Advanced Search
Chemical inventory inside U Canyon
Application of fixative to equipment on U Canyon deck
Applying fixative to the U Canyon rail tunnel
Relocating equipment into U Canyon process cells
Inside U Canyon
Prepaing U Canyon equipment for relocation
Loading Cell 2 at U Canyon (May 2010)
Workers load Cell 2 at U Canyon (Feb 2010)
Worker at the site of 224-U demolition
Operator at 224-U demolition
Scenic of 224-U during demolition
224-U building during demolition (June 2010)
Close-up on 224-U building demolition (June 2010)
224-U demolition close-up (June 2010)
224-U ancillary facility demolition continues (June 2010)
Demolition of the 224-U ancillary facility (June 2010)
Relocating equipment in U Canyon June 2010
D-10 tank shielding
Grout tube cleaning
Preparing for a grout pour
D-10 tank shipment
U Canyon final grout
Grouting U Canyon
A random sampling of photo tags throughout the site.