Excavation beneath the K East fuel storage basin
Applying fixative to the site of the former K East fuel storage basin
110KE gas storage facility before demolition
Lifting the roof of the 117KE exhaust air filter building
110KE Gas Storage Facility during demolition
1706KE buildings during demolition
Demolition of K East fuel storage basin nears completion
Demolition of the K East fuel storage basin March 2009
K East fuel storage basin demolition May 2009
Removal of K East ion exchange and sand filters
K East core boring (May 2010)
Core boring at 4th location (June 2010)
Asbestos abatement in the lower 1706KE structures (June 2010)
Remains of the 116KE Reactor Exhaust Stack
Lowering the 116KE Reactor Exhaust Stack
Detonation at the base of 116KE Reactor Exhaust Stack
Placing explosives for the 116KE Reactor Exhaust Stack
Demolition of 115KE building beings
Demolition of the 115KE Building continues
Demolishing the 115KE building
Aerial of the 100K-East Area (9-10-10)
Opening a wall into the K East Reactor Building
117KE Exhaust Air Filter building before demolition
117KE filter removed
Demolition of 105-KE admin area
Draining the K East sedimentation basins
K East sedimentation basins drained
Aerial of the 183KE Sedimentation Basins
Clearwell demolition begins
K East Clearwell demolition
Equipment enters K East Clearwell
Northwest corner of the 183KE Sedimentation Basin
183-KE headhouse demolition
Clearwell D&D nearly complete
Headhouse debris loaded for disposal
183KE sand filter demolition
183KW Sand Filter demolition continues
181-KE Pumphouse demolition nears completion
183.3KE Filter Basin demolition
183-KE Sedimentation Basin demolition
A random sampling of photo tags throughout the site.
Environmental Policy | Legal Info
© 2010 CH2M Hill Plateau Remediation. All Rights Reserved.