-000) |
November 15, 2007 |
Filing Via the Internet (Final Rule) |
Order No. 702 (RM06-23-000) |
October 30, 2007 |
Critical Energy Infrastructure Information (Final Rule) |
RM07-16-000 |
July 23, 2007 |
Filing Via the Internet (Notice of Proposed Rulemaking) |
Order No. 694
(RM07-2-000) |
April 19, 2007 |
Accounting and Reporting Requirements for
Nonoperating Public Utilities and Licensees (Final Rule) |
Order No. 683-A
(RM06-24-001) |
April 9, 2007 |
Critical Energy Infrastructure Information (Final Rule) |
Order No. 690-A
(RM07-6-001) |
March 21, 2007 |
Order on Clarification and Rehearing on Standards of Conduct for Transmission Providers |
PL05-10-000 |
February 15, 2007 |
Criteria for Reassertion of Jurisdiction Over the Gathering Services of Natural Gas Company Affiliates (Clarifying Policy) |
AD07-4-000 |
December 21, 2006 |
Statement of Administrative Policy Regarding
the Process for Assessing Civil Penalties |
Order
No. 683
(RM06-24-000) |
September 21, 2006 |
Critical Energy Infrastructure Information (Final
Rule) |
RM06-23-000 |
September 21, 2006 |
Critical Energy Infrastructure Information (Notice of Proposed Rulemaking) |
Order
No. 680
(RM06-19-000) |
July 20, 2006 |
Commission Procedures During Periods of Emergency
Requiring Activation of Continuity of Operations Plan (Final Rule) |
Order
No. 677
(RM06-14-000) |
May 19, 2006 |
Revisions to Record Retention Requirements for
Unbundled Sales Service, Persons Holding Blanket
Marketing Certificates, and Public Utility Market-Based
Rate Authorization Holders (Final Rule) |
Order
No. 675-A
(RM06-2-001) |
May 18, 2006 |
Procedures for Disposition of Contested Audit
Matters (Order on Rehearing and Clarification)
(Final
Rule) |
Order
No. 663-A |
March 17, 2006 |
Revision of Rules of Practice and Procedure Regarding
Issue Identification (Final Rule) |
Order
No. 675 |
February 17, 2006 |
Procedures for Disposition of Contested Audit
Matters (Final Rule) |
Order
No. 670 |
January 19, 2006 |
Prohibition of Energy Market Manipulation (Final
Rule) (see Prohibition of Energy Market Manipulation section for more detail) |
RM05-35-000 |
December 27, 2005 |
Standard of Review for Modifications to Jurisdictional
Agreements |
RM06-5-000 |
November 21, 2005 |
Amendments to Codes of Conduct for Unbundled
Sales Service and for Persons Holding Blanket
Marketing
Certificates |
PL06-1-000 |
October 20, 2005 |
Policy Statement on Enforcement |
RM05-6-000 |
September 16, 2005 |
Commission Authorization to Hold Interlocking
Positions |
Order
No. 662 |
June 21, 2005 |
Critical Energy Infrastructure Information (Final
Rule) |
Order
No. 649 |
August 3, 2004 |
Critical Energy Infrastructure Information (Final
Rule) |
RM01-5-000 |
July 8, 2004 |
Electronic Tariff Filings (Notice of Proposed Rulemaking) |
Order
No. 647 |
June 3, 2004 |
Notice Format and Technical Corrections (Final
Rule) |
Order
No. 646
» Appendix
B |
February 11, 2004 |
Quarterly Financial Reporting and Revisions
to the Annual Reports (Final Rule) |
Order No. 645
(RM04-3-000) |
December 18, 2003
|
Emergency Closures (Final Rule)
|
PA02-2-000 |
October 16, 2003 |
Fact-Finding Investigation of Potential Market
Manipulation of Electric and Natural Gas Prices |
EL01-118-000 |
July 25, 2003 |
Investigation of Terms and Conditions of Public
Utility Market-Based Rate Authorization |
Order
No. 630-A |
July 23, 2003 |
Critical Energy Infrastructure Information (Final
Rule) |
RT03-1-001 |
May 8, 2003 |
Order Denying Rehearing; Communications with
Commission-Approved Market Monitors |
Order
No. 630 |
February 21, 2003 |
Critical Energy Infrastructure Information (Final
Rule) |
RT03-1-000 |
January 16, 2003 |
Communications with Commission-Approved Market
Monitors |
PL02-5-000 |
December 20, 2002 |
Statement of Administrative Policy on Separation
of Functions |
Order
No. 623 |
December 21, 2001 |
Amendment to Rules Governing Off-the-Record Communications
(Final Rule) |
RM98-1-002 |
November 9, 2001 |
State-Federal Regional Panels and Clarifying
Order 607 |
Order
No. 607-A |
November 21, 2000 |
Regulations Governing Off-the-Record Communications
(Order on Rehearing and Clarification) |
Order
No. 607 |
September 15, 1999 |
Regulations Governing Off-the-Record Communications
(Final Rule) |
Order
No. 604
|
May 26, 1999 |
Electronic Service of Documents (Final Rule) |
Order
No. 602
|
March 31, 1999 |
Complaint Procedures (Final Rule) |
Order
No. 589 |
August 16, 1996 |
Supplemental Standards of Ethical Conduct for
Employees (Final Rule) |
Order
No. 578 |
April 12, 1995 |
Alternative Dispute Resolution (Final Rule) |
Docket
No. |
Date |
Title |
Order No. 676-G (RM05-5-020) |
February 21, 2013 |
Standards for Business Practices and Communication Protocols for Public Utilities (Final Rule) |
RM13-2-000 |
January 17, 2013 |
Small Generator Interconnection Agreements and Procedures (Notice of Proposed Rulemaking)
|
Order No. 773
(RM12-6-000 & RM12-7-000) |
December 20, 2012
(effective 03-05-2013) |
Revisions to Electric Reliability Organization Definition of Bulk Electric System and Rules of Procedure (Final Rule) |
Order No. 764-A
(RM10-11-001)
|
December 20, 2012 |
Integration of Variable Energy Resources (Order on Rehearing and Clarification and Granting Motion for Extension of Time) |
Order No. 771
(RM11-12-000)
|
December 20, 2012 (effective 02-26-2013) |
Availability of E-Tag Information to Commission Staff |
Order No. 770
(RM12-3-000) |
November 15, 2012
(effective April 1, 2013) |
Revisions to Electric Quarterly Report Filing Process (Final Rule) |
Order No. 1000-B
(RM10-23-002) |
October 18, 2012
(effective November 23, 2012) |
Transmission Planning and Cost Allocation by Transmission Owning and Operating Public Utilities (Order on Rehearing & Clarification)
» Visit our Order No. 1000 Section |
Order No. 768
RM10-12-000
|
September 21, 2012
(effective December 10, 2012) |
Electricity Market Transparency Provisions of Section 220 of the Federal Power Act (Final Rule) |
Order No. 766 RM12-20-000 |
September 20, 2012
(effective October 1, 2012) |
Delegation of Authority Regarding Electric Reliability Organization’s Budget, Delegation Agreement, and Policy and Procedure Filings
(Final Rule) |
RM11-24-000 & AD10-13-000 |
June 22, 2012 |
Third-Party Provision of Ancillary Services; Accounting and Financial Reporting for New Electric Storage Technologies (Notice of Proposed Rulemaking) |
Order No. 764
(RM10-11-000) |
June 22, 2012
(effective 09-11-2012) |
Integration of Variable Energy Resources
(Final Rule) |
RM12-6-000 and RM12-7-000 |
June 22, 2012 |
Revisions to Electric Reliability Organization Definition of Bulk Electric System and Rules of Procedure (Notice of Proposed Rulemaking) |
RM12-3-000
| June 21, 2012 |
Revisions to Electric Quarterly Report Filing Process (Notice of Proposed Rulemaking) |
Order No. 1000-A
(RM10-23-001) |
May 17, 2012 |
Transmission Planning and Cost Allocation by Transmission Owning and Operating Public Utilities (Order on Rehearing & Clarification)
» Visit our Order No. 1000 Section |
AD12-14-000 & AD11-11-000 |
April 19, 2012 |
Open Access and Priority Rights on Interconnection Facilities (Notice of Inquiry) |
Order No. 760
(RM11-17-000) |
April 19, 2012 |
Enhancement of Electricity Market Surveillance and Analysis through Ongoing Electronic Delivery of Data from Regional Transmission Organizations and Independent System Operators (Final Rule) |
RM05-5-020 |
April 19, 2012 |
Standards for Business Practices and
Communication Protocols for Public Utilities (Notice of Proposed Rulemaking) |
RM01-08-012 |
March 15, 2012 |
Revised Public Utility Filing Requirements for Electric Quarterly Reports (Notice of Proposed Rulemaking) |
RM11-09-000 |
February 16, 2012 |
Locational Exchanges of Wholesale Electric Power (Notice Terminating Proceeding) |
Order No. 755-A |
February 16, 2012 |
Frequency Regulation Compensation in Organized Wholesale Power Markets (Order Denying Rehearing) |
RM11-14-000 |
February 16, 2012 |
Analysis of Horizontal Market Power under the Federal Power Act (Order Reaffirming Commission Policy and Terminating Proceeding) |
Order No. 745-A
(RM10-17-001) |
December 15, 2011 |
Demand Response Compensation in Organized Wholesale Energy Markets (Order on Rehearing and Clarification) |
Order No. 1000
(RM10-23-000) |
July 21, 2011 (effective October 11, 2011) |
Transmission Planning and Cost Allocation by Transmission Owning and Operating Public Utilities (Final Rule) » Visit our Order No. 1000 section |
Order No. 755
(RM11-7-000 & AD10-11-000) |
October 20, 2011 |
Frequency Regulation Compensation in Organized Wholesale Power Markets (Final Rule) |
RM11-17-000 |
October 20, 2011 |
Enhancement of Electricity Market Surveillance and Analysis through Ongoing Electronic Delivery of Data from Regional Transmission Organizations and Independent System Operators (Notice of Proposed Rulemaking) |
Order No. 1000
(RM10-23-000) |
July 21, 2011 (effective October 11, 2011) |
Transmission Planning and Cost Allocation by Transmission Owning and Operating Public Utilities (Final Rule) |
RM11-24-000
(AD10-13-000) |
June 16, 2011 |
Third-Party Provision of Ancillary Services; Accounting and Financial Reporting for New Electric Storage Technologies (Notice of Inquiry) |
Order No. 741-B
(RM10-13-002) |
June 16, 2011 |
Credit Reforms in Organized Wholesale Electric Markets (Order Denying Rehearing) |
RM11-26-000 |
May 19, 2011 |
Promoting Transmission Investment Through Pricing Reform (Notice of Inquiry) |
Order No. 739-A
(RM10-22-001) |
May 19, 2011 |
Promoting a Competitive Market for Capacity Reassignment (Order On Rehearing And Clarification) |
RM11-12-000 |
April 21, 2011 |
Availability of E-Tag Information to Commission Staff (Notice of Proposed Rulemaking) |
RM10-12-000 |
April 21, 2011 |
Electricity Market Transparency Provisions of Section 220 of the Federal Power Act (Notice of Proposed Rulemaking) |
Order No. 751
(RM09-9-000) |
April 21, 2011 (effective June 27, 2011) |
Version One Regional Reliability Standards for Facilities Design, Connections, and Maintenance; Protection and Control; and Voltage and Reactive (Final Rule) |
Order No. 752
(RM09-14-000) |
April 21, 2011
(effective June 27, 2011) |
Version One Regional Reliability Standard for Transmission Operations
(Final Rule) |
RM10-29-000 |
April 21, 2011 |
Electric Reliability Organization Interpretation of Transmission Operations Reliability Standard (Notice of Proposed Rulemaking) |
Order No. 750
(RM10-8-000) |
April 21, 2011 (effective May 26, 2011) |
Electric Reliability Organization Interpretations of Interconnection Reliability Operations and Coordination and Transmission Operations Reliability Standards (Final Rule) |
Order No. 749
(RM10-16-000) |
March 17, 2011
(effective May 23, 2011) |
System Restoration Reliability Standards (Final Rule) |
Order No. 748
(RM10-15-000) |
March 17, 2011
(effective May 23, 2011) |
Mandatory Reliability Standards for Interconnection Reliability Operating Limits (Final Rule) |
Order No. 747
(RM10-10-000) |
March 17, 2011
(effective May 23, 2011) |
Planning Resource Adequacy Assessment Reliability Standard (Final Rule) |
Order No. 746
(RM09-19-000) |
March 17, 2011 (effective May 24, 2011) |
Western Electric Coordinating Council Qualified Transfer Path Unscheduled Flow Relief Regional Reliability Standard
(Final Rule) |
Order No. 743-A (RM09-18-001) |
March 17, 2011
(effective March 23, 2011) |
Revision to Electric Reliability Organization Definition of Bulk Electric System (Order on Rehearing) |
RM11-14-000 |
March 17, 2011 |
Analysis of Horizontal Market Power under the Federal Power Act (Notice of Inquiry) |
Order No. 745 (RM10-17-000) |
March 15, 2011 (effective April 25, 2011) |
Demand Response Compensation in Organized Wholesale Energy Markets (Final Rule) |
RM11-07-000 & AD10-11-000 |
February 17, 2011 |
Frequency Regulation Compensation in the Organized Wholesale Power Markets (Notice of Proposed Rulemaking) |
RM11-09-000 |
February 17, 2011 |
Locational Exchanges of Wholesale Electric Power (Notice of Inquiry) |
Order No. 741-A
(RM10-13-001) |
February 17, 2011
(effective March 28, 2011) |
Credit Reforms in Organized Wholesale Electric Markets (Order on Rehearing) |
RM10-20-000 |
January 20, 2011 |
Market-Based Rate Affiliate Restrictions (Withdrawal of Notice of Proposed Rulemaking and Termination of Rulemaking Proceeding.) |
RM04-7-009 |
January 20, 2011 |
Market-Based Rates for Wholesale Sales of Electric Energy, Capacity and Ancillary Services By Public Utilities (Order Denying Rehearing and Motion For Stay And Rescission) |
RM09-09-000 |
December 17, 2010 |
Version One Regional Reliability Standards for Facilities Design, Connections, and Maintenance; Protection and Control; and Voltage and Reactive (Notice of Proposed Rulemaking) |
RM10-08-000 |
December 16, 2010 |
Electric Reliability Organization Interpretations of Interconnection Reliability Operations and Coordination and Transmission Operations Reliability Standards (Notice of Proposed Rulemaking) |
RM10-05-000 |
December 16, 2010 |
Interpretation of Protection System Reliability Standard (Notice of Proposed Rulemaking) |
RM09-14-000 |
December 16, 2010 |
Version One Regional Reliability Standard for Transmission Operations (Notice of Proposed Rulemaking) |
RM10-11-000 |
November 18, 2010 |
Integration of Variable Energy Resources (Notice of Proposed Rulemaking) |
|
Order No. 743
(RM09-18-000) |
November 18, 2010
(effective January 25, 2011) |
Revision to Electric Reliability Organization Definition of Bulk Electric System (Final Rule) |
RM10-15-000 |
November 18, 2010 |
Mandatory Reliability Standards for Interconnection Reliability Operating Limits (Notice of Proposed Rulemaking) |
RM10-16-000 |
November 18, 2010 |
System Restoration Reliability Standards (Notice of Proposed Rulemaking) |
Order No. 742 (RM09-25-000) |
November 18, 2010 (effective January 25, 2011) |
System Personnel Training Reliability Standards (Final Rule) |
RM09-19-000 |
October 21, 2010 |
Western Electric Coordinating Council Qualified Transfer Path Unscheduled Flow Relief Regional Reliability Standard (Notice of Proposed Rulemaking) |
Order No. 741
(RM10-13-000) |
October 21, 2010
(effective November 26, 2010) |
Credit Reforms in Organized Wholesale Electric Markets
(Final Rule) |
Order No. 740
(RM09-15-000) |
October 21, 2010
(effective November 26, 2010) |
Version One Regional Reliability Standard for Resource and Demand Balancing (Final Rule) |
RM10-10-000 |
October 21, 2010 |
Planning Resource Adequacy Assessment Reliability Standard (Notice of Proposed Rulemaking) |
Order No. 739
(RM10-22-000) |
September 20, 2010 |
Promoting a Competitive Market for Capacity Reassignments (Final Rule) |
RM10-17-000 |
August 2, 2010 |
Demand Response Compensation In Organized Wholesale Energy Markets (Supplemental Notice Of Proposed Rulemaking And Notice Of Technical Conference) |
Order No. 729-B (RM08-19-003) |
July 15, 2010 |
Mandatory Reliability Standards for the Calculation of Available Transfer Capability, Capacity Benefit Margins, Transmission Reliability Margins, Total Transfer Capability, and Existing Transmission Commitments; Mandatory Reliability Standards for the Bulk-Power System; and Standards for Business Practices and Communications Protocols for Public Utilities (Order on Rehearing and Reconsideration) |
RM09-25-000 |
June 17, 2010 |
System Personnel Training Reliability Standards (Notice of Proposed Rulemaking) |
RM10-23-000 |
June 17, 2010 |
Transmission Planning and Cost Allocation by Transmission Owning and Operating Public Utilities (Notice of Proposed Rulemaking) |
Order No. 729-A (RM08-19-002) |
May 5, 2010 |
Mandatory Reliability Standards for the Calculation of Available Transfer Capability, Capacity Benefit Margins, Transmission Reliability Margins, Total Transfer Capability, and Existing Transmission Commitments and Mandatory Reliability Standards for the Bulk-Power System (Order on Clarification) |
RM10-22-000 |
April 29, 2010 |
Promoting a Competitive Market for Capacity Reassignments (Notice of Proposed Rulemaking) |
Order No. 676-F
(RM05-5-017) |
April 15, 2010
(effective May 23, 2010) |
Standards for Business Practices and Communication Protocols for Public Utilities (Final Rule) |
RM10-20-000 |
April 15, 2010 |
Market-Based Rate Affiliate Restrictions
(Notice of Proposed Rulemaking) |
Order No. 732
(RM09-23-000) |
March 19, 2010
(effective June 1, 2010) |
Revisions to Form, Procedures, and Criteria for Certification of Qualifying Facility Status for a Small Power Production or Cogeneration Facility
(Final Rule) |
Order No. 733
(RM08-13-000) |
March 18, 2010
(effective May 17, 2010) |
Transmission Relay Loadability Reliability Standard (Final Rule) |
RM09-15-000 |
March 18, 2010 |
Version One Regional Reliability Standard for Resource and Demand Balancing (Notice of Proposed Rulemaking) |
RM09-13-000 |
March 18, 2010 |
Time Error Correction Reliability Standard (Notice of Proposed Rulemaking) |
Order No. 733 (RM08-13-000 ) |
March 18, 2010 |
Transmission Relay Loadability Reliability Standard (Final Rule) |
Order No. 697-D (RM04-7-00) |
March 18, 2010 |
Market-Based Rates For Wholesale Sales of Electric Energy, Capacity And Ancillary Services By Public Utilities (Order on Rehearing and Clarification) |
RM10-6-000 |
March 18, 2010 |
Interpretation of Reliability Standard (Notice of Proposed Rulemaking) |
RM09-18-000 |
March 18, 2010 |
Revision to Electric Reliability Organization Definition of Bulk Electric System (Notice of Proposed Rulemaking) |
RM10-17-000 |
March 18, 2010 |
Demand Response Compensation in Organized Wholesale Energy Markets (Notice of Proposed Rulemaking) |
RM10-11-000 |
January 21, 2010 |
Integration of Variable Energy Resources (Notice of Inquiry) |
RM09-16-000 |
January 21, 2010 |
Control and Affiliation for Purposes of Market-Based Rate Requirements under Section 205 of the Federal Power Act and the Requirements of Section 203 of the Federal Power Act (Notice of Proposed Rulemaking) |
RM10-12-000 |
January 21, 2010 |
Electricity Market Transparency Provisions of Section 220 of the Federal Power Act (Notice of Inquiry) |
RM10-13-000 |
January 21, 2010 |
Credit Reforms in Organized Wholesale Electric Markets (Notice of Proposed Rulemaking) |
RM10-9-000 |
January 21, 2010 |
Transmission Loading Relief Reliability Standard and Curtailment Priorities (Notice of Inquiry) |
Order No. 713-B
(RM08-7-002) |
January 21, 2010 |
Modification of Interchange and Transmission Loading Relief Reliability Standards; and Electric Reliability Organization Interpretation of Specific Requirements of Four Reliability Standards (Order on Rehearing & Clarification) |
Order No. 730 (RM09-8-000) |
December 17, 2009 |
Revised Mandatory Reliability Standards for Interchange Scheduling and Coordination (Final Rule) |
Order No. 729 (RM08-19-000, RM09-5-000 and RM06-16-005) |
November 24, 2009 |
Mandatory Reliability Standards for the Calculation of Available Transfer Capability, Capacity Benefit Margins, Transmission Reliability Margins, Total Transfer Capability, and Existing Transmission Commitments and Mandatory Reliability Standards for the Bulk-Power System (Final Rule) |
Order No. 890-D |
November 19, 2009 |
Preventing Undue Discrimination and Preference in Transmission Service (Order on Rehearing and Clarification) |
RM09-23-000 |
October 15, 2009 |
Revisions to Form, Procedures, and Criteria for Certification of Qualifying Facility Status for a Small Power Production or Cogeneration Facility
(Notice of Proposed Rulemaking) |
Order No. 697-C
(RM04-7-006) |
June 18, 2009 |
Market-Based Rates For Wholesale Sales of Electric Energy, Capacity And Ancillary Services By Public Utilities (Order on Rehearing and Clarification) |
RM09-8-000
|
June 18, 2009 |
Revised Mandatory Reliability Standards for Interchange Scheduling and Coordination (Notice of Proposed Rulemaking) |
RM08-13-000
|
May 21, 2009 |
Transmission Relay Loadability Reliability Standard (Notice of Proposed Rulemaking) |
Order No. 723 (RM08-12-000)
|
May 21, 2009 |
Western Electricity Coordinating Council regional Reliability Standard regarding automatic time error correction (Final Rule) |
Order No. 708-B (RM07-21-001)
|
May 21, 2009 |
Blanket Authorization Under FPA Section 203 (Order on Rehearing) |
Order 724 (RM08-16-000) |
May 21, 2009 |
Electric Reliability Organization Interpretations of Specific Requirements of Frequency Response and Bias and Voltage and Reactive Control Reliability Standards (Final Rule) |
Order No. 722
(RM08-11-000) |
March 20, 2009 |
Version Two Facilities Design, Connections and Maintenance Reliability Standards (Final Rule) |
Order No. 713-A
(RM08-7-001) |
March 19, 2009 |
Modification of Interchange and Transmission Loading Relief Reliability Standards; and Electric Reliability Organization Interpretation of Specific Requirements of Four Reliability Standards (Order on Rehearing & Clarification) |
RM08-19-000, RM09-5-000 and RM06-16-005 |
March 19, 2009 |
Mandatory Reliability Standards for the Calculation of Available Transfer Capability, Capacity Benefit Margins, Transmission Reliability Margins, Total Transfer Capability, and Existing Transmission Commitments and Mandatory Reliability Standards for the Bulk-Power System
(Notice of Proposed Rulemaking) |
RM05-5-013 |
March 19, 2009 |
Standards for Business Practices and Communication Protocols for Public Utilities (Notice of Proposed Rulemaking) |
Order No. 890-C (RM05-17-004 and RM05-25-004) |
March 19, 2009 |
Preventing Undue Discrimination and Preference in Transmission Service (Order on Rehearing and Clarification) |
Order No. 706-B (RM06-22-000) |
March 19, 2009 |
Mandatory Reliability Standards for Critical Infrastructure Protection Advisory (Order on Clarification) |
Order No. 697-B (RM04-7-005) |
December 19, 2008 |
Market-Based Rates for Wholesale Sales of Electric Energy, Capacity and Ancillary Services by Public Utilities (Order on Rehearing) |
RM08-16-000 |
November 20, 2008 |
Electric Reliability Organization Interpretations of Frequency Response and Bias and Voltage and Reactive Control Reliability Standards (Notice of Proposed Rulemaking) |
RM08-12-000 |
November 20, 2008 |
Western Electricity Coordinating Council Regional Reliability Standard Regarding Automatic Time Error Correction (Notice of Proposed Rulemaking) |
RM08-11-000 |
October 16, 2008 |
Version Two Facilities Design, Connections and Maintenance Reliability Standards (Notice of Proposed Rulemaking) |
Order No. 716
(RM08-3-000) |
October 16, 2008 |
Mandatory Reliability Standard for Nuclear Plant Interface Coordination (Final Rule) |
Order No. 715
(RM08-5-000)
|
September 19, 2008 |
Revisions to Forms, Statements and Reporting Requirements for
Electric Utilities and Licensees (Final Rule) |
RM06-22-000
|
September 18, 2008 |
Mandatory Reliability Standards for Critical Infrastructure Protection - Order on Proposed Clarification |
Order No. 713
(RM08-7-000) |
July 21, 2008 |
Modification of Interchange and Transmission Loading Relief Reliability Standards; and Electric Reliability Organization Interpretation of Specific Requirements of Four Reliability Standards (Final Rule) |
Order No. 707-A
(RM07-15-001) |
July 17, 2008 |
Cross-Subsidization Restrictions on Affiliate Transactions (Order on Rehearing) |
Order No. 708-A
(RM07-21-001) |
July 17, 2008 |
Blanket Authorization Under FPA Section 203 (Order on Rehearing) |
Order No. 706-C
(RM06-22-006) |
June 18, 2009 |
Mandatory Reliability Standards for Critical Infrastructure Protection (Order Denying Request for Clarification) |
Order No. 697-C
(RM04-7-006) |
June 18, 2009 |
Market-Based Rates for Wholesale Sales of Electric Energy, Services by Public Utilities (Order on Rehearing and Clarification) |
Order No. 706-A (RM06-22-000) |
May 16, 2008 |
Mandatory Reliability Standards for Critical Infrastructure Protection (Order on Rehearing) |
RM08-7-000
|
April 21, 2008 |
Modification of Interchange and Transmission Loading Relief Reliability Standards; and Electric Reliability Organization Interpretation of Specific Requirements of Four Reliability Standards (Notice of Proposed Rulemaking) |
AD08-7-000 |
April 21, 2008 |
Annual Charges Assessments for Public Utilities (NOI) |
RM08-3-000 |
March 20, 2008 |
Mandatory Reliability Standard for Nuclear Plant Interface Coordination (Notice of Proposed Rulemaking) |
Order No. 709 |
March 11, 2008 |
Elimination of FERC Form No. 423 (Final Rule) |
RM07-19-000 and AD07-7-000 |
February 22, 2008 |
Wholesale Competition in Regions with Organized Electric Markets (Notice of Proposed Rulemaking) |
Order No. 707
(RM07-15-000) |
February 21, 2008 |
Cross-Subsidization Restrictions on Affiliate Transactions (Final Rule) |
Order No. 708 (RM07-21-000) |
February 21, 2008 |
Blanket Authorization Under FPA Section 203 (Final Rule) |
Order No. 706
(RM06-22-000) |
January 18, 2008 |
Mandatory Reliability Standards for Critical Infrastructure Protection (Final Rule) |
RM08-5-000 |
January 18, 2008 |
Revisions to Forms, Statements, and Reporting
Requirements for Electric Utilities and Licensees (Notice of Proposed Rulemaking) |
Order
No. 705 |
December 27, 2007 |
Facilities Design, Connections and Maintenance Reliability Standards (Final Rule) |
RM04-7-003
|
December 14, 2007 |
Market-Based Rates for Wholesale Sales of Electric Energy, Capacity and Ancillary Services by Public Utilities (Clarification) |
RM07-15-000
|
July 20, 2007 |
Cross-Subsidization Restrictions on Affiliate Transactions (Notice of Proposed Rulemaking) |
RM07-21-000
|
July 20, 2007 |
Blanket Authorization Under FPA Section 203 (Notice of Proposed Rulemaking) |
Order No. 693-A
(RM06-10-001) |
July 19, 2007 |
Mandatory Reliability Standards for the Bulk-Power System (Order on Rehearing) |
Order No. 688-A
(RM06-10-001) |
June 22, 2007 |
New PURPA Section 210(m) Regulations Applicable to Small Power Production and Cogeneration Facilities (Order on Rehearing) |
Order No. 697
(RM04-7-000) |
June 21, 2007 |
Market-Based Rates for Wholesale Sales of Electric Energy, Capacity and Ancillary Services by Public Utilities (Final Rule) |
Order No. 696
(RM07-11-000)
|
May 18, 2007 |
Applicability of Federal Power Act Section 215 to Qualifying Small Power Production and Cogeneration Facilities
(Final Rule) |
Order No. 689-A
(RM06-12-000)
|
May 17, 2007 |
Regulations for Filing Applications for Permits to Site Interstate Electric Transmission Facilities (Order on Rehearing) |
Order No. 679-B
(RM06-4-002) |
April 19, 2007 |
Promoting Transmission Investment through Pricing Reform (Order on Rehearing) |
RM07-11-000 |
March 16, 2007 |
Applicability of Federal Power Act Section 215 to Qualifying Small Power Production and Cogeneration Facilities (Notice of Proposed Rulemaking) |
Order No. 693
(RM06-16-000) |
March 16, 2007 |
Mandatory Reliability Standards for the Bulk-Power System (Final Rule) |
Order No. 667-C (RM05-32-003) |
February 20, 2007 |
Repeal of the Public Utility Holding Company Act of 1935 and Enactment of the Public Utility Holding Company Act of 2005 (Final Order; Order Denying Rehearing) |
Order
No. 890
(RM05-17-000 & RM05-25-000) |
February 16, 2007 |
Preventing Undue Discrimination and Preference in Transmission Service
(Final Rule) |
Order
No. 679-A
(RM06-4-001) |
December 22, 2006 |
Promoting Transmission Investment through Pricing Reform (Order
on Rehearing) |
Order
No. 689
(RM06-12-000) |
November 16, 2006 |
Regulations for Filing Applications for Permits to Site Interstate
Electric Transmission Facilities (Final Rule) |
Order
No. 681-A
(RM06-8-001) |
November 16, 2006 |
Long-Term Firm Transmission Rights in Organized Electricity Markets
(Order on Rehearing) |
RM96-1-027
and RM05-5-001 |
October 25, 2006 |
Standards for Business Practices for Interstate Natural Gas Pipelines
and Public Utilities (Notice of Proposed Rulemaking) |
RR06-3-000 |
October 24, 2006 |
Order conditionally accepting 2007 Business Plan and Budget of
the North American Electric Reliability Corporation
approving assessments to fund budgets and ordering
compliance filings |
RM06-16-000 |
October 20, 2006 |
Mandatory Reliability Standards for the Bulk-Power System (Notice of Proposed Rulemaking) |
Order
No. 688
(RM06-10-000) |
October 20, 2006 |
New PURPA Section 210(m) Regulations Applicable
to Small Power Production and Cogeneration Facilities
(Final Rule) |
Order
No. 669-B (RM05-34-002) |
July 20, 2006 |
Transactions Subject to FPA Section 203 (Order
on Rehearing of Order No. 669-A) |
Order
No. 2006-B
(RM02-12-002) |
July 20, 2006 |
Standardization of Small Generator Interconnection
Agreements and Procedures (Order on Clarification) |
Order
No. 679
(RM06-4-000) |
July 20, 2006 |
Promoting Transmission Investment through Pricing
Reform (Final Rule) |
Order
No. 681
(RM06-8-000) |
July 20, 2006 |
Long-Term Firm Transmission Rights in Organized
Electricity Markets (Final Rule) |
RM06-12-000 |
June 16, 2006 |
Regulations for Filing Applications for Permits
to Site Interstate Electric Transmission Corridors
(Notice of Proposed Rulemaking) |
Order
No. 671-A (RM05-36-001) |
May 22, 2006 |
Revised Regulations Governing Small Power Production
and Cogeneration Facilities (Final Rule) |
RM04-7-000 |
May 19, 2006 |
Market-Based Rates for Wholesale Sales of Electric
Energy, Capacity and Ancillary Services by Public
Utilities (Notice of Proposed Rulemaking) |
RM05-25-000
and RM05-17-000 |
May 19, 2006 |
Preventing Undue Discrimination and Preference
in Transmission Service (OATT Reform) (Notice of Proposed Rulemaking) |
RM01-10-005 |
May 18, 2006 |
Standards of Conduct for Transmission Providers |
Order
No. 676 (RM05-5-000) |
April 25, 2006 |
Standards for Business Practices and Communication
Protocols for Public Utilities (Final Rule) |
RM06-11-000 |
April 24, 2006 |
Financial Accounting, Reporting and Records Retention
Requirements Under the Public Utility Holding
Company
Act of 2005 (Notice of Proposed Rulemaking) |
Order
No. 667-A (RM05-32-001) |
April 24, 2006 |
Repeal of the Public Utility Holding Company
Act of 1935 and Enactment of the Public Utility
Holding
Company Act of 2005 (Final Rule) |
Order
No. 669-A (RM05-34-001) |
April 24, 2006 |
Transactions Subject to FPA Section 203 (Final
Rule) |
Order
No. 672-A |
March 30, 2006 |
Rules Concerning Certification of the Electric
Reliability Organization; and Procedures for the
Establishment, Approval, and Enforcement of Electric
Reliability Standards (Final Rule) |
RM06-14-000 |
February 16, 2006 |
Revisions to Record Retention Requirements for
Unbundled Sale Service, Person Holding Blanket
Marketing
Certificates, and Public Utility Market-Based Rate
Authorization Holders (Notice of Proposed Rulemaking) |
Order
No. 674 (RM06-13-000) |
February 16, 2006 |
Conditions for Public Utility Market-Based Rate
Authorization Holders (Final Rule) |
EL06-16-000 |
February 16, 2006 |
Order Revising Market-Based Rate Tariffs and
Authorizations |
RM01-10-005 |
February 16, 2006 |
Interpretive Order Relating to the Standards
of Conduct |
Order
No. 672 (RM05-30-000) |
February 3, 2006 |
Rules Concerning Certification of the Electric
Reliability Organization; and Procedures for the
Establishment, Approval, and Enforcement of Electric
Reliability Standards (Final Rule) |
Order
No. 671 (RM05-36-000) |
February 2, 2006 |
Revised Regulations Governing Small Power Production
and Cogeneration Facilities (Final Rule) |
RM06-8-000 |
February 2, 2006 |
Long-Term Transmission Rights in Markets Operated
by Regional Transmission Organizations and Independent
System Operators |
RM06-10-000 |
January 19, 2006 |
New PURPA Section 210(m) Regulations Applicable
to Small Power Production and Cogeneration Facilities (Notice of Proposed Rulemaking) |
Order
No. 669 (RM05-34-000) |
December 23, 2005 |
Transactions Subject to FPA Section 203 (Final
Rule) |
Order
No. 668 (RM04-12-000) |
December 16, 2005 |
Accounting and Financial Reporting for Public
Utilities Including RTOs (Final Rule) |
Order
No. 661-A
(RM05-4-001) |
December 12, 2005 |
Clarification on Interconnection for Wind Energy
rule (Order on Rehearing) |
Order
No. 667
(RM05-32-000) |
December 8, 2005 |
Repeal of the Public Utility Holding Company
Act of 1935 and Enactment of the Public Utility
Holding
Company Act of 2005 (Final Rule) |
Order
No. 2006-A
(RM02-12-001) |
November 22, 2005 |
Standardization of Small Generator Interconnection
Agreements and Procedures (Order on Rehearing) |
RM05-25-000 |
September 16, 2005 |
Preventing Undue Discrimination and Preference
in Transmission Services |
RM01-12-000 |
July 19, 2005 |
Order Terminating Standard Market Design (SMD)
Proceeding |
PL03-3-006
and AD03-7-006 |
July 6, 2005 |
Order Further Clarifying Policy Statement on
Natural Gas and Electric Price Indices |
Order
No. 2003-C |
June 16, 2005 |
Standardization of Generator Interconnection
Agreements and Procedures, Order on Rehearing
(Final Rule) |
RM04-14-001 |
June 16, 2005 |
Reporting Requirement for Changes in Status For
Public Utilities With Market-Based Rate Authority |
Order
No. 661 |
June 2, 2005 |
Interconnection for Wind Energy (Final Rule) |
Order
No. 658 |
May 27, 2005 |
Modification of Nuclear Plant Decommissioning
Trust Fund Guidelines (Final Rule) |
Order
No. 657 |
May 27, 2005 |
Electronic Filing of the Application for Authorization
for the Issuance of Securities or the Assumption
of Liabilities (Final Rule) |
RM05-17-000 |
May 27, 2005 |
Information Requirements for Available Transfer
Capability |
RM05-16-000 |
May 27, 2005 |
Generator Run Status Information |
Order
No. 2006 |
May 12, 2005 |
Standardization of Small Generator
Interconnection Agreements and Procedures (Final
Rule) |
RM05-5-000 |
May 9, 2005 |
Standards for Business Practices
and Communication Protocols for Public Utilities
(Notice of Proposed Rulemaking) |
Order
No. 652
(RM04-14-000) |
February 10, 2005 |
Reporting Requirement for Changes
in Status For Public Utilities With Market-Based
Rate Authority (Final Rule) |
Order
No. 2003-B |
December 20, 2004 |
Standardization of Generator Interconnection
Agreements and Procedures, Order on Rehearing
and
Directing Compliance (Final Rule) (see Standards of Conduct for Transmission Providers section for more detail) |
EL01-18-000 |
May 19, 2004 |
Order Clarifying Market Behavior
Rules |
Order
No. 2003-A |
March 5, 2004 |
Standardization of Generator Interconnection
Agreements and Procedures (Order on Rehearing)
(Final
Rule) |
EL01-118-000,
EL01-118-001 |
November 17, 2003 |
Market Behavior Rules |
ER03-854-000,
ER03-854-001 |
July 25, 2003 |
Order Accepting Scarcity Pricing
Proposal |
Order
No. 2003 |
July 24, 2003 |
Standardization of Generator Interconnection
Agreements and Procedures (Final Rule) |
RM02-12-000 |
July 24, 2003 |
Standardization of Small Generator
Interconnection Agreements and Procedures |
PL03-3-000 |
July 24, 2003 |
Policy Statement on Natural Gas and
Electric Price Indices |
RT01-87-001 |
December 19, 2001 |
Commission paves way for optimally
sized Midwest RTO |
RT01-67-000 |
March 28, 2001 |
Order Provisionally Granting RTO
Status to GridFlorida |
Order
Directing Staff Investigation [eLibrary] |
July 26, 2000 |
Investigation of Electric Bulk Power
Markets |
Order
No. 638 |
March 9, 2000 |
Errata Notice, Open Access Same
Time Information System and Standards of Conduct
(Final
Rule) |
Order
No. 638 |
February 25, 2000 |
Standards of Conduct (Final Rule) |
Order
No. 2000A
Bookmarked
version |
February 25, 2000 |
Regional Transmission Organization
(RTO) (Order on
Rehearing) (Final Rule) |
Order
No. 2000 (Complete Version)
» Part
1 of 4
» Part
2 of 4
» Part
3 of 4
» Part 4 of 4 |
December 20, 1999 |
Regional Transmission Organization
(RTO). The final rule requires all public utilities
that own, operate or control interstate electric
transmission to file by October 15, 2000, a proposal
for a Regional Transmission Organization (RTO),
or, alternatively, a description of any efforts
made by the utility to participate in an RTO, the
reasons for not participating and any obstacles
to participation, and any plans for further work
toward participation. The RTOs will be operational
by December 15, 2001 (Final Rule) |
ER98-1438-000 |
September 16, 1998 |
Commission Approves Application
of Ten Transmission-owning Public Utilities To
Transfer
Operational Control Of Their Jurisdictional Transmission
Facilities To The Midwest Independent Transmission
Operators |
Order
No. 888-C |
January 20, 1998 |
Promoting Wholesale Competition Through Open Access Non-discriminatory Transmission Services by Public Utilities; Recovery of Stranded Costs by Public Utilities and Transmitting Utilities (Order on Rehearing) |
Order
No. 889-B |
November 25, 1997 |
Open Access Same-Time Information System & Standards of Conduct (OASIS) (Order on Rehearing)
|
Order
No. 888-B |
November 25, 1997 |
Promoting Wholesale Competition Through Open Access Non-discriminatory Transmission Services by Public Utilities; Recovery of Stranded Costs by Public Utilities and Transmitting Utilities (Order on Rehearing)
|
Order
No. 888-A |
March 4, 1997 |
Promoting Wholesale Competition Through Open Access Non-discriminatory Transmission Services by Public Utilities; Recovery of Stranded Costs by Public Utilities and Transmitting Utilities (Order on Rehearing) |
Order
No. 889-A |
March 4, 1997 |
Open Access Same-Time Information System & Standards of Conduct (OASIS) (Order on Rehearing) |
Order No. 889 |
April 24, 1996 |
OASIS: Open Access Same-Time Information
System (formerly Real- Time Information Networks)
and Standards of Conduct (Final Rule) |
Order
No. 888 |
April 24, 1996 |
Transmission Open Access. Promoting
Wholesale Competition Through Open Access Non-discriminatory
Transmission Services by Public Utilities; Recovery
of Stranded Costs by Public Utilities and Transmitting
Utilities (Final Rule) |
ER93-465-006 |
February 10, 1995 |
Order on Rehearing of Policy Issues,
Florida Power and Light |
RM93-19-000 |
November 3, 1994 |
Inquiry Concerning the Commission's
Pricing Policy for Transmission Services Provided
by Public Utilities Under the Federal Power Act |
ER93-465-000 |
February 24, 1994 |
Order on Policy Issues, Florida
Power and Light |
Docket
No. |
Date |
Title |
RM12-11-000 |
December 20, 2012 |
Revisions to the Auxiliary Installations, Replacement Facilities, and Siting and Maintenance Regulations (Notice of Proposed Rulemaking) |
RM13-1-000 |
November 15, 2012 |
Enhanced Natural Gas Market Transparency (Notice of Inquiry) |
RM12-17-000 |
October 18, 2012 |
Revisions to Procedural Regulations Governing Transportation by Intrastate Pipelines (Notice of Proposed Rulemaking) |
RM12-14-000 |
October 18, 2012 |
Annual Charge Filing Procedures for Natural Gas Pipelines (Notice of Proposed Rulemaking) |
Order No. 587-V (RM96-1-037) |
July 19, 2012 |
Standards for Business Practices for Interstate Natural Gas Pipelines (Final Rule) |
RM96-1-037
|
February 16, 2012 |
Standards for Business Practices for Interstate Natural Gas Pipelines (Notice of Proposed Rulemaking) |
Order No. 757
(RM11-4-000) |
January 19, 2012 |
Storage Reporting Requirements of Interstate and Intrastate Natural Gas Companies (Final Rule) |
Order No. 894
(RM11-15-000) |
November 17, 2011 (effective December 23, 2011) |
Bidding by Affiliates in Open Seasons for Pipeline Capacity (Final Rule) |
Order No. 710-C (RM07-9-004) |
August 16, 2011 |
Revisions to Forms, Statements, and Reporting Requirements for Natural Gas Pipelines (Order on Rehearing) |
RM11-15-000 |
April 7, 2011
|
Bidding by Affiliates in Open Seasons for Pipeline Capacity Notice of Proposed Rulemaking (Notice of Proposed Rulemaking) |
Order No. 710-B (RM07-9-003) |
January 20, 2011
(effective February 25, 2011) |
Revisions to Forms, Statements, and Reporting Requirements for Natural Gas Pipelines (Final Rule) |
RM11-4-000 |
December 16, 2010 |
Storage Reporting Requirements of Interstate and Intrastate Natural Gas Companies (Notice of Inquiry) |
Order No. 735-A
(RM09-2-001) |
December 16, 2010
(effective April 1, 2011) |
Contract Reporting Requirements of Intrastate Natural Gas Companies (Order on Rehearing) |
RM11-1-000 |
October 21, 2010 |
Capacity Transfers on Intrastate Natural Gas Pipelines (Notice of Inquiry) |
RM05-1-003 |
August 26, 2010 |
Regulations Governing the Conduct of Open Seasons for Alaska Natural Gas Transportation Projects (Order Denying Clarification And Rehearing) |
Order No. 720-B
(RM08-2-002) |
July 21, 2010
(effective October 01, 2010) |
Pipeline Posting Requirements under Section 23 of the Natural Gas Act (Order on Rehearing and Clarification) |
Order No. 704-C (RM07-10-002) |
June 17, 2010
(effective September 30, 2010) |
Transparency Provisions of Section 23 of the Natural Gas Act (Order Granting Clarification) |
RM07-9-003 |
June 17, 2010 |
Revisions to Forms, Statements, and Reporting Requirements for Natural Gas Pipelines (Notice of Proposed Rulemaking) |
Order No. 735
Appendix
(RM09-2-000) |
May 20, 2010
(effective April 1, 2011) |
Contract Reporting Requirements of Intrastate Natural Gas Companies (Final Rule) |
Order No. 2005-B
(RM05-1-001) |
March 18, 2010
(effective April 28, 2010) |
Regulations Governing the Conduct of Open Season for Alaska Natural Gas Transportation Projects (Final Rule) |
Order No. 720-A
(RM08-2-001) |
January 21, 2010 |
Pipeline Posting Requirements under Section 23 under Natural Gas Act (Order on Rehearing and Clarification) |
RM09-2-000
|
July 16, 2009 |
Revision of contract reporting requirements of Intrastate Natural Gas Companies (Notice of Proposed Rulemaking) |
Order No. 712-B
(RM08-1-002, RM07-4-000 and RM06-21-000) |
April 16, 2009 |
Promotion of a more efficient capacity release Market (Order on rehearing and clarification) |
Order No. 704-B
(RM07-10-002) |
December 18, 2008 |
Transparency Provisions of Section 23 of the Natural Gas Act (Order on Rehearing and Clarification) |
Order No. 712-A
(RM08-1-001) |
November 21, 2008 |
Promotion of a More Efficient Capacity Release Market (Order on Rehearing) |
RM09-2-000 |
November 20, 2008 |
Contract Reporting Requirements of Intrastate Natural Gas Companies (Notice of Inquiry) |
Order No. 720
(RM08-2-000) |
November 20, 2008 |
Pipeline Posting Requirements under Section 23 under Natural Gas Act (Final Rule) |
RM96-1-029
|
September 18, 2008 |
Standards for Business Practices of Interstate Natural Gas Pipelines (Notice of Proposed Rulemaking) |
Order No. 704-A
(RM07-10-001) |
September 18,2008 |
Transparency Provisions of Section 23 of the Natural Gas Act (Order on Rehearing and Clarification) |
Order No. 710-A (RM07-9-001) |
June 20, 2008 |
Revisions to Forms, Statements, and Reporting Requirements for Natural Gas Pipelines |
Order No. 712 (RM08-1-000) |
June 19, 2008 |
Promotion of a More Efficient Capacity Release Market (Final Rule) |
Order No. 710 (RM07-9-000) |
March 21, 2008 |
Revisions to Forms, Statements, and Reporting Requirements for Natural Gas Pipelines (Final Rule) |
Order No. 686-C
(RM06-7-003) |
January 17, 2008 |
Revisions to the Blanket Certificate Regulations and Clarification Regarding Rates (Order Denying Rehearing) |
RM08-2-000 |
December 21, 2007 |
Pipeline Posting Requirements under Section 23 under Natural Gas Act (Notice of Proposed Rulemaking) |
RM08-1-000 |
November 15, 2007 |
Promotion of a More Efficient Capacity Release Market (Notice of Proposed Rulemaking) |
Order No. 700 (RM07-17-000) |
October 18, 2007 |
Revisions to Landowner Notification and Blanket Certificate Regulations (Final Rule) |
RM07-9-000 |
September 20, 2007 |
Revisions to Forms, Statements, and Reporting Requirements for Natural Gas Pipelines (Notice of Proposed Rulemaking) |
Order No. 686-B
(RM06-7-002) |
September 20, 2007 |
Revisions to the Blanket Certificate Regulations and Clarification Regarding Rates (Order on Rehearing) |
Order No. 698
(RM96-1-027) |
June 25, 2007 |
Standards for Business Practices for Interstate Natural Gas Pipelines; Standards for Business Practices for Public Utilities (Final Rule) |
Order No. 686-A
(RM06-7-001) |
June 22, 2007 |
Revisions to the Blanket Certificate Regulations and Clarification Regarding Rates (Order on Rehearing) |
RM07-17 |
June 22, 2007 |
Revisions to Landowner Notification and Blanket Certificate Regulations (Notice of Proposed Rulemaking) |
RM07-10-000 |
April 19, 2007 |
Transparency Provisions of Section 23 of the Natural Gas Act; Transparency Provisions of the Energy Policy Act
(Notice of Proposed Rulemaking) |
RM07-1-000
|
January 18, 2007 |
Standards of Conduct for Transmission Providers (Notice of Proposed Rulemaking) |
Order 678-A
(RM05-23-001 and AD04-11-001) |
November 16, 2006 |
Rate Regulation of Certain Natural Gas Storage Facilities (Order on Clarification and Rehearing) |
RM96-1-027
and RM05-5-001 |
October 25, 2006 |
Standards for Business Practices for Interstate Natural Gas Pipelines
and Public Utilities (Notice of Proposed Rulemaking) |
Order
No. 687
(RM06-1-000) |
October 19, 2006 |
Regulations Implementing the Energy Policy Act
of 2005; Coordinating the Processing of Federal
Authorizations for Applications under Sections
3
and 7 of the Natural Gas Act and Maintaining a Complete Consolidated Record (Final
Rule) |
Order
No. 686
(RM06-7-000) |
October 19, 2006 |
Revisions to the Blanket Certificate Regulations and Clarification
Regarding Rates (Final Rule) |
Order
No. 682
(RM06-18-000) |
August 23, 2006 |
Revision of Regulations to Require Reporting
of Damage to Natural Gas Pipeline Facilities (Final Rule) |
Order
No. 678 (RM05-23-000 & AD04-11-000) |
June 19, 2006 |
Rate Regulation of Certain Natural Gas Storage
Facilities (Final Rule) |
RM06-7-000 |
June 16, 2006 |
Revisions to the Blanket Certificate Regulations
and Clarification Regarding Rates (Notice of Proposed Rulemaking) |
RM06-1-000 |
May 18, 2006 |
Regulations Implementing the Energy Policy Act
of 2005: Coordinating the Processing of Federal
Authorizations for Applications under Sections
3 and 7 of the Natural Gas Act and Maintaining
a Complete
Consolidated Record (Notice of Proposed Rulemaking) |
RM06-14-000 |
February 16, 2006 |
Revisions to Record Retention Requirements for
Unbundled Sale Service, Person Holding Blanket
Marketing
Certificates, and Public Utility Market-Based Rate
Authorization Holders (Notice of Proposed Rulemaking) |
Order
No. 673 (RM06-5-000) |
February 16, 2006 |
Amendments to Codes of Conduct for Unbundled
Sales Service and for Persons Holding Blanket
Marketing
Certificates (Final Rule) |
RM05-23-000
and AD04-11-000 |
December 22, 2005 |
Rate Regulation of Certain Underground Storage
Facilities (Notice of Proposed Rulemaking) |
Order
No. 2005-A (RM05-1-001) |
June 1, 2005 |
Regulations Governing the Conduct of Open Seasons
for Alaska Natural Gas Transportation Projects
(Order on Rehearing) |
RM05-12-000 |
May 27, 2005 |
Modification of Natural Gas Reporting Regulations (Notice of Proposed Rulemaking) |
Order
No. 587-S
(RM96-1-026) |
May 9, 2005 |
Standards for Business Practices
of Interstate Natural Gas Pipelines, as corrected
by errata
notice issued June 14, 2005 (Final Rule) |
Order
No. 2005
(RM05-1-000) |
February 9, 2005 |
Regulations Governing the Conduct
of Open Seasons for Alaska Natural Gas Transportation
Projects |
Order
No. 644 (RM03-10-001) |
May 19, 2004 |
Order on Clarification of Code of
Conduct to Jurisdictional Sellers (Final Rule) |
Order
No. 644 (RM03-10-000) |
November 17, 2003 |
Code of Conduct to Jurisdictional
Sellers (Final Rule) |
Order
No. 637-B
|
July 26, 2000 |
Order Denying Rehearing Concerning
Regulation of Short-Term Natural Gas Transportation
Services (Final Rule) |
Order
No. 637-A |
May 19, 2000 |
Order on Rehearing, Rehearing of
Short-term Natural Gas Transportation Services,
and Regulation of Interstate Natural Gas Transportation
Services (Final Rule) |
Order
No. 637 |
February 9, 1999 |
Regulation of Short-term Natural
Gas Transportation Services, and Regulation of
Interstate
Natural Gas Transportation Services (Final Rule) |
Order No. 582 |
September 28, 1995 |
Filing And Reporting Requirements For Interstate Natural Gas Company Rate Schedules And Tariffs (Final Rule)
|
Order
No. 636-C |
November 27, 1992 |
Order Denying Rehearing and Clarifying
Orders 636 and 636-A (Order on Rehearing)
|
Order
No. 636-B |
November 27, 1992 |
Order Denying Rehearing and Clarifying
Orders 636 and 636-A (Order on Rehearing)
|
Order
No. 636-A |
August 3, 1992 |
Denying Rehearing in Part, Granting
Rehearing in Part and Clarifying Order 636 (Order on Rehearing) |
Order
No. 636 |
April 9, 1992 |
Restructuring of Interstate Natural
Gas Pipeline Services (Final Rule) |
Docket
No. |
Date |
Title |
Order No. 774
(RM11-6-000) |
January 17, 2013 |
Annual Charges for Use of Government Lands (Final Rule) |
RM11-6-000 |
November 17, 2011 |
Annual Charges for Use of Government Lands (Notice of Proposed Rulemaking) |
RM11-06-000 |
February 17, 2011 |
Annual Charges for Use of Government Lands (Notice of Inquiry) |
RM07-8-000 |
February 15, 2007 |
Preliminary Permits for Wave, Current, and Instream New Technology Hydropower Projects (Interim Statement of Policy) |
PL06-5-000 |
September 21, 2006 |
Policy statement on hydropower licensing settlements |
Order
No. 655 |
May 27, 2005 |
Modification of Hydropower Procedural Regulations,
Including the Deletion of Certain Outdated or
Non-essential
Regulations (Final Rule) |
Order
No. 2002 |
July 23, 2003 |
Hydroelectric Licensing (Final Rule) |
Order
No. 635 |
July 23, 2003 |
Policy Statement on Consultation
with Indian Tribes in Commission Proceedings (Final
Rule) |
Order
No. 596 |
October 29, 1997 |
Alternative Hydropower Licensing
Process (Final Rule) |
Docket
No. |
Date |
Title |
RM12-15-000 |
October 18, 2012 |
Filing, Indexing and Service Requirements for Oil Pipelines (Notice of Proposed Rulemaking) |
Order No. 767 (RM11-21-000) |
September 20, 2012 |
Revision Form No. 6 (Final Rule) |
RM12-18-000 |
September 20, 2012 |
Revision to Page 700 of FERC Form No. 6 (Notice of Proposed Rulemaking) |
RM10-25-000 |
December 16, 2010 |
Five-Year Review of Oil Pipeline Pricing Index |
RM10-25-000 |
June 15, 2010 |
Five-Year Review of Oil Pipeline Pricing Index (Notice of Inquiry) |
RM05-22-000 |
March 21, 2006 |
Five-Year Review of Oil Pipeline Pricing Index |
Order
No. 656 |
May 27, 2005 |
Revision of FERC Form No. 73, Oil Pipeline Data
Filing Instructions (Final Rule) |
Order
No. 650 |
August 27, 2004 |
Revisions to Oil Pipeline Regulations
Pursuant to the Energy Policy Act of 1992 (Final
Rule) |
Order
No. 634-A |
October 23, 2003 |
Final Rule Regarding Regulation of
Cash Management Practices |
Order
No. 634 |
June 26, 2003 |
Interim Rule Regarding Regulation
of Cash Management Practices |
RM00-11-000 and RM00-11-001 |
February 24, 2003 |
Five-Year Review of Oil Pipeline Pricing Index |
Order
No. 588 |
July 19, 1996 |
Oil Pipeline Cost-of-Service Filing
Requirements (Final Rule) |
Order
No. 572 |
October 28, 1994 |
Market-based Ratemaking for Oil Pipelines
(Final Rule) |
Order
No. 572-A |
December 28, 1994 |
Market-based Ratemaking for Oil Pipelines
(Final Rule) (Order denying rehearing) |
Order
No. 571 |
October 28, 1994 |
Cost-of-Service Filing Requirements
for Oil Pipelines (Final Rule) |
Order
No. 571-A |
October 28, 1994 |
Cost-of-Service Filing Requirements
for Oil Pipelines (Final Rule) |
Order No. 561-A |
July 28, 1994 |
Pipeline Regulations Pursuant to the Energy Policy Act of 1992 (Rehearing) |
Order
No. 561 |
October 22, 1993 |
Pipeline Regulations Pursuant to
the Energy Policy Act of 1992 (Final Rule) |
Order
No. 154-C |
December 5, 1985 |
Order Denying Rehearing in Part,
Modifying Opinion 154-B in Part, Clarifying That
Opinion,
and Denying Stay |
Order
No. 154-B |
June 28, 1985 |
Trended Original Cost Model (TOC) |
|