Preparing multi-level glove box for removal

Process equipment removal continues on a multi-story glove box. Multiple-level glove boxes pose ergonomic challenges to workers because they often contain more equipment and surface area to decontaminate and the glove boxes must undergo significant size reduction before they can be removed from the building.

Image tags: arra, plutonium finishing plant, recovery act, process equipment removal, pfp, glove box, removal