Loading Box 29
Hand-excavation of Box 5 and 8
Inspecting a waste shipment
Mixed low-level waste shipment (January 2010)
Mock-up for working with Boxes 80 and 82
Preparing to lift a waste box from a trench
Survey of the lid of Box 82
Transporting Toxic Substances Control Act low-level waste to staging area
Surveying a super dump truck
Box 82 and cover boxes
Well drilling along the Columbia River
Applying fixative to the site of the former K East fuel storage basin
Cleaning a well casing
Sampling 200 North Area waste sites
Aerial survey of BC Control Area
Bonding high-density polyethylene piping for the DX Groundwater Treatment Facility
Steel skeleton for the DX Groundwater Treatment Facility
Well pad construction in the 100 D Area
284-E Powerhouse and Steam Plant
Loading decontamination supplies into a glove box
Loading laboratory hoods for disposal
Glove box removed from room 146
Preparing multi-level glove box for removal
Enlarging an opening into room 146
Testing a glove box containment
Removing a temporary containment for glove box isolation
Demolition of the 211-U ancillary facilities
211-UA ancillary tanks before demolition
Asbestos abatement on 224-U building
Application of fixative to equipment on U Canyon deck
211-UA tanks after demolition
Applying fixative to the U Canyon rail tunnel
Relocating equipment into U Canyon process cells
Inside U Canyon
Prepaing U Canyon equipment for relocation
Demolition of the 212-N interim fuel storage basin
212-NPR interim fuel storage building debris
Sampling of the 212-NPR building sites
212-P interim fuel storage building during demolition
Walls of the 212-P interim fuel storage buildings during demolition
Aerial of the 212-R interim fuel storage building
Demolition of the basin of the 212-R interim fuel storage basin
212-R interim fuel storage building during demolition
Demolition of the 212-R interim fuel storage building in July 2009
110KE gas storage facility before demolition
Lifting the roof of the 117KE exhaust air filter building
110KE Gas Storage Facility during demolition
183.2KW Sedimentation Basin demolition
183KW chlorine vault slab demolition
183.2KW Sedimentation Basin debris removal
183KW chemical storage silo demolition
183KW Sedimentation Basin Complex before demolition
Entering the 183.2KW Sedimentation Basin
Size reducing tools used in the K West Basin
ALE debris pile removal
6652-I building during demolition
6652-S building before demolition
6652-S building during demolition
Walkdown of 6652-I building
Biological hazard cleanup of 6652-M, 6652-M and 6652-J buildings
6652-D before demolition
Preparing for demolition on upper ALE
6652-T Fire Protection Lower Pump House during demolition
6652-T Fire Protection Lower Pump House after demolition
6652-C Shed before demolition
6652-C Shed during demolition
6652-D Pump House and Water Tank after demolition
646 Building debris
6652-G Field Storage Building debris
6652-G Field Storage Building during demolition
Aerial of Lower ALE Reserve after demolition
Lower Arid Lands Ecology Reserve
Future Site of 200 West Groundwater Treatment Facility
212-NPR Buildings before demolition
212-NPR Buildings after demolition
Waste shipped from PFP
Suiting up for entry
Installing lighting in DX Process Building
Protective transfer piping placed
Treatment tanks arrive for DX
Media visits DX facility
Resin treatment tanks arrive
Well casing inventory
Loading HDPE piping for 200 West Groundwater Treatment Facility
Demolition of MO-840 in 200 East Area
Groundbreaking for the 200 West Pump and Treat
Sampling along the Columbia River
Remediation of the 600-40 waste site
Remediation in the BC Control Area April 2010
A random sampling of photo tags throughout the site.
Environmental Policy | Legal Info