Advanced Search
Asbestos abatement on 224-U building
Chemical inventory inside U Canyon
Walkdown of 6652-I building
Biological hazard cleanup of 6652-M, 6652-M and 6652-J buildings
Preparing the work site on upper ALE
Preparing for demolition on upper ALE
Loading Cell 2 at U Canyon (May 2010)
Workers load Cell 2 at U Canyon (Feb 2010)
224-U Asbestos preparations (Feb 2010)
Asbestos abatement in the lower 1706KE structures (June 2010)
Opening a wall into the K East Reactor Building
Preparing for a grout pour
D-10 tank shipment
U Canyon final grout
Slab tank removal at 209-E
A random sampling of photo tags throughout the site.