Wing Lightning
A communication satellite dish is sectioned off to protect participants of the Operational Readiness Exercise at the Field Training Site on Ramstein Air Base, Germany, Oct. 16. The exercise is designed to test the ability of Airmen to survive in austere environments with chemical, biological, radiological, nuclear and explosive hazards. (U.S. Air Force photo/Airman 1st Class Marc I. Lane)(RELEASED)
|
Wing Lightning
Download Full Image E-mail a friend
Posted: 10/17/2007
|
|
|
Temp Tower
Ramstein air traffic controllers work from a mobile control tower while the existing tower receives repairs. Photo by Capt. Erin Dorrance
|
Temp Tower
Download Full Image E-mail a friend
Posted: 1/19/2007
|
|
|
New hangar at Ramstein
Brig. Gen. Rich Johnston, KMC and 86th Airlift Wing commander, speaks at the Oct. 26 opening of a C-5 maintenance hangar on Ramstein. The new facility was built to house the largest aircraft in the Air Force fleet. Photo by Senior Airman Megan Carrico
|
New hangar at ...
Download Full Image E-mail a friend
Posted: 11/3/2006
|
|
|
Rooftop
The VQ will feature a rooftop patio area where guests can enjoy outdoor refreshment while keeping informed about terminal schedules on the airfield. Photo by Senior Airman Dan Lanphear.
|
Rooftop
Download Full Image E-mail a friend
Posted: 8/24/2006
|
|
|
Transformation at Ramstein
Construction continues in front of the west entrance to the Kaiserslautern Military Community Center's at Ramstein Air Base, Germany, on Tuesday, March 28, 2006. The 840,000-square-foot facility will include an eight-story, 350-room hotel slated to open in September and the shopping mall in early 2007. (U.S. Air Force photo/Master Sgt. John E. Lasky)
|
Transformation ...
Download Full Image E-mail a friend
Posted: 3/28/2006
|
|
|
Transformation at Ramstein
The yet unfinished hotel stands tall over the Kaiserslautern Military Community Center's construction site and Ramstein Air Base, Germany, on Tuesday, March 28, 2006. The 350-room billeting is slated to open in September and the shopping mall in early 2007. (U.S. Air Force photo/Master Sgt. John E. Lasky)
|
Transformation ...
Download Full Image E-mail a friend
Posted: 3/28/2006
|
|
|
Transformation at Ramstein
The hotel stands tall over the Kaiserslautern Military Community Center's construction site at Ramstein Air Base, Germany, on Tuesday, March 28, 2006. The 350-room visitors billeting is slated to open in September and the shopping mall in early 2007. (U.S. Air Force photo/Master Sgt. John E. Lasky)
|
Transformation ...
Download Full Image E-mail a friend
Posted: 3/28/2006
|
|
|
Transformation at Ramstein
Two C-17 Globemaster IIIs taxi on the busy new ramp while construction of the new hotel continues at Ramstein Air Base, Germany, on Sunday, March 19, 2006. The 350-room billeting is slated to open in September as part of the Kaiserslautern Military Community Center. (U.S. Air Force photo/Master Sgt. John E. Lasky)
|
Transformation ...
Download Full Image E-mail a friend
Posted: 3/28/2006
|
|
|