Advanced Search
211-UA tanks after demolition
212-N basin after demolition
6652-T Fire Protection Lower Pump House after demolition
6652-D Pump House and Water Tank after demolition
6652-G Field Storage Building debris
Aerial of Lower ALE Reserve after demolition
Demolishing lower ALE facility foundations
212-NPR Buildings after demolition
183.1KW Headhouse after demolition (March 2010)
Remains of the 116KE Reactor Exhaust Stack
6635 Crown Castle/Cingular tower remains
6635 Crown Castle/Cingular tower remains close-up
183KW Sedimentation Basin Complex after demolition (October 2010)
PFP 2701-Z building after demolition
272-E Fabrication Shop debris
Contouring lower ALE Reserve
200-West water tower after demolition
284-W structures after explosive demolition
Remains of 284-W chimneys and baghouses
Revegetating the Arid Lands Ecology Reserve
284-E Power House Cleared
181KW after demolition
284-W Powerhouse after demolition
PFP vault complex after demolition
A random sampling of photo tags throughout the site.