Advanced Search
183.1KW Headhouse demolition begins (Feb 2010)
183.1KW Headhouse after demolition (March 2010)
Remediation in the 100K Area (June 2010)
Removing 183.1KW Headhouse substructures
Remediation beneath the 183K West Headhouse (June 2010)
Removing soil beneath 183KW Headhouse
183-KE headhouse demolition
Headhouse debris loaded for disposal
A random sampling of photo tags throughout the site.