Advanced Search
Separating 284-W baghouses
Planning to lower the 284-W exhaust stacks
284-W chimneys marked for charges
Separating 284-W structures
Preparing Power House structures for demolition
Preparing two chimneys for demolition
284-W chimneys and baghouses isolated
Isolating 284-W baghouses
284-W baghouses prepped for demolition
284-W baghouse debris
284-W structures explosive demolition begins
284-W structures during explosive demolition
284-W structures after explosive demolition
Remains of 284-W chimneys and baghouses
Crew watches explosive demolition
284-E coal silo after demolition
Explosive demolition in 200 East Area
284-E coal silo before demolition
Explosives lower 2902-E water tower
Demolition of 284-E building begins
Demolishing the 284-E Power House 3-18-11
284-E Power House in late March 2011
Debris from the 284-W explosive demolition
Cleanup at the 284-W site April 2011
Demolishing the 284-W conveyor
Debris cleanup at 284-E site
284-E Power House Cleared
A random sampling of photo tags throughout the site.