Bulletins: 1974 Index
File Name | Date | Description |
---|---|---|
BL-74-10b | 01/24/1975 | Failures in 4-Inch Bypass Piping at Dresden 2 |
BL-74-10a | 12/17/1974 | Failures in 4-Inch Bypass Piping at Dresden 2 |
BL-74-16 | 12/13/1974 | Improper Machining of Pistons in Colt Industries (Fairbanks-Morse) Diesel-Generators |
BL-74-15 | 12/06/1974 | Misapplication of Cutler-Hammer Three Position Maintained Switch Model No. 10250T |
BL-74-14 | 11/13/1974 | BWR Relief Valve Discharge to Suppression Pool |
BL-74-13 | Improper Factory Wiring on General Electric Motor Control Centers at Fort Calhoun | |
BL-74-12 | 10/21/1974 | Incorrect Coils in Westinghouse Type SG Relays at Trojan |
BL-74-11 | 10/16/1974 | Improper Wiring of Safety Injection Logic at Zion 1 & 2 |
BL-74-10 | 09/18/1974 | Failures in 4-Inch Bypass Piping at Dresden 2 |
BL-74-09 | 08/06/1974 | Deficiency in General Electric Model 4KV Magne-Blast Breakers |
BL-74-08 | 07/23/1974 | Deficiency in the ITE Molded Case Circuit Breakers, Type HE-3 |
BL-74-07 | 06/26/1974 | Personnel Overexposure - Irradiation Facility |
BL-74-06 | 05/22/1974 | Defective Westinghouse Type W-2 Control Switch Component |
BL-74-04a | 05/01/1974 | Malfunction of Target Rock Safety Relief Valves |
BL-74-05 | 04/12/1974 | Shipment of an Improperly Shielded Source |
BL-74-03a | 04/26/1974 | Failure of Structural or Seismic Support Bolts on Class I Components |
BL-74-04 | 03/22/1974 | Malfunction of Target Rock Safety Relief Valves |
BL-74-03 | 03/22/1974 | Failure of Structural or Seismic Support Bolts on Class I Components |
BL-74-02a | 02/22/1974 | PWR Main Steam Line Isolation Valves |
BL-74-002 | 01/22/1974 | Truck Strike Possibility |
BL-74-001a | 01/10/1974 | Abnormal Occurrences in Piping Systems |
BL-74-001 | 01/03/1974 | Valve Deficiencies |
Page Last Reviewed/Updated Thursday, April 05, 2012