Advanced Search
Demolition of MO-840 in 200 East Area
MO-405 during demolition
Demolishing the 2734-E Gas Cylinder Storage Building
209-E CAR door open
284-E coal silo after demolition
Explosive demolition in 200 East Area
284-E coal silo before demolition
Explosives lower 2902-E water tower
Demolition of 284-E building begins
Demolishing the 284-E Power House 3-18-11
284-E Power House in late March 2011
Debris cleanup at 284-E site
284-E Power House Cleared
A random sampling of photo tags throughout the site.