183.3KW Filter Basin demolition (April 2010)

Demolition of the 183.3KW Filter Basin is in progress. The filter basin was used to remove unsettled and small, suspended particles from the sedimentation basin water before it was conveyed to the 183.4KW Clearwell. The structure is part of the 183KW Sedimentation Basin Complex.

Image tags: arra, recovery act, demolition, 100k, kw, decommissioning and demolition, sedimentation basin, d4, during, k west, 183kw, filter basin, 183.3