Demolition of the 183KW Sedimentation Basin(December 2009)
Aerial of 183KW Sedimentation Basin (January 2010)
Close-up of 183KW Sedimentation Basin demolition (January 2010)
Demolition of the 183K West Filter Basin (April 2010)
Demoliton of the 183K West Sedimentation Basin (May 2010)
Remediation beneath the 183K West Headhouse (June 2010)
Demolition of the 183K West Sand Filter (June 2010)
Demolition of the 183K West Filter Basin (July 2010)
Demolition of the 183K West Sedimentation Basin (August 2010)
Aerial of 183K West Sedimentation Basin (September 2010)
Completing demolition of the 183KW Sedimentation Basin (October 2010)
Water truck at D&D of 183KW Sedimentation Basin (October 2010)
Last of the 183KW Sedimentation Basin D&D (October 2010)
Debris from the 183K West Sedimentation Basin (October 2010)
183KW Sedimentation Basin Complex after demolition (October 2010)
Silter barrier construction begins
Draining the K East sedimentation basins
100K Water Treatment Facility nears completion
K East sedimentation basins drained
Aerial of the 183KE Sedimentation Basins
Clearwell demolition begins
Removing an asbestos containment
Demolition of the K West Clearwell
K East Clearwell demolition
Equipment enters K East Clearwell
Northwest corner of the 183KE Sedimentation Basin
183-KE headhouse demolition
Clearwell D&D nearly complete
Headhouse debris loaded for disposal
Moving river pump casing
183KE sand filter demolition
Cutting casings from River Pump House
183KW Sand Filter demolition continues
110-KW Gas Recirculation Building demolition
KW River Pumphouse demo continues
Crating owls from river pumphouse
181KE River Pumphouse deconstruction
181-KE Pumphouse demolition nears completion
181-KW River Pumphouse demolition
183.3KE Filter Basin demolition
River Pumphouse pump removal
181KW after demolition
183-KE Sedimentation Basin demolition
1717-K Maintenance Shop D&D
181KW River Pump House demolition
190KE Pump House, 183KE Filter Basin demolition
1702K demolition
Checking papers for final fuel shipment
Signage on the last fuel shipment
Label on the last fuel shipment
Truck arrives for the last fuel shipment
Cold Vacuum Drying Facility
Team celebrates final fuel shipment
Inside the Cold Vacuum Drying Facility
Loaded multi-canister overpack lifted for trailer
Lifting the multi-canister overpack
Lid on a multi-canister overpack
Placing the lid on a multi-canister overpack
Lifting an MCO from the K West Basin
Loaded, sealed MCO container ready for shipment
Closeup of groundwater treatment resin
New resin delivers savings
Engineers optimize groundwater treatment
Workers process knockout pot sludge
Workers begin processing knockout pot sludge
Knockout pot processing area
Underwater sludge processing
Knockout pot sludge processing
Team celebrates sludge shipment
MCO shipment paperwork
A random sampling of photo tags throughout the site.