183KW Sand Filter demolition continues

Demolition and loadout of debris continues on the west side of the 183.3-KE Sand Filters, part of the K East Sedimentation Basins that once held 19 million gallons of water for use in the K East Reactor system.

Image tags: arra, recovery act, demolition, 100k, k east, ke, decommissioning and demolition, river corridor, sand filter, 183-3