Advanced Search
Aerial of the 212-R interim fuel storage building
Inspection of a railcar
Draining the 200 North Area railcars
Spraying fixative into railcars
Surveying and grouting railcars
Wet grout applied to railcar
Dry grout applied to railcar
Cask car delivered to ERDF
Flat car wheels ready for disposal
A random sampling of photo tags throughout the site.