Remediation beneath the 183K West Headhouse (June 2010)

An excavator removes piping from beneath the former 183K West Headhouse as demolition of the 183K West Pipe Tunnel continues in the background. The pipe tunnel spanned the width of the sedimentation basin.

Image tags: arra, recovery act, demolition, 100k, kw, sedimentation basin, pipe tunnel, d4, k west, decommissioning, headhouse, river corridor, 100k west reactor water treatment facilities, 2010, 183, june