Advanced Search
Well drilling along the Columbia River
Excavation beneath the K East fuel storage basin
Applying fixative to the site of the former K East fuel storage basin
Installing a well casing
Cleaning a well casing
Sampling 200 North Area waste sites
Sampling the 216-S-19 waste site
Aerial survey of BC Control Area
Bonding high-density polyethylene piping for the DX Groundwater Treatment Facility
Steel skeleton for the DX Groundwater Treatment Facility
Well pad construction in the 100 D Area
Sampling along the Columbia River
Remediation in the BC Control Area April 2010
Decommissioned well hole before grouting
Remediation at 600-40 waste site (April 2010)
Surveying at BC Control Area (April 2010)
HX Construction site July 2010
100-HX concrete slab
100-HX construction Oct 2010
100-HX steel Sept 2010
100-HX exterior April 2011
100-HX siding March 2011
100-HX equipment installation
100-HX operator
100-HX inspector
100-HX inspector checks equipment
100-hx gauges
100-HX interior
100-HX interior equipment
100-hx resin trains
100-HX monitoring device
100-K-63 waste site sampling
Vapor off-gas assembly
Closeup of groundwater treatment resin
New resin delivers savings
Engineers optimize groundwater treatment
A random sampling of photo tags throughout the site.