183.2KW Sedimentation Basin demolition
Inside bay 1 of the 183.2KW sedimentation basin
183KW chlorine vault slab demolition
183.2KW Sedimentation Basin debris removal
183KW chemical storage silo demolition
183KW Sedimentation Basin Complex before demolition
Entering the 183.2KW Sedimentation Basin
183.1KW Headhouse demolition begins (Feb 2010)
183.1KW Headhouse after demolition (March 2010)
183.3KW Filter Basin demolition (April 2010)
183.6KW Lime Feeder Building during demoliion (April 2010)
183.3KW Filter Basin demolition (June 2010)
183.7KW Pipe Tunnel demolition
183KW Sedimentation Basin Demolition (April 2010)
Removing 183.1KW Headhouse substructures
183.7KW Pipe Tunnel during demolition
Removing soil beneath 183KW Headhouse