Glove box loaded into container for disposal
Lifting a laboratory hood
Loading decontamination supplies into a glove box
Loading laboratory hoods for disposal
Glove box removed from room 146
Preparing multi-level glove box for removal
Enlarging an opening into room 146
Testing a glove box containment
Removing a temporary containment for glove box isolation
Waste shipped from PFP
Suiting up for entry
PFP vehicle barrier removal (March 2010)
Removing waste from PFP (March 2010)
Equiment size reduction in glovebox HA-28
Suiting up for entry at PFP (May 2010)
Fill project at 200 West pump and treat
Installation of a glove box panel
PFP 2701-Z access control facility before demolition
PFP inner fenceline removal
Electrical isolation of PFP access control structures
Demolition of the PFP vehicle inspection tent
Demolition of the PFP Operationsl Control Facility
Preparing for D&D at PFP
PFP Operations control facility closed for D&D
PFP fuel storage vault lift
ISVs shipped from PFP
PFP 2701Z access control facility before demolition
PFP 2701-Z building after demolition
PFP 242-Z building containment
Chiller installed at PFP
Loading glove boxes on a pallet jack
PFP containment for process vacuum system removal
Size reducing PFP process vacuum system piping 2-4-11
Removing contaminated piping from PFP
Last glovebox removed from PFP vault complex
Labeling section of piping from PFP
Loading a PFP glovebox for shipment
Removing glovebox HA-19-B2 from PFP
Removing a section of a 70-foot-long glovebox
HA19 glovebox section removed
A random sampling of photo tags throughout the site.