Demolition of the basin of the 212-R interim fuel storage basin

After demolishing the above-ground structures of the 212-R interim fuel storage building, CH2M HILL workers began demolition of the below-ground basin.

Image tags: arra, recovery act, d4, during, 200 north, basin, during demolition, 212-npr, 200 n, demoiltion, 212-r