183.7KW Pipe Tunnel demolition

Sections of the 183.7KW Pipe Tunnel. The Pipe Tunnel comprised two raw water lines and a sewer line that extended from the Headhouse through the center of the 183KW Sedimentation Basin to the 190KW Process Water Pump House.

Image tags: arra, recovery act, demolition, 100k, kw, decommissioning and demolition, pipe tunnel, d4, k west, piping, 183kw, 183.7, sedimentation basin complex