Sludge treatment preparation at MASF
Sludge treatment training
Removing cover plates to transformer box
Installing port to grout box containing transformer
Removing the lid from transformer box
Training at T Plant
Nuclear chemical operators in training at T Plant
Loading Box 29
Foundation for the Container Maintenance Facility
Hand-excavation of Box 5 and 8
Inspecting a waste shipment
Mixed low-level waste shipment (January 2010)
Shipment of mixed low-level waste (January 2010)
Mock-up for working with Boxes 80 and 82
Preparing to lift a waste box from a trench
Survey of the lid of Box 82
Construction of the Container Maintenance Facility
Roll-on/roll-off waste container
Super dump truck unloads at the Environmental Restoration Disposal Facility
Transporting Toxic Substances Control Act low-level waste to staging area
Surveying a super dump truck
Directing a lift from the TV7 vault
Night-time TRU retrieval from vaults
TRU shipments resume
Preparing Box 82 for removal (Jan 2010)
Mixed low-level waste secured for shipment
Preparing for waste retrieval
Preparing to lift Box 3 (July 2010)
Setting Box 3 on the ground (July 2010)
Lifting TRU waste cover box
Contents of Box 82
Box 82 base removed
Ground-penetrating radar scanning
Next generation in waste retrieval technology
Staged TRU waste drums
Lifting a box from 4B Trench 11
Labeling drum of TRU waste
Mixed low-level waste loaded for shipment
Lifting a box of transuranic waste
Waste covered with container for shipment
A random sampling of photo tags throughout the site.
Environmental Policy | Legal Info
© 2010 CH2M Hill Plateau Remediation. All Rights Reserved.