Hanford Site Standards |
Rev-Change |
Effective |
DOE Safety Standards page |
|
|
Prohibited Items on the Hanford Site
|
|
|
Special Notices / Directives |
Rev-Change |
Effective |
PRC-PRO-EM-40318, Upset Condition Notification Process
|
0-0 |
06/28/10 |
Occupational Safety & Industrial Hygiene |
Rev-Change |
Effective |
DOE-0336, Hanford Site Lockout/Tagout |
1A |
12/08/11 |
DOE-RL-92-36, Hanford Hoisting & Rigging Manual |
|
|
DOE-0342, Hanford Site Chronic Beryllium Disease Prevention Program (CBDPP) |
1 |
05/14/09 |
DOE-0342-001, Hanford Site Beryllium Work Permit (BWP) and Hazard Assessment Procedure |
0 |
07/30/12 |
DOE-0343, Stop Work
|
2 |
12/01/09 |
DOE-0344, Hanford Site Excavating, Trenching and Shoring |
2A |
|
DOE-0346, Hanford Site Fall Protection Program (HSFPP) |
0 |
|
DOE-0352, Hanford Site Respiratory Protection Program |
|
10/1/12 |
DOE-0359, Hanford Site Electrical Safety Program (HSESP) |
2 |
11/14/12 |
DOE-0360, Hanford Site Confined Space Procedure (HSCSP) |
0A |
|
PRC-CHRT-SH-9982, Presidents' and Employee Zero Accident Councils |
0-3 |
03/20/12 |
PRC-GD-SH-29950, Human Performance Culpability Matrix |
0-1 |
05/26/09 |
PRC-PRO-SH-095, Scaffolding |
3-0 |
08/01/12 |
PRC-PRO-SH-104, Aviation Safety Program |
0-2 |
11/14/11 |
PRC-PRO-SH-105, Steam Generation and Distribution System Safety |
0-2 |
02/11/11 |
PRC-PRO-SH-121, Heat Stress Control |
0-6 |
01/24/13 |
PRC-PRO-SH-409, Industrial Hygiene Monitoring, Reporting and Records Management |
2-0 |
01/28/13 |
PRC-PRO-SH-6155, Implementation of the Hanford Site Chronic Beryllium Disease Prevention Program (CBDPP) |
2-1 |
12/12/12 |
PRC-PRO-SH-7085, Safety Responsibilities |
0-4 |
08/06/12 |
PRC-PRO-SH-10321, Walking/Working Surfaces |
1-1 |
01/04/12 |
PRC-PRO-SH-10648, Automated External Defibrillators |
2-0 |
06/15/12 |
PRC-RD-SH-11058, Occupational Medical Qualification and Monitoring |
0-2 |
02/22/11 |
PRC-RD-SH-15097, Asbestos Control - Construction Industry |
0-3 |
07/25/11 |
PRC-RD-SH-15245, Asbestos Control - General Industry |
0-2 |
02/11/11 |
PRC-PRO-SH-17916, Industrial Hygiene Baseline Hazard Assessments |
1-1 |
08/21/10 |
PRC-PRO-SH-28034, Adverse Weather |
1-0 |
08/02/11 |
PRC-PRO-SH-40410, Hazard Communication Program |
0-1 |
05/08/12 |
PRC-PRO-SH-40445, Tags, Signs and Barriers |
0-0 |
02/01/12 |
PRC-PRO-SH-40461, Safety Communications |
0-0 |
02/29/12 |
PRC-PRO-SH-40463, Ergonomics |
0-1 |
04/20/12 |
PRC-PRO-SH-40464, Safety Showers and Eyewashes |
0-0 |
03/26/12 |
PRC-PRO-SH-40469, Occupational Carcinogen Control |
0-0 |
04/04/12 |
PRC-PRO-SH-40473, Motor Vehicles, Heavy Equipment and Bicycles |
0-1 |
11/06/12 |
PRC-PRO-SH-40479, Occupational Noise Exposure and Hearing Conservation |
0-0 |
04/19/12 |
PRC-PRO-SH-40481, Storing, Using and Handling Compressed Gases |
0-0 |
07/26/12 |
PRC-PRO-SH-40498, Occupational Lead Exposure Control |
0-0 |
07/23/12 |
PRC-PRO-SH-40499, Safety and Health Inspections |
0-0 |
08/13/12 |
PRC-RD-SH-10972, Elevating Work Platforms |
1-2 |
07/13/11 |
PRC-MP-TQ-011, Qualification and Training Plan |
1-5 |
07/25/11 |
PRC-PRO-IRM-309, Controlled Software Management |
2-0 |
06/29/12 |
PRC-RD-SH-11183, Personal Protection |
1-2 |
07/03/12 |
PRC-STD-SH-40314, Portable and Fixed Ladder Standard
|
0-1 |
03/01/12 |
Quality Assurance/Suspect/Counterfeit Items |
Rev-Change |
Effective |
Managing Suspect and Counterfeit Items (SCI) in the Nuclear Industry; International Atomic Energy Agency Guide |
|
8/00 |
ASME B30.26 Rigging Hardware and ASME B30.10 Hook Identification Requirements |
|
|
SCI - Awareness Training |
6 |
6/07 |
Help Stamp Out Suspects/Counterfeits
|
|
|
Radiation |
Rev-Change |
Effective |
CHPRC-00073, Radiological Control Manual
|
7-0 |
10/12 |
Fire Protection |
Rev-Change |
Effective |
MSC-RD-8589, Hanford Fire Marshal Permits |
1 |
07/16/10 |
PRC-PRO-FP-40421, Hot Work |
0-0 |
10/27/11 |
PRC-STD-FP-40404, Fire Protection Program
|
0-3 |
12/03/12 |
Other CHPRC Documents |
Rev-Change |
Effective |
PRC-GD-WKM-17132, Automated Job Hazards Analysis Process Guide |
1-3 |
11/09/11 |
PRC-MP-SH-32219, 10 CFR-851 CHPRC Worker Safety and Health Program Description |
1-3 |
12/05/12 |
PRC-POL-SH-5053, CH2M HILL Plateau Remediation Company Safety, Health, Security, Quality, and Environmental Policy |
0-2 |
04/23/10 |
PRC-PRO-EM-060, Reporting Occurrences and Processing Operations Information |
3-1 |
07/03/12 |
PRC-PRO-EN-440, Engineering Documentation Preparation and Control |
1-1 |
06/20/11 |
PRC-PRO-SH-11166, Control of Working Hours and Working Alone |
1-0 |
03/20/12 |
PRC-PRO-SH-40078, Contractor Safety Processes |
1-7 |
03/12/12 |
PRC-PRO-WKM-079, Job Hazard Analysis |
5-1 |
05/09/12 |
PRC-PRO-WKM-12115, Work Management
|
2-0 |
01/30/12 |
Endorsed Documents |
Rev-Change |
Effective |
MSC-PRO-37561, Department of Transportation Federal Motor Carrier Safety Management Plan |
3 |
1/10/12 |
MSC-PRO-066, Electrical Utilities Lock and Tag Program |
0 |
11/11/09 |
MSC-RD-8589, Hanford Fire Marshal Permits
|
1 |
07/16/10 |
Employee Job Task Analysis |
Rev-Change |
Effective |
EJTA Form (Instructions; DOCx , PDF ) |
|
|
EJTA Templates (13 Files, 3.6MB) |
|
|
Medical Scheduling Process and Forms |
|
|
Beryllium Medical Monitoring web site |
|
|
Beryllium Hazard Brochure
|
|
|
Forms |
Rev |
Effective |
A-6000-895, Hot Work Permit |
5 |
06/14/11 |
A-6002-294, Significant Discharge Log |
01/98 |
11/30/05 |
A-6003-061, Contractor Document Submittal Form (CDSF) Instructions |
6 |
06/08/10 |
Open in Word: Form |
A-6003-609, Hanford Site Oversize/Overweight Permit Instructions |
5 |
09/17/12 |
A-6004-055, Enhanced Pre-Work Walk Down and Post Performance Checklist |
3 |
01/22/08 |
A-6004-286, Fall Protection Work Permit Instructions |
5 |
03/13/12 |
Open in Word: Form |
A-6004-602, Radiological Work Permit |
1 |
01/28/13 |
Open in Word: Form |
A-6004-634, ALARA Management Worksheet (AMW) |
6 |
05/17/11 |
Open in Word: Form |
A-6004-654, Radiological Hazard Screening Criteria |
7 |
05/16/11 |
Open in Word: Form |
A-6004-660, Portable Ladder Use Permit |
0 |
02/03/09 |
A-6004-747, Asbestos Work Permit |
1 |
05/04/10 |
Open in Word: Form |
A-6004-750, Chemical Inventory Worksheet |
1 |
09/01/10 |
Open in Word: Form |
A-6004-757, CHPRC Contractor Document Submittal Form Instructions |
4 |
09/07/11 |
Open in Word: Form |
A-6004-783, Craft-Specific Job Safety Analysis/Position Hazard Analysis |
0 |
04/14/09 |
Open in Word: Form |
A-6004-784, Job Hazard Analysis/Activity Hazard Analysis (JSA/ASA) For Subcontractors |
7 |
02/06/13 |
Open in Word: Form |
A-6004-785, Task-Specific Job Safety analysis |
2 |
02/28/12 |
Open in Word: Form |
A-6004-799, Energized Electrical Work Permit |
1 |
03/08/10 |
Open in Word: Form |
A-6004-820, Change Form Instructions |
2 |
02/23/11 |
Open in Word: Form |
A-6004-822, Construction Daily Activity Report |
0 |
04/23/09 |
Open in Word: Form |
A-6004-833, Contractor-originated Request for Clarification Instructions |
3 |
12/01/09 |
Open in Word: Form |
A-6004-952, Pre-Job Briefing Checklist Instructions |
8 |
03/26/12 |
Open in Word: Form |
A-6004-967, Work Release for Construction Service Organization Instructions |
2 |
03/22/11 |
Open in Word: Form |
A-6005-614, EPC Pre-Job Briefing Addendum Instructions |
3 |
10/11/12 |
Open in Word: Form |
A-6005-717, Hanford Confined Space Entry Permit Instructions |
1 |
12/17/12 |
Open in Word: Form |
A-6005-724, Hanford Confined Space Hazard Identification Instructions |
1 |
05/01/12 |
Open in Word: Form |
A-6005-785, Pre-Job Safety Walkdown |
0 |
10/19/10 |
A-7400-373, Hanford Site Excavation Permit Instructions
|
7 |
04/07/11 |