Demolition of the 211-U ancillary facilities
211-UA ancillary tanks before demolition
Chemical inventory inside U Canyon
211-UA tanks after demolition
Demolition of the 212-N interim fuel storage basin
212-NPR interim fuel storage building debris
212-P interim fuel storage building during demolition
Walls of the 212-P interim fuel storage buildings during demolition
Aerial of the 212-R interim fuel storage building
Demolition of the basin of the 212-R interim fuel storage basin
212-R interim fuel storage building during demolition
Demolition of the 212-R interim fuel storage building in July 2009
110KE Gas Storage Facility during demolition
1706KE buildings during demolition
Size reducing tools used in the K West Basin
ALE debris pile removal
6652-I building during demolition
6652-S building before demolition
6652-S building during demolition
Walkdown of 6652-I building
Biological hazard cleanup of 6652-M, 6652-M and 6652-J buildings
6652-D before demolition
Preparing the work site on upper ALE
Preparing for demolition on upper ALE
6652-T Fire Protection Lower Pump House during demolition
6652-T Fire Protection Lower Pump House before demolition
6652-T Fire Protection Lower Pump House after demolition
6652-C Shed before demolition
6652-C Shed during demolition
646 Building debris
6652-G Field Storage Building debris
6652-G Field Storage Building during demolition
Aerial of Lower ALE Reserve after demolition
Demolishing lower ALE facility foundations
Lower Arid Lands Ecology Reserve
212-NPR Buildings before demolition
212-NPR Buildings after demolition
Demolition of MO-840 in 200 East Area
183.1KW Headhouse demolition begins (Feb 2010)
183.1KW Headhouse after demolition (March 2010)
183.3KW Filter Basin demolition (April 2010)
183.6KW Lime Feeder Building during demoliion (April 2010)
183.3KW Filter Basin demolition (June 2010)
183.7KW Pipe Tunnel demolition
224-U ancillary facility demolition continues (June 2010)
Demolition of the 224-U ancillary facility (June 2010)
Demolition of the 183KW Sedimentation Basin(December 2009)
Aerial of 183KW Sedimentation Basin (January 2010)
Close-up of 183KW Sedimentation Basin demolition (January 2010)
Demolition of the 183K West Filter Basin (April 2010)
Demoliton of the 183K West Sedimentation Basin (May 2010)
Remediation beneath the 183K West Headhouse (June 2010)
Demolition of the 183K West Sand Filter (June 2010)
Demolition of the 183K West Filter Basin (July 2010)
Demolition of the 183K West Sedimentation Basin (August 2010)
Aerial of 183K West Sedimentation Basin (September 2010)
Completing demolition of the 183KW Sedimentation Basin (October 2010)
Water truck at D&D of 183KW Sedimentation Basin (October 2010)
Last of the 183KW Sedimentation Basin D&D (October 2010)
Debris from the 183K West Sedimentation Basin (October 2010)
A random sampling of photo tags throughout the site.