183.1KW Headhouse demolition begins (Feb 2010)

An excavator shear removes structures from the roof of the 183.1KW Headhouse. Demolition began during the week of Feb. 22, 2010 and within days, the entire 16,900-square-foot building was a pile of debris.

Image tags: arra, recovery act, demolition, 100k, kw, decommissioning and demolition, sedimentation basin, d4, during, k west, headhouse, 183kw, 183.1