Demolition of the 212-R interim fuel storage building in July 2009

The 212-R interim fuel storage building during demolition in July 2009. This building, as well as 212-N and 212-P, was used to store reactor fuel for up to three month suntil it had radioactively decayed enough to be transferred to separation facilities for reprocessing.

Image tags: arra, recovery act, demolition, d4, during, 200 north, 212-npr, 200 n, 212-r