209-E CAR door open

Workers observe the entrance into the Criticality Assembly Room in the 209-E Criticality Mass Laboratory. Opening the 2.5-foot-thick steel, motor-operated door was an important step in CH2M HILL's Recovery Act-funded effort to begin preparing the facility for demolition.

Image tags: arra, recovery act, 200 east, 200e, criticality mass laboratory, 209-e, demolition preparations, criticality assembly room, car